TY - CHAP A1 - Englberger, Julian A1 - Herrmann, Frank A1 - Claus, Thorsten T1 - Independent Requirements Consumption in Master Production Scheduling in an Uncapacitated Environment T2 - Informatics, Microsystems, Information Systems. Proceedings. 2012 KW - Produktionsplanung KW - Kundenorientierung Y1 - 2012 SN - 9785733909301 VL - Vol. 1(1) ER - TY - CHAP A1 - Lange, Frederick A1 - Herrmann, Frank T1 - Verbesserung der operativen Produktionsplanung durch Belastungsinformationen T2 - Tagungsband der 7. Wismarer Wirtschaftsinformatik-Tage, Wismar, 2012 KW - Produktionsplanung KW - Operative Planung KW - Belastungsorientierte Fertigungssteuerung Y1 - 2012 ER - TY - CHAP A1 - Herrmann, Frank T1 - Forecasting in production planning by adaptive exponential smoothing methods T2 - Proceedings of the 25th European Conference on Operational Research (EURO XXV), Vilnius, Lithuania, 8-11 July, 2012 KW - Produktionsplanung KW - Prognosemodell KW - Exponential smoothing Y1 - 2012 ER - TY - CHAP A1 - Herrmann, Frank T1 - Scheduling a flow-shop with simultaneously loaded stations T2 - Proceedings of the International Annual Conference of the German Operations Research Society 2012,(OR 2012), September 4 - 7, Hannover KW - Fließfertigung KW - Flow-shop-Problem KW - Reihenfolgeproblem Y1 - 2012 ER - TY - CHAP A1 - Herrmann, Frank T1 - Simulative analysis of storage strategies for pallet warehouses T2 - Informatics, Microsystems, Information System, Proceedings, 2012 KW - Palette KW - Lagerhaltung KW - Strategisches Management KW - Simulation Y1 - 2012 VL - Vol. 1(1) ER - TY - JOUR A1 - Herrmann, Frank T1 - Einstellung von Dispositionsarten in ERP- und PPS-Systemen JF - Productivity Management Y1 - 2011 IS - 3 SP - 45 EP - 47 PB - GITO-Verlag CY - Berlin ER - TY - JOUR A1 - Englberger, Julian A1 - Herrmann, Frank A1 - Manitz, Michael T1 - Two-stage stochastic master production scheduling under demand uncertainty in a rolling planning environment JF - International Journal of Production Research N2 - This paper proposes a scenario-based two-stage stochastic programming model with recourse for master production scheduling under demand uncertainty. We integrate the model into a hierarchical production planning and control system that is common in industrial practice. To reduce the problem of the disaggregation of the master production schedule, we use a relatively low aggregation level (compared to other work on stochastic programming for production planning). Consequently, we must consider many more scenarios to model demand uncertainty. Additionally, we modify standard modelling approaches for stochastic programming because they lead to the occurrence of many infeasible problems due to rolling planning horizons and interdependencies between master production scheduling and successive planning levels. To evaluate the performance of the proposed models, we generate a customer order arrival process, execute production planning in a rolling horizon environment and simulate the realisation of the planning results. In our experiments, the tardiness of customer orders can be nearly eliminated by the use of the proposed stochastic programming model at the cost of increasing inventory levels and using additional capacity. KW - Hierarchische Produktionsplanung KW - Fertigungsprogrammplanung KW - Nachfrageverhalten KW - Stochastische Optimierung KW - Master production scheduling KW - Demand uncertainty KW - Two-stage stochastic programming KW - Scenario-based stochastic programming with recourse KW - Hierarchical production planning Y1 - 2016 U6 - https://doi.org/10.1080/00207543.2016.1162917 VL - 54 IS - 20 SP - 6192 EP - 6215 PB - Taylor & Francis ER - TY - JOUR A1 - Herrmann, Frank T1 - Automatisierte Durchführung von Bestandsmanagement-Projekten JF - wt Werkstattstechnik online N2 - Ein effizientes und effektives Bestandsmanagement ist wichtig, um die Auswirkungen etwa durch fehlende Produkte gering zu halten und die Lagerhaltungskosten zu minimieren. Die für viele Unternehmen geeigneten Formeln zum Bestandsmanagement und seine produktspezifische Anwendung werden in einem Leitfaden zusammengefasst und anhand eines realen Anwendungsfalls in diesem Fachbeitrag beschrieben. Eine manuelle Durchführung ist besonders aufwendig. Deshalb wird erläutert, welche Schritte des Leitfadens effektiv durch ein entsprechendes Programm durchgeführt werden können. KW - Bestandsmanagement Y1 - 2010 UR - https://www.werkstattstechnik.de/wt/article.php?data[article_id]=57155 IS - 10 SP - 819 EP - 824 CY - Berlin ER - TY - JOUR A1 - Herrmann, Frank A1 - Burgmayr, Georg T1 - Verknüpfung von Software zu einem IT-Logistiknetzwerk JF - MaschinenMarkt online N2 - Softwaresysteme sind für den Betrieb moderner Logistik- und Herstellungsbetriebe essenziell. Doch kaum eine auf dem Markt angebotene Lösung kann alle Anforderungen in Lager und Montage lückenlos abdecken. Kleine und