Risk and reliability criteria are well established in many industrial sectors such as the offshore, chemi- cal or nuclear industries. Comparative risk thresholds have been specified to allow a responsible organization or regulator to identify activities, which impose an acceptable level of risk concerning the participating individuals, or society as a whole. The scope of this contribution is to present target reliability criteria based on acceptable human safety levels. Application of theoretical principles is illustrated by examples of railway engineering structures. Initially it is shown how civil engineering structures for which human safety criteria play a role are classified according to Eurocodes. Examples include bridges, tunnels or station buildings. The general concepts for risk acceptance are then briefly reviewed, particularly in their relation to the target reliability criteria. The distinction between the two types of criteria is made: group risk and the acceptance criterion based on the Life Quality Index LQI approach introduced by ISO 2394:2015. The differences between the criteria for new and existing structures are discussed. The application is illustrated by an example of a bridge crossing an important railway line. It appears that while benefits and costs of a private stakeholder or public authority are reflected by economic optimisation, the society should define the limits for human safety to achieve uniform risks for various daily-life activities and across different industrial sectors. Keywords: group risk, human safety, individual risk, Life Quality Index, railway, risk acceptance, structure, target reliability
The target reliability levels recommended in various national and international documents for new and existing structures are quite different and vaguely related to types of structures and consequences of failure. The optimum reliability levels can be obtained by considering the total expected cost of the structure over the design working life. Indicative values of reliability indexes are given in EN 1990 (2002) for two reference periods, 1 year and 50 years. The annual target reliability levels βt1 are presently indicated in the recent draft of EN 1990 (2017) without any explicit link to different reference period or design working life. When determining the target reliability index for the reference period of n years that generally differs from the design working life, correlation of failure events in subsequent years should be taken into account. Considering the annual reliability index β1 an approximate formula is proposed for the reliability index βnk related to the reference period of n years and independence interval of k years. The independence interval k ≤ n corresponds to the mean time period in years for which the failures in subsequent periods of k years are assumed to be mutually independent. The operational use of the proposed formula is clarified by practical tools. The reliability differentiation reflected in consequence classes is also discussed in this contribution.
This paper addresses the optimisation of monitoring and decision-making criteria regarding the future use of structures. The current state of practice in standards and reliability framework are initially summarised. A general methodology for obtaining cost-optimal decisions is then presented on the basis of limit state design, probabilistic reliability analysis and cost estimates. The implementation of the risk-based approach is illustrated in a case study dealing with the roof of a stadium located in northern Italy. As the roof fails to comply with the requirements of the Eurocodes, the installation of a permanent monitoring system is recommended to allow for a real-time reliability assessment. The results demonstrate the potential of monitoring systems and probabilistic reliability analysis for supporting decisions regarding safety measures such as snow removal or temporary closure of the stadium, as well as reflecting the need to implement the discussed procedures in future standards.
Prescriptive and risk-based methods including qualitative, semi-quantitative and quantitative approaches exist for the risk assessment of road tunnels. This paper provides an overview and a brief discussion of these methods and uses representative traffic and accident data in Greece in a typical tunnel conforming with the minimum infrastructure requirements of the European Directive 2004/54/EC to compare and discuss the resulting risk for each of these methods. Conclusions regarding the implementation of risk analysis methods and the use of the associated existing national guideline are drawn and recommendations for further developments in standards are provided. An integrated framework for the optimal selection of safety measures based on risk reduction and socio-economic considerations is proposed and its applicability in risk analysis of road tunnels is discussed. (C) 2016 Elsevier Ltd. All rights reserved.
Specifying the target reliability levels is one of the key issues in the assessment of existing structures. For a majority of existing buildings and infrastructures, the design life has been reached or will be reached in the near future. These structures need to be reassessed in order to verify their safety. Eurocodes provide a general basis primarily intended for the design of new structures, but the basic principles can be used for assessing existing buildings, too. Reliability levels are generally based on both economic optimization and criteria for human safety. In this study, both methods are elaborated for existing structures. It appears that the requirement for the same target reliability for existing and new structures is uneconomical. Further, cost optimization seems to yield rather low reliability levels and human safety criteria often become the critical factor. The study concludes with practical guidelines for establishing reliability indices for existing structures linked to Eurocode principles.
