Refine
Year of publication
- 2020 (2) (remove)
Document Type
Language
- English (2)
Has Fulltext
- no (2)
Is part of the Bibliography
- no (2)
Keywords
- Construction robotic (1)
- Energy-efficient building (1)
- Façade (1)
- On-site (1)
- Robotics (1)
- automation (1)
- prefabrication (1)
Institute
Begutachtungsstatus
- peer-reviewed (2)
The installation of curtain wall modules (CWMs) is a risky activity carried out in the heights and often under unfavorable weather conditions. CWMs are heavy prefabricated walls that are lifted normally with bindings and cranes. High stability is needed while positioning in order not to damage the fragile CWMs. Moreover, this activity requires high precision while positioning brackets, the modules, and for that reason, intensive survey and marking are necessary. In order to avoid such inconveniences, there were experiences to install façade modules in automatic mode using robotic devices. In the research project HEPHAESTUS, a novel system has been developed in order to install CWMs automatically. The system consists of two subsystems: a cable driven parallel robot (CDPR) and a set of robotic tools named as Modular End Effector (MEE). The platform of the CDPR hosts the MEE. This MEE performs the necessary tasks of installing the curtain wall modules. There are two main tasks that the CDPR and MEE need to achieve: first is the fixation of the brackets onto the concrete slab, and second is the picking and placing of the CWMs onto the brackets. The first integration of the aforementioned system was carried out in a controlled environment that resembled a building structure. The results of this first test show that there are minor deviations when positioning the CDPR platform. In future steps, the deviations will be compensated by the tools of the MEE and the installation of the CWM will be carried out with the required accuracy automatically.
Delivering energy-efficient buildings or settlements has become a popular topic amongst architects, engineers, and building engineering physicists. There are many methods for improving building energy performances, both for new build projects and for retrofitting existing buildings. However, the construction industry faces some profound challenges to satisfy the increasing demand for energy-efficient buildings or other solutions and to be able to offer them at an affordable cost. A holistic approach has been adopted to validate whether automation robotics and off-site manufacturing technologies can yield positive changes in the delivery of energy-efficient buildings. This paper emphasizes the potential transformations and possible impacts on the design, construction, and installation process of an energy-efficient building once the advanced technologies are implemented. This paper also highlights case studies in multiple ongoing or past European Union (EU) Horizon 2020 research projects as well as private projects to demonstrate the applicability and technical feasibility of the proposed solution. The scenario proposed was used to demonstrate how to apply the proposal in a large-scale residential building project. In addition, the findings from this study will serve as proof of the concept of a larger research project, or as an inspiration for the construction industry to execute energy-efficient building projects in the future.