mittlere IT-Unternehmen schließen sich zusammen - und damit diese Marktlücke. KW - Logistikunternehmen KW - Software Y1 - 2011 UR - https://www.mm-logistik.vogel.de/verknuepfung-von-software-zu-einem-it-logistiknetzwerk-a-297008/ PB - Vogel Business Media CY - Würzburg ER - TY - CHAP A1 - Herrmann, Frank ED - Fuchs, Gerhard ED - Müller, Christian ED - Ritz, Harald ED - Saint-Mont, Uwe T1 - Evaluierung von Standardsoftware zur Abbildung von Geschäftsprozessen T2 - Herausforderungen an die Wirtschaftsinformatik: Wissensmanagement, E-Business und ereignisgesteuerte Geschäftsprozesse in Echtzeit Y1 - 2007 U6 - https://doi.org/10.15771/978-3-936527-10-0 SP - 52 EP - 69 PB - Verlag News & Media CY - Berlin ER - TY - CHAP A1 - Herrmann, Frank A1 - Stumvoll, Ulrike T1 - Einstellung von Losgrößenheuristiken in ERP- bzw. PPS-Systemen T2 - Proceedings zu den 7. Wismarer Wirtschaftsinformatik-Tagen vom 3.-4. Juni 2010 an der Hochschule Wismar KW - PPS KW - Enterprise-Resource-Planning KW - Losgrößenplanung KW - Heuristik Y1 - 2010 ER - TY - CHAP A1 - Claus, Thorsten A1 - Herrmann, Frank T1 - Simulation als betriebliche Entscheidungshilfe T2 - Ergänzungsband zu den Proceedings zur 14. ASIM Fachtagung "Simulation in Produktion und Logistik", vom 6. bis 8. Oktober 2010 am Karlsruher Institut für Technologie, Karlsruhe KW - Produktion KW - Logistik KW - Simulation KW - Entscheidungsprozess Y1 - 2010 ER - TY - CHAP A1 - Herrmann, Frank T1 - Berechnung des Werts von Informationen im Supply Chain Management T2 - Tagungsband zum 100. MNU-Bundeskongress ; Regensburg, 5. bis 9. April 2009 KW - Supply Chain Management KW - Informationsmanagement Y1 - 2009 ER - TY - JOUR A1 - Wohanka, Christian A1 - Herrmann, Frank T1 - Anbindung von Halbleiter Fertigungsautomaten an die SAP NetWeaver Plattform JF - Industrie-Management KW - Fertigung KW - Automation KW - Halbleiterbauelement KW - SAP NetWeaver Y1 - 2008 IS - 2 SP - 39 EP - 42 PB - Gito Verlag CY - Bremen ER - TY - JOUR A1 - Heindl, Martina A1 - Herrmann, Frank T1 - Verkürzung von Ein- und Auslagerzeiten in Lagerprozessen JF - PPS-Management KW - Lagerhaltung KW - Lagerplanung Y1 - 2007 VL - 12 IS - 4 SP - 47 EP - 50 PB - GITO Verlag CY - Berlin ER - TY - BOOK A1 - Herrmann, Frank T1 - Operative Planung in IT-Systemen für die Produktionsplanung und -steuerung BT - Wirkung, Auswahl und Einstellhinweise von Verfahren und Parametern N2 - Die operative Planung in der Produktionslogistik besteht im Kern aus der Prognose von Bedarfen, dem Management von Lagerbeständen, der Planung des Produktionsprogramms, der Materialbedarfsplanung und der Fertigungssteuerung. Kommerziell verfügbare Enterprise Resource Planning-Systeme oder Produktionsplanungs- und -steuerungssysteme bieten hierfür sehr viele Verfahren mit vielen Einstellungsmöglichkeiten an, die in diesem Buch detailliert erläutert werden. Die ausführlichen Beispiele und Fallstudien erleichtern das Nachvollziehen der Einzelschritte dieser Verfahren. Die Alternativen haben zum Teil signifikante Auswirkungen auf Parameter wie Termineinhaltung, Durchlaufzeit und Kapitalbindung, die das Erreichen der Unternehmensziele maßgeblich beeinflussen. Zur Unterstützung von Anwendern wird die Wirkung dieser Einstellungsmöglichkeiten analysiert und es werden Hinweise bzw. Leitfäden zu ihrer Einstellung gegeben. KW - Enterprise-Resource-Planning KW - Operative Planung KW - PPS Y1 - 2011 SN - 978-3-8348-8172-4 U6 - https://doi.org/10.1007/978-3-8348-8172-4 PB - Vieweg+Teubner ER - TY - CHAP A1 - Vitzthum, Thorsten A1 - Claus, Thorsten A1 - Herrmann, Frank T1 - Can Aggregate Production Planning (APP) be modified to be as good as Master Production Scheduling (MPS) T2 - ACC Journal N2 - In diesem Beitrag wird anhand einer Fallstudie die Bedeutung der Hauptproduktionsprogrammplanung (HPPLAN) für die hierarchische Produktionsplanung herausgearbeitet werden. Dazu wird versucht das Ergebnis der aggregierten Gesamtplanung (AGGRPLAN) durch Veränderung einzelner Paramater so zu verbessern, dass es dem Ergebnis der HPPLAN entspricht. Im Rahmen der Untersuchungen konnten dabei Verbesserungen für einzelne Planungssituationen erzielt werden, eine generelle Lösung konnte jedoch nicht gefunden werden. Insbesondere der Einsatz eines geeigneten Kapazitätsreduktionsfaktors in Verbindung mit der Berücksichtigung der Durchlaufzeit führt zu einer Verbesserung der Lösung. Bei der Planung von mehr als einem Produkt ist allerdings schwierig einen geeigneten Kapazitätsreduktionsfaktor zu finden, da dieser abhängig von der Nachfrage ist. KW - Hierarchische Produktionsplanung KW - Fertigungsprogrammplanung KW - Fallstudie KW - Hierarchical production planning KW - Aggregate production planning (APP) KW - Master production scheduling (MPS) KW - Material requirement planning KW - Resource profiles Y1 - 2017 U6 - https://doi.org/10.15240/tul/004/2017-2-012 VL - 23 IS - 2 SP - 155 EP - 162 ER - TY - BOOK