Refine
Document Type
- Article (17)
- conference proceeding (article) (11)
- Report (8)
- Part of a Book (7)
Is part of the Bibliography
- no (43)
Keywords
- Construction robotics (3)
- On-site (3)
- Robotics (3)
- Systems engineering (3)
- automation (3)
- prefabrication (3)
- COVID-19 (2)
- Construction 4.0 (2)
- Construction technology (2)
- Gerontechnology (2)
Institute
Begutachtungsstatus
- peer-reviewed (25)
Construction robots are devices of increased danger and, under certain conditions, can become a source of injuries to maintenance personnel, as well as lead to the failure of technological equipment. Most of the accidents are associated with the presence of maintenance personnel in the working area during programming, configuration, training, repair and maintenance of robots. The article describes measures to ensure safety during the maintenance of robots and manipulators. The stages of preparing the construction industry for the use of manipulators, robots and robotic complexes are presented. A system of measures for preparing equipment for use and its maintenance during operation is proposed.
REACH stands for “Responsive Engagement of the Elderly Promoting Activity and Customized Healthcare”. Sustained physical activity matters greatly to the health and well-being of older people and significantly improves their chance of maintaining independent living. It can make a difference across the whole care continuum as well as in almost every setting. Therefore, REACH solutions focus on the systematic, target-oriented increase of physical activity of older people, and tackle the whole prevention spectrum (primary, secondary, and tertiary). It seeks to empower older people and their formal and informal caregivers, and works towards viable solutions for both the formal and in-formal care sector. Technology-based personalization of prevention, activation, and care services provided in various living and care settings is at the center of the developed solutions. Ideally toolkit approach would allow for the tailoring of solutions that create value for end-users, care providers and health care payers alike through the combination, integration and adaptation/re-design elements towards the different contexts of different countries, different payment and reimbursement structures. This Special Issue sheds light on such solutions, their conception, their development, and their testing.
This deliverable report examines the outcome of the construction of functional or partly functional prototypes or mock-ups of Personalized Interior Intelligent Environment Units (PI²Us) for demonstration and testing purposes, associated with Task T5.4. The first part of this document will give an overview of the relation of this task to other tasks of WP5, other work packages, and the larger framework of the REACH project. The second part sets out the details of the progressive development from early concepts to the current prototyping stage. Moreover, the subsequent lab-based testing is described in the third part of the report. This includes both already carried out and planned testing activities for either early stage validation or final demonstration in a naturalistic test environment. Finally, part four summarizes the results and puts the different prototypes in perspective to the respective touchpoints and the overall REACH engine functionality. This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 690425.
A need exists for faster installation of prefabricated modules in the refurbishment market. Current solutions for installing and fitting prefabricated modules on existing buildings are time consuming. The objective of this research is to reduce the time currently required for the installation of timber-based 2D modules by using innovative technologies while improving placement accuracy. A novel installation concept was proposed based on a digitally produced matching kit interface that corrects existing building’s irregularities and connector placement deviations. This solution was tested, validated, and compared in several manufacturing contexts. The tests recorded measurable variables such as the manufacturing time and placement accuracy of the modules. The results demonstrate decreases up to 73% in installation time and placement deviations of less than 2 mm.
This chapter presents additional research and development on offsite modular manufacturing of interior subsystems – to transform real estate stock to future demands triggered by demographic challenges, thereby allowing instant deployment. It explores the use of innovative systems for prefabrication. Regarding offsite production and manufacturing, the transformation of parts and low-level components into higher-level components by highly mechanised, automated or robot-supported industrial settings therefore needs to take place. Construction automation for offsite manufacturing, requires the integration of products, organisation, informational aspects, and machine technology in order to maximise efficiency and deliver product quality. A construction-kit cell can confine the production-unit elements in a specific area of the building, yet contain a greater capacity than an upgraded existing environment. A fully robotic construction industry will require significant research and development – of each product, process, and participant of the building production process.
