- peer-reviewed (3)
A cable-driven parallel robot (CDPR) was developed for the installation of curtain wall modules (CWM). The research addressed the question of whether the CDPR was capable installing CWMs with sufficient accuracy while being competitive compared to conventional manual methods. In order to develop and test such a system, a conceptual framework that consisted of three sub-systems was defined. The tests, carried out in two close-to-real demonstration buildings, revealed an absolute accuracy of the CWM installation of 4 to 23 mm. The working time for installing a CWM was reduced to 0.51 h. The results also show that the system is competitive for a workspace greater than 96 m2 compared to conventional manual methods. However, improvements such as reducing the hours for setting up the CDPR on the one hand and achieving a faster and more robust MEE on the other hand will be still necessary in the future.
Purpose:
Because of the sharply growing interest worldwide of “hard” physical-mechanical robot systems for the execution of on-site construction tasks [i.e. single-task construction robots (STCRs)], the purpose of this study is to equip development projects with a systematic design-management system model that allows to integrate the different needs and aims of stakeholders.
Design/methodology/approach:
This paper proposes a STCR-technology management system (STCR-TMS) for the complete development cycle of STCR designs. The STCR-TMS is based on established principles from systems engineering and management and STCR-specific activities developed and tested by the authors as standalone elements in previous research work.
Findings:
The application of the STCR-TMS revealed the practicability of the method and the underlying concepts to provide practical guidance for the development process. Additional findings indicate that the method is sufficiently generic and flexible for application to different types of robots and indifferent world regions. This research has also shown that key activities need to be addressed to increase the practicability of the STCR-TMS.
Originality/value:
A unique characteristic of this method is the evolution with each utilization cycle. In addition, individual elements are interchangeable and can be adapted based on external circumstances. These properties allow the TMS to be applied to other fields in construction robotics. With the progression of the verification and validation of the method, know-how and certain elements can be fed into standardization activities (e.g. establishing a management system standard).
Single-task construction robots (STCRs) have become a popular research topic for decades. However, there is still a gap in the ubiquitous application of STCRs for onsite construction due to various reasons, such as cost concerns. Therefore, cost–benefit analysis (CBA) can be used to measure the net economic benefit of the STCRs, compared to traditional construction methods, in order to boost the implementation of STCRs. This paper presents a simple and practical framework for the economic evaluation of STCRs and conducts a case study of a cable-driven facade installation robot to verify the method. The results show that the cable-driven robot for facade installation is worth investing in in the UK, as well as in the majority of G20 countries. Furthermore, other socioenvironmental implications of STCRs and the limitations of the study are also discussed. In conclusion, the proposed method is highly adaptable and reproducible. Therefore, researchers, engineers, investors, and policy makers can easily follow and customize this method to assess the economic advantages of any STCR systems, compared to traditional construction technologies.