A1 - Herrmann, Frank T1 - Logik der Produktionslogistik N2 - Für kosteneffiziente und flexible Produktionsprozesse wurden und werden zunehmend ausgefeilte Verfahren eingesetzt. Sie entstammen dem Operations Research, der, deswegen, nach wie vor eine hohe Produktivität aufweist. Diese Verfahren berufen sich auf grundlegende Resultate der Produktionslogistik, die sich beweisen lassen und daher zeitlos gültig sind. Ihre Kenntnis ist für das Verständnis und die Einsatzmöglichkeiten, insbesondere die Grenzen, dieser Verfahren erforderlich. Es erlaubt auch die grundlegenden Stärken und Schwächen von manchen aktuell diskutierten Ansätzen zu analysieren. Die Konzepte und Verfahren werden im Detail begründet bzw. hergeleitet; dies schließt die Beweise ein, die überwiegend aus dem Internet heruntergeladen werden können. Zum schrittweisen Nachvollziehen der Konzepte und der Einzelschritte der Verfahren dienen die ausführlich erläuterten Beispiele. Das Buch richtet sich an Studierende der Wirtschaftswissenschaften, der Wirtschaftsinformatik und dem Operations Research sowie an Experten und Wissenschaftler, die sich für die Theorie zur Produktionslogistik interessieren. Stärken und Schwächen von aktuell diskutierten Ansätzen aufdecken. KW - Fertigungslogistik Y1 - 2009 SN - 978-3-486-84856-4 PB - Oldenbourg ER - TY - CHAP A1 - Trost, Marco A1 - Teich, Enrico A1 - Claus, Thorsten A1 - Herrmann, Frank T1 - Master Production Scheduling and the relevance of included social criteria T2 - ACC Journal N2 - Folgender Beitrag untersucht die Notwendigkeit einer Berücksichtigung von Mitarbeiterauslastungen und davon abhängiger Bearbeitungszeiten in der Hauptproduktionsprogrammplanung. Zudem wird aufgezeigt, dass dieses Themengebiet aktuell eine Forschungslücke darstellt. Aus diesem Grund wird ein selbst entwickeltes lineares Optimierungsmodell für die Hauptproduktionsprogrammplanung vorgestellt, welches soziale Kriterien und eine geeignete Fallstudie enthält. Die Ergebnisse verdeutlichen, dass erhebliche Abweichungen durch eine Ignoranz von Mitarbeiterauslastungen und davon abhängiger Bearbeitungszeiten entstehen. Deshalb ist eine Integration zu empfehlen. Allerdings wird auch deutlich, dass weitere Forschungen notwendig sind, speziell für die Bestimmung geeigneter Erschöpfungsfunktionen, so wie beispielsweise Funktionen für Lerneffekte existieren. KW - Fertigungsprogrammplanung KW - Personaleinsatz KW - Lineare Optimierung KW - Sustainability KW - Production planning and control KW - Master production scheduling KW - Linear optimization KW - Human fatigue Y1 - 2017 U6 - https://doi.org/10.15240/tul/004/2017-2-011 VL - 23 IS - 3 SP - 146 EP - 154 ER - TY - CHAP A1 - Trost, Marco A1 - Claus, Thorsten A1 - Herrmann, Frank T1 - Adapted Master Production Scheduling: Potential for Improving Human Working Conditions T2 - Proceedings of the 33th European Conference on Modelling and Simulation 2019 (ECMS), Caserta, Italy N2 - This article illustrates the problem of deficient working conditions like high work intensity and underlines the possibilities of production planning and control to improve them. However, an included literature search presents that previous approaches have predominantly considered social aspects within a short planning horizon and that there is a need for a long-term consideration. To address this research gap a linear optimization model for Master Production Scheduling is presented, which has been extended by basic aspects of personnel requirements planning and a control of personnel work intensity. The results show that improvements in working conditions can be achieved through adapted production planning without an automatically increase in costs. However , challenges in quantifying the corresponding social correlations are identified as well. KW - Produktionsplanung KW - Personalbedarfsplanung KW - Lineare Optimierung KW - Master Production Scheduling KW - Sustainability KW - Work Intensity KW - Workload Y1 - 2019 U6 - https://doi.org/10.7148/2019 VL - 33,1 SP - 310 EP - 316 ER - TY - CHAP A1 - Vitzthum, Thorsten A1 - Claus, Thorsten A1 - Herrmann, Frank T1 - Einfluss von Mitarbeiterqualifikationszeiten im Rahmen nachhaltiger Produktionsplanung T2 - Simulation in Produktion und Logistik 2017, Kassel, 20.