Construction robots are expected to have disruptive impacts on the building industry, but 8 there is still a lack of utilisation. While significant attention has been paid to technical 9 advancement, little has been done to comprehensively understand the broader societal issues 10 associated with the use of this technology. This paper aims to provide a holistic exploration 11 of the influencing factors of the future utilisation of construction robots in a systems manner, 12 analyse the interactions among these factors and identify the key ones that are most 13 influential in shaping the technological transformation. A modified fuzzy decision-making 14 trial and evaluation laboratory (DEMATEL) method is developed and applied. Hong Kong 15 was selected as the desirable case for the study due to its vibrant yet challenging built 16 environments. Factors were first systematically identified and synthesised before being 17 empirically verified, evaluated and analysed through the modified fuzzy DEMATEL. The 18 results demonstrate the multi-faceted and complexly interrelated factors influencing the 19 utilisation of construction robots. Eleven influencing factors were determined as critical for 20 shaping the future trajectory of robotic applications, among which “construction cost”, 21 “governmental support” and “the scale of prefabrication” are the most influential ones. The 22 findings indicate that more interdisciplinary efforts and broader non-technical discussions are 23 needed to achieve the successful transition of the industry towards robotic construction. The 24 findings further reveal the driving forces of environmental pressures behind the future 25 utilisation of construction robots. Detailed utilisation scenarios which fit to the evolution of 26 the whole society are recommended for future research.
As use of digital fabrication increases in architecture, engineering and construction, the industry seeks appropriate management and processes to enable the adoption during the design/planning phase. Many enablers have been identified across various studies; however, a comprehensive synthesis defining the enablers of design for digital fabrication does not yet exist. This work conducts a systematic literature review of 59 journal articles published in the past decade and identifies 140 enablers under eight categories: actors, resources, conditions, attributes, processes, artefacts, values and risks. The enablers' frequency network is illustrated using an adjacency matrix. Through the lens of actor-network theory, the work creates a relational ontology to demonstrate the linkages between different enablers. Three examples are presented using onion diagrams: circular construction focus, business model focus and digital twin in industrialisation focus. Finally, this work discusses the intersection of relational ontology with process modelling to design future digital fabrication work routines.
As use of digital fabrication increases in architecture, engineering and construction, the industry seeks appropriate management and processes to enable the adoption during the design/planning phase. Many enablers have been identified across various studies; however, a comprehensive synthesis defining the enablers of design for digital fabrication does not yet exist. This work conducts a systematic literature review of 59 journal articles published in the past decade and identifies 140 enablers under eight categories: actors, resources, conditions, attributes, processes, artefacts, values and risks. The enablers’ frequency network is illustrated using an adjacency matrix. Through the lens of actor-network theory, the work creates a relational ontology to demonstrate the linkages between different enablers. Three examples are presented using onion diagrams: circular construction focus, business model focus and digital twin in industrialisation focus. Finally, this work discusses the intersection of relational ontology with process modelling to design future digital fabrication work routines.
Guest Editorial Introduction to the Focused Section on Mechatronics and Automation for Constructions
(2021)
Rapid advances in modern technologies have completely revolutionized many industries in recent years. It is anticipated that mechatronic and automation technologies would play an important role in transforming the construction industry to embrace for the fourth industrial revolution. However, construction automation problems bring up new research challenges that diverge from traditional methods. Unlike the factory environment, which is typically structured and predictable, construction sites are dynamic places where the working environment is unstructured and always changing. Due to lack of skilled labor, time and cost overruns, quality deficiencies, and the recent pandemics, mechatronic and automation technologies offer solutions for future safe, rapid, performative, prize worthy, and digitally protocolled construction projects. The coexistence of human workers, heavy vehicles, varying environmental conditions, and automated mechatronic systems also make safe human–machine interaction an important issue. Beyond expertise in a specific discipline, construction automation also requires multidisciplinary expertise to integrate with various fields, such as Internet of Things (IOT), robotics and its construction oriented subsystems, adaptive/robust control, machine vision, sensing technologies, artificial intelligence (AI), and building/construction/process information modeling (BIM/CIM/PIM) for automated construction process management and design. The main aims of this focused section in the IEEE/ASME Transactions on Mechatronics (TMECH) are to document the current state of the art in mechatronics and automation for constructions, and to present new results in several emerging research areas.