Specification of target reliability levels is one of the key issues of the assessment of existing structures. ISO 13822:2010 and ISO 2394:2015 indicate procedures for specification of target reliability levels by optimisation of the total cost related to an assumed remaining working life of a structure. These approaches are critically compared with human safety criteria, with target levels based on a marginal life-saving costs principle, and with recommendations of present standards. Optimal target reliability levels are then derived in the representative case study for an existing structural member. It appears that the requirement to reach the same target reliability levels for existing and new structures is uneconomical. Decisions made in the assessment can result in the acceptance of the actual state or in the upgrade of an existing structure. Two reliability levels are thus needed - the minimum level below which the structure is unreliable and should be upgraded, and the target level indicating an optimum upgrade strategy. It is recommended that these levels be established using economic optimisation and the marginal life-saving costs principle, as both the approaches take into account the costs of safety measures and the failure consequences.
Natural and technological hazards have a major impact on environmental and human safety. Risk assessment plays an essential role in the risk management of the effects of such hazards. This contribution summarizes first the general formulation of risk depending on two parameters: hazard probability and associated consequences. Problems faced in industrial applications based on the experience of the author are discussed. Risk acceptance criteria for the contributors to risk i.e. human, economic and environment are critically reviewed. Resilience based criteria are also included and conclusions for future developments are provided.
Structural health monitoring (SHM) projects are mostly based on semi-empirical decisions, emphasising the importance of the structure and lacking a rational comparison of the benefits and costs. The present work offers guidance to overcome this, based on an objective framework using the quantification of the value of SHM in an engineering context. Firstly, procedures for practising engineers are outlined on the basis of the COST guidelines. Secondly, a case study, focused on the reliability of a historic masonry structure, demonstrates the optimisation of surveys based on non-destructive tests calibrated by destructive tests. Both the outlined procedures and case study are carefully prepared and in tune, so the reader can easily understand the feasibility of the framework. Decisions on the utilisation of SHM in practical applications can be effectively achieved based on the highest expected utility gained by SHM. For this, two scenarios are needed: (i) a scenario with at least one SHM strategy and (ii) a scenario without any SHM.
The changing climate with resulting more extreme weather events will likely impact infrastructure assets and services. This phenomenon can present direct threats to the assets as well as significant indirect effects for those relying on the services those assets deliver. Such threats are path-dependent and place-specific, as they strongly depend on current and future climate variability, location, asset design life, function and condition. One key question is how climate change is likely to increase both the probability and magnitude of extreme weather events under different scenarios of climate change. To address this issue, this paper investigates selected effects of climate change and their consequences on structural performance, in the context of evolving loading scenarios in three different continental regions: Europe, North America, and Asia. The aim is to investigate some main place-specific changes of the exposure in terms of intensity/frequency of extreme events as well as the associated challenges, considering some recent activities of members of the IABSE TG6.1. Climate change can significantly affect built infrastructure and the society by increasing the occurrence and magnitude of extreme events and increasing potential losses. Therefore, specific relationships relating hazard levels and structural vulnerability to climate change effects should be determined.
The assessment of existing infrastructures in the energy sector is of great economic significance worldwide. Fossil power stations are reaching their design service life and rational decisions concerning extensions of service life, maintenance and replacements of devices should be based on updated information of the actual conditions of the energy devices and their components, and on cost-benefit analysis using risk analysis and probabilistic optimisation procedures.
The contribution provides an integrated framework for probabilistic reliability and risk assessment of existing energy production units considering availability and human safety criteria. An extensive case study focused on risks of an energy production unit in a fossil power station is provided to support practical applications. A Bayesian network is thereby implemented to assess the risks of the selected production unit. Special emphasis is given to the input data consisting of failure rates obtained from recorded data and expert judgements. The influence of uncertainties in the considered performance indicators on the availability of the unit is analysed. It is shown that a reasonably simplified framework can provide a valuable assessment of the influence of individual devices and their components on availability and societal risk, identifying thus the major risk contributors. (C) 2017 Elsevier Ltd. All rights reserved.