-22. September N2 - This research paper evaluates the potential of reducing shortages and costs that are created by training measures as an example for measurement of extended qualification of key employees in sustainable production planning. Capacity planning with standard methods in Enterprise Resource Planning Systems, namely priority rules, are used. Almost always, the optimal solution is not found, although there is one. In addition, unnecessarily high stocks are built up. In real business situations, this causes lost profits. T2 - Influence of Employee Qualification Times in the Context of Sustainable Production Planning KW - Enterprise-Resource-Planning KW - Produktionsplanung KW - Betriebliche Fortbildung Y1 - 2017 UR - http://www.asim-fachtagung-spl.de/asim2017/papers/Proof_111_Vitzthum.pdf SP - 315 EP - 324 ER - TY - CHAP A1 - Forstner, Robert A1 - Stauber, Stephan A1 - Herrmann, Frank T1 - Simulationsstudie zur sequentiellen Behälterversorgung in der automatischen Intralogistik T2 - Simulation in Produktion und Logistik 2017, September 20 - 22, 2017, Kassel, Germany N2 - After explaining the necessity of sequential sorting processes within branched conveyor systems and introducing basic sequential controlling principles, this paper analyses with a simulation study different ways of implementing sequential supply processes for small load carriers in an abstracted automated intralogistics system. Simulation results show that a layout with sequencing systems with explicit buffer places can ensure much higher sequential throughput performances than a layout with a loop for sequencing or a layout which implements sequencing processes just with the control of carrier sources. Because of sequential control dependencies in the layout with buffer places, further experiments for sequential supply processes with different layouts forms have to be assessed. KW - Förderanlage KW - Sortieranlage KW - Materialflusssteuerung KW - Transportbehälter KW - Simulation Y1 - 2017 UR - http://www.asim-fachtagung-spl.de/asim2017/papers/Proof_124_Forstner.pdf SP - 489 EP - 498 ER - TY - JOUR A1 - Janssen, Larissa A1 - Diabat, Ali A1 - Sauer, Jürgen A1 - Herrmann, Frank T1 - A stochastic micro-periodic age-based inventory replenishment policy for perishable goods JF - Transportation Research Part E: Logistics and Transportation N2 - In this paper, we propose a micro-periodic inventory replenishment policy for quickly perishable goods with fixed and known lifetime of items, deterministic lead time, fixed given order cycle, mixed issuing policies (FIFO and LIFO), age-based stock, imperfect items and target customer service level under random demand. The inventory policy is based on time of day (morning, midday, afternoon or evening). The results of our simulation study show that the proposed micro-periodic inventory policy leads to waste reduction of 66% as well as a partial decrease in cost compared to inventory policy with planning on a daily basis. KW - Frischware KW - Bestandsmanagement KW - Bestellmengenplanung KW - Stochastisches Modell KW - Inventory KW - Micro-periodic KW - Perishable goods KW - Stochastic demand KW - Waste reduction KW - Simulation study KW - Simulation Y1 - 2018 U6 - https://doi.org/10.1016/j.tre.2018.08.009 VL - 118 IS - October SP - 445 EP - 465 PB - Elsevier ER - TY - JOUR A1 - Trost, Marco A1 - Teich, Enrico A1 - Claus, Thorsten A1 - Herrmann, Frank T1 - Ein lineares Optimierungsmodell zur Hauptproduktionsprogrammplanung mit Berücksichtigung sozialer Größen JF - uwf UmweltWirtschaftsForum N2 - Aufgrund weniger existenter sozialorientierter Forschungen im Rahmen der Produktionsplanung und -steuerung stellt dieser Beitrag ein lineares Optimierungsmodell für die Hauptproduktionsprogrammplanung vor, welches soziale Kriterien berücksichtigt. Erste Ergebnisse deuten an, dass geringe Kosten nicht durch eine maximierte Mitarbeiterauslastung entstehen sondern durch geringe Kapazitätsschwankungen. KW - Sustainability KW - Social dimension KW - Production planning and control KW - Master production scheduling KW - Linear optimisation KW - Hierarchische Produktionsplanung KW - Fertigungsprogrammplanung KW - Personaleinsatz KW - Lineare Optimierung Y1 - 2017 U6 - https://doi.org/10.1007/s00550-017-0454-7 VL - 25 SP - 71 EP - 80 ER - TY - BOOK A1 - Claus, Thorsten A1 - Herrmann, Frank A1 - Teich, Enrico T1 - Kostensimulation BT - Grundlagen, Forschungsansätze, Anwendungsbeispiele KW - Kostenanalyse KW - Simulation Y1 - 2019 SN - 978-3-658-25167-3 U6 - https://doi.org/10.1007/978-3-658-25168-0 PB - Springer Gabler CY - Wiesbaden ER - TY - CHAP A1 - Trost, Marco A1 - Claus, Thorsten A1 - Teich, Enrico A1 - Selmair, Maximilian A1 - Herrmann, Frank T1 - Social and Ecological Capabilities for a sustainable Hierarchical Production Planning T2 - Proceedings of the 30th EUROPEAN Conference on Modeling and Simulation (ECMS 2016), May 31st - June 3rd, 2016, Regensburg, Germany N2 - Production planning and production control mainly focus on optimising the entire production system of a company. On the basis of hierarchical planning as a suitable method for solving this task, this paper shows - besides the economic dimension taken into account so far - that there are also social and ecological effects which will have to be considered in the process of planning. For this purpose, we would like to indicate here which social and ecological parameters can be or have already been taken into account for master production scheduling, for lot sizing and resource scheduling. As a result, an overview has been created which presents the existing concepts of sustainable production planning and production control as well as the existing deficits regarding the sustainability perspective. KW - Hierarchische Produktionsplanung KW - Soziale Verantwortung KW - Ökologie KW - production planning KW - hierarchical planning KW - social variables KW - ecological variables KW - sustainable hierarchical production planning Y1 - 2016 U6 - https://doi.org/10.7148/2016-0432 ER - TY - CHAP A1 - Janssen, Larissa A1 - Herrmann, Frank A1 - Claus, Thorsten T1 - Beitrag zur Abfallreduktion mittels mathematischer Optimierung und simulationsbasierter Validierung BT - A contribution to the waste reduction by mathematical optimisation and simulation-based validation T2 - Proceedings of the 16th International Conference on Simulation in Production and Logistics, September 23 - 25, 2015, Dortmund, Germany N2 - Perishable goods with a shelf life of 3-5 days require frequent inventory controls in the food retail trade. Maintaining a high service level for these products in stores is difficult due to demand uncertainty. A high service level often leads to a lot of stock in stores. In case it is not sold, it is waste. As an approach towards waste volume reduction, the economic order quantity (EOQ) problem is optimised in combination with the delivery frequency problem on the basis of the microperiods, i.e. morning, midday, afternoon, and evening. The presented model is designed for multiple stores with one regional warehouse. The simulation model measures the waste volume in stores. Experiments show that the combined optimisation of both problems leads to a reduction of total costs and waste volume. KW - Bestandsmanagement KW - Bestellmengenplanung KW - Optimierung KW - Frischware Y1 - 2015 UR - http://www.asim-fachtagung-spl.de/asim2015/papers/Proof_127_Janssen-V2.pdf ER - TY - CHAP A1 - Selmair, Maximilian A1 - Herrmann, Frank A1 - Claus, Thorsten A1 - Teich, Enrico T1 - Potential of Reducing the Total Energy Consumption by Scheduling a Jobshop Production System T2 - Proceedings of the 16th International Conference on Simulation in Production and Logistics, September 23 - 25, 2015, Dortmund, Germany N2 - This research paper has evaluated the potential of reducing energy consumption by scheduling jobshop production systems with machines using standby modes in free times. The initial introduction of the planning issue is followed by a description of the approach to assess the available potential. Subsequently, the research procedure by means of simulation, a detailed discussion of the results and a perspective on future research is given. Moreover, the notion that scheduling influences the energy consumption in jobshop production systems is supported. The presented simulation research also documents that there is no direct correlation between energy consumption and total lead time, although this was presumed usually. Finally, this paper provides a forecast for a possible optimisation model as well as an exemplary model with an energy-optimised schedule plan. KW - Produktionsplanung KW - Reihenfolgeproblem KW - Energieverbrauch Y1 - 2015 SP - 375 EP - 384 ER - TY - CHAP A1 - Selmair, Maximilian A1 - Claus, Thorsten A1 - Trost, Marco A1 - Bley, Andreas A1 - Herrmann, Frank T1 - Job Shop Scheduling with Flexible Energy Prices T2 - Proceedings of the 30th EUROPEAN Conference on Modeling and Simulation, May 31st - June 3rd, 2016, Regensburg, Germany N2 - The rising energy prices – particularly over the last decade – pose a new challenge for the manufacturing industry. Reactions to climate change, such as the advancement of renewable energies, raise the expectation of further price increases and variations. Regarding the manufacturing industry, production planning and controlling can have a significant influence on the in-plant energy consumption. In this paper, we develop a scheduling method as a linear optimization model with the objective to minimize energy costs in a job shop production system. KW - Job Shop Scheduling KW - Flexible Energy Prices KW - Energy Efficient Production Planning KW - Energy Consumption KW - Standby Y1 - 2016 U6 - https://doi.org/10.7148/2016-0488 ER - TY - CHAP A1 - Herrmann, Frank A1 - Lange, Frederick A1 - Manitz, Michael T1 - Order release within hierarchical production planning and control using product specific clearing functions T2 - Proceedings of the International Annual Conference of the German Operations Research Society 2014 (OR 2014), Aachen, September 2 - 5, 2014, Germany KW - Hierarchische Produktionsplanung KW - Auftragsabwicklung KW - clearing functions Y1 - 2014 ER - TY - CHAP A1 - Herrmann, Frank T1 - Schrittweise Verbesserung des Realbetriebs einer Produktionslinie mit simultanem Produktionsfortschritt T2 - Tagungsband zu "Wissenstransfer in der Wirtschaftsinformatik" im Rahmen der MKWI 2016; vom 09. bis 11. März 2016 an der Technischen Universität Ilmenau in Thüringen KW - Produktionslinie KW - Produktionsfortschritt Y1 - 2016 SP - 19 EP - 26 ER - TY - CHAP A1 - Herrmann, Frank A1 - Manitz, Michael T1 - Some remarks to the shape of Clearing Functions T2 - Proceedings of the International Annual Conference of the German Operations Research Society 2015 (OR 2015) Wien, September 1 - 4 KW - clearing functions KW - production planning Y1 - 2015 ER - TY - CHAP A1 - Herrmann, Frank T1 - Observations to Clearing Functions T2 - Proceedings of the 28th EURO Conference on Operations Research, July 12 - 15, 2015, Glasgow, Scotland KW - clearing functions Y1 - 2015 ER - TY - BOOK A1 - Herrmann, Frank T1 - Übungsbuch - Losbildung und Fertigungssteuerung BT - Aufgaben zur operativen Produktionsplanung und -steuerung N2 - Das Aufgabenbuch ergänzt die in Lehrbüchern erläuterten Verfahren der Losbildung und Fertigungssteuerung durch sehr detaillierte und präzise Lösungen. Losbildung und Fertigungssteuerung sind zentrale Kernelemente der operativen Produktionsplanung und -steuerung, insbesondere in kommerziell verfügbaren IT-Systemen. Daher sind diese Verfahren integrale Bestandteile von Veranstaltungen zur Produktion und Logistik, Produktionsplanung und -steuerungsysteme, Supply Chain Management usw. in Bachelor- und Masterstudiengängen an Hochschulen und Universitäten. Zu Beginn einer Lösung wird die verwendete Methodik soweit dargestellt, dass diese mit den in entsprechenden Vorlesungen gelehrten Inhalten ohne weitere Literatur verständlich ist. Einige Themen, wie die Betrachtung von knappen Kapazitäten und von schwankenden Durchlaufzeiten, gehen über den Inhalt von Standardlehrbüchern hinaus und dürften auch für Doktoranden interessant sein. KW - Produktionsplanung KW - Produktionssteuerung KW - PPS KW - Losgröße KW - Operative Planung KW - Aufgabensammlung Y1 - 2018 SN - 978-3-658-21567-5 U6 - https://doi.org/10.1007/978-3-658-21567-5 PB - Springer Fachmedien CY - Wiesbaden ER - TY - BOOK A1 - Herrmann, Frank A1 - Manitz, Michael T1 - Materialbedarfsplanung und Ressourcenbelegungsplanung BT - Durchführung in Produktionsplanungs- und -steuerungssystemen und ihre Analyse KW - Materialbedarf KW - Produktionsplanung KW - Produktionssteuerung KW - PPS Y1 - 2017 SN - 978-3-658-12543-1 U6 - https://doi.org/10.1007/978-3-658-12543-1 PB - Springer Gabler CY - Wiesbaden ER - TY - JOUR A1 - Herrmann, Frank T1 - SIM-R/3: Softwaresystem zur Simulation der Regelung produktionslogistischer Prozesse durch das R/3-System der SAP AG JF - Wirtschaftsinformatik N2 - State of the art in enterprises is the control of business processes by enterprise resource planning systems (ERP systems) such as the R/3 system of SAP AG. A typical task in the implementation phase of ERP systems consists in the choice of an appropriate lot sizing procedure and the setup of its parameters. The existing procedures do not deliver the best results for each business process. So, a business specific setup is required. Unfortunately, there is no knowledge of good parameter settings for typical business processes. Therefore, different parameter settings have to be tested out on real business processes over long periods (e. g. over several years). Of course, such an approach fails due to time restrictions. In addition, the literature argues that an automated software process — contrary to a physical process — is often never called in question or further optimized. An alternative offers a simulation of business processes which is controlled by an ERP system. In the laboratory of information science and production logistics (LIP) at the University of Applied Sciences, Regensburg, a pilot implementation of a system for simulating the control of production processes by the SAP R/3-System (SIM-R/3) was developed. SIM-R/3 allows such a simulation over long periods. KW - Fertigungslogistik KW - Enterprise-Resource-Planning KW - Simulation KW - SAP R/3 KW - eM-Plant KW - Regelung produktionslogistischer Prozesse KW - Planungsverfahren und-parameter in ERP-Systemen Y1 - 2007 U6 - https://doi.org/10.1007/s11576-007-0034-5 VL - 49 IS - 2 SP - 127 EP - 133 ER - TY - CHAP A1 - Herrmann, Frank A1 - Lange, Frederick A1 - Almeder, Christian T1 - Capacity estimation based on clearing functions for the capacitated lot-sizing problem T2 - Proceedings of the 5th International Workshop on Lot-Sizing, August 26th - 29th, 2014, Porto, Portugal N2 - Single-stage capacitated lot-sizing problems (CLSP) are essential for manyplanning tasks in production systems. Due to the hierarchical planning approach, which is widely used in industrial practice and implemented in commercial enterprise resource planning as well as production planning and controlsystems, a subsequent scheduling is necessary to gain executable productionplans. Capacity consumption depends on many factors as, for example, systems workload, machine availability, or yield. Thus, a feasible and optimalsolution of the CLSP may lead to unplanned delays after sequencing and processing the orders on the shop floor. Using a so called clearing function (CF),which represents the relationship between the workload and the output of a production system, this capacity consumption in a CLSP is improved in various ways and tested on a real-world application. KW - Hierarchische Produktionsplanung KW - Kapazitätsplanung KW - Losgröße KW - clearing functions Y1 - 2014 UR - https://www.emse.fr/~absi/IWLS2014/proceedings_IWLS_2014.pdf ER - TY - CHAP A1 - Herrmann, Frank T1 - Genetic algorithm with simulation for scheduling of a flow shop with simultaneously loaded stations T2 - Proceedings of the 28th EUROPEAN Conference on Modeling and Simulation, May 27th - 30th, 2014, Brescia, Italy N2 - In this study, a real world flow shop with a transportation restriction is regarded. This restriction reduces the set of feasible schedules even more than the no-buffer restrictions discussed in the literature in the case of limited storage. Still this problem is NP-hard. Since this scheduling problem is integrated in the usual hierarchical planning, the tardiness is minimised. Compared to even specific priority rule for this class of problems the suggested genetic algorithm delivers significant better results. The specific structure of this class of problems complicates the calculation of the performance criteria. This is solved by a simulation algorithm. Proceedings 28th European Conference on Modelling and Simulation. KW - Ablaufplanung KW - Hierarchische Produktionsplanung KW - Flow-shop-Problem KW - Reihenfolgeproblem KW - Genetischer Algorithmus KW - simulation of restrictions KW - scheduling KW - flow-shop KW - no-buffer (blocking) KW - no-wait KW - genetic algorithm KW - real world application Y1 - 2014 UR - http://www.scs-europe.net/dlib/2014/ecms14papers/simo_ECMS2014_0076.pdf ER - TY - JOUR A1 - Herrmann, Frank T1 - Simulation der Regelung von Unternehmensprozessen durch ein Enterprise Ressource Planning System am Beispiel von SAP R/3 Y1 - 2007 UR - https://www.hs-nordhausen.de/fileadmin/_migrated/content_uploads/FHN_Schriftenreihe_Heft_3_Herrmann_08_06_2007_01.pdf PB - Verlag der Hochschule Nordhausen ER - TY - JOUR A1 - Herrmann, Frank A1 - Tsakpinis, Athanassios A1 - Wiedermann, Wolfgang T1 - Praxisnahe Ausbildung an der FH-Regensburg mit dem Schwerpunkt SAP JF - Krcmar, Helmut; Rautenstrauch, Claus; Wittges, Holger und Schrader; Heino (Hrsg.): Wirtschaftsinformatik-Ausbildung mit SAP®-Software KW - Hochschulstudium KW - Wirtschaftsinformatik KW - Praxisbezug Y1 - 2006 PB - Josef Eul Verlag CY - Lohmar – Köln ER - TY - RPRT A1 - Wohanka, Christian A1 - Helmstreit, Herbert A1 - Herrmann, Frank T1 - Anbindung von Halbleiter Fertigungsautomaten an die SAP NetWeaver Plattform T2 - Forschungsbericht der Hochschule Regensburg KW - Fertigung KW - Automation KW - Halbleiterbauelement KW - SAP NetWeaver Y1 - 2006 SP - 51 EP - 58 PB - Weka Info Verlag CY - Regensburg ER - TY - CHAP A1 - Herrmann, Frank T1 - Simulated Determination and Usage of a Clearing Function for Leadtime Estimation T2 - Proceedings of the 27th EURO Conference on Operations Research, July 13 - 18, 2014, Barcelona, Spain KW - clearing functions KW - lead time estimation Y1 - 2014 ER - TY - RPRT A1 - Herrmann, Frank A1 - Kreutz, Michael T1 - Simulations-System für das R/3-System (SIM-R/3) der SAP AG T2 - Forschungsbericht der Hochschule Regensburg KW - SAP R/3 KW - Simulation Y1 - 2006 SP - 46 EP - 50 PB - Weka Info Verlag CY - Regensburg ER - TY - RPRT A1 - Heindl, Martina A1 - Herrmann, Frank A1 - Juraske, Erich T1 - Simulation von Einlagerstrategien T2 - Forschungsbericht der Hochschule Regensburg KW - Lagerhaltung KW - Raumbedarf KW - Simulation Y1 - 2007 SP - 30 EP - 39 PB - Weka Info Verlag CY - Regensburg ER - TY - JOUR A1 - Herrmann, Frank T1 - Scheduling a flow shop with simultaneously loaded stations: A real world application JF - Journal of Control Science and Engineering N2 - Companies use special designed flow shops, in order to satisfy specific demands. Products need to be transported (from one station to the next station) by a crane and the way of working of this crane excludes the intermediate storage (of a work piece). In addition, the way of working restricts the set of feasible schedules even more than the no-buffer restriction discussed in the literature in the case of limited storage. Since this scheduling problem is integrated in the usual hierarchical planning, the tardiness is minimised. A linear optimisation model is presented to provide a formal description of this NP-hard problem. It is also used to explain the performance of priority rule based heuristic solutions on small test problems. In detail, priority rules as well as a priority rule based branch and bound procedure are analysed; priority rules are regarded, because a priority rule is still the standard procedure for on-line scheduling in industrial practise. Out of successful priority rules in the literature the best one is identified by an extensive simulative investigation. An improved look-ahead is realised by a restricted search over all possible schedules. KW - Fließfertigung KW - Flow-shop-Problem KW - Scheduling KW - Real world flow shop with restrictions KW - No buffer and no wait KW - Minimising tardiness KW - Optimisation model KW - Priority rules KW - Priority rule based branch and bound procedure Y1 - 2015 U6 - https://doi.org/10.17265/2328-2231/2015.03.004 VL - 3 SP - 147 EP - 163 ER - TY - CHAP A1 - Vitzthum, Thorsten A1 - Herrmann, Frank T1 - Evidence of the Relevance of Master Production Scheduling for Hierarchical Production Planning. T2 - Proceedings, 31st European Conference on Modelling and Simulation (ECMS) 2017, 23rd - May 26th, Budapest, Hungary N2 - This paper deals with the significance of master production scheduling for hierarchical production planning. Production planning in a typical manufacturing organization is a sequence of complex decisions which depends on a number of factors, such as number of products, complexity of products, number of production sites, and number of work centres in each production site. The main idea in hierarchical production planning is to break down larger problems into smaller, more manageable sub problems. Starting with aggregate production planning, the benefits of using master production scheduling for material requirements planning will be conveyed. The main benefit of master production scheduling is more detailed planning. The production groups are thereby disaggregated into final products and the production site disaggregated into work centres. In order to plan capacities, resource profiles are used. By working with resource profiles production lead time data are taken into account to provide time-phased projections of the capacity requirements for each work centre (Vollmann et al. 2005). The case study will show that more accurate planning and consideration of production lead time through master production scheduling results in a demand program that can be realized without shortages or delays. KW - Hierarchische Produktionsplanung KW - Fertigungsprogrammplanung Y1 - 2017 SN - 978-0-9932440-4-9 U6 - https://doi.org/10.7148/2017-0475 ER - TY - CHAP A1 - Amann, Matthias A1 - Herrmann, Frank A1 - Lutz, Christian A1 - Meier, Markus ED - Barton, Thomas ED - Erdlenbruch, Burkhard ED - Herrmann, Frank ED - Müller, Christian T1 - Grad der Zerstörung für eine lokale Suche bei einer taktgetriebenen Fließfertigung T2 - Prozesse, Technologien, Anwendungen, Systeme und Management. Angewandte Forschung in der Wirtschaftsinformatik. Tagungsband zur 27. AKWI-Fachtagung vom 07. bis 10.09.2014 an der Oberbayerischen Technischen Hochschule Regensburg N2 - Unternehmen produzieren oftmals viele Varianten für ein kleines Kundensegment und in kleinen Stückzahlen auf sehr teuren Produktionsanlagen. Deren effiziente und effektive Nutzung erfordert eine möglichst gute Planung der Belegung der Stationen mit Aufträgen. Sehr wirkungsvoll bei Fertigungslinien sind lokale Suchverfahren. Sie erzielen ein lokales Optimum. Um ein globales Optimum zu erreichen, wird die Suche von einem anderen Punkt des Suchraums fortgesetzt. Dabei sollte kein willkürlicher Punkt gewählt werden, sondern nur ein Teil des lokalen Optimums zerstört werden. Unterschiedlich starke Zerstörungen werden für eine taktgetriebene Fließfertigung analysiert. KW - Fließvertigung KW - Fertigungsplanung KW - Optimierung Y1 - 2014 UR - http://www.akwi.de/documents/AKWI_Tagungsband2014.pdf SP - 44 EP - 54 PB - Verlag News & Media CY - Berlin ER - TY - CHAP A1 - Lange, Frederick A1 - Herrmann, Frank A1 - Claus, Thorsten T1 - Simulation based capacity estimation for a model of order release planning under the consideration of service levels T2 - Proceedings of the 15th International Conference on Simulation in Production and Logistics, October 9 - 11, 2013, Paderborn, Germany N2 - Clearing Functions describe the nonlinear relationship between the orders which are in process and the output in capacitated productions systems under high utilization. These Clearing Function can be derived analytical by using steady-state queuing models or empirical by using simulation. We show how to estimate a Clearing Function for a single-level multi-product production system by using a simulation model. This non-linear Clearing Function is integrated into a model of order release planning. We extend this model to consider the uncertainty of the demand by using a Beta service level. We compare our model with an inventory management policy under different demand conditions. KW - Clearing function KW - linear programming KW - order release planning KW - simulation Y1 - 2013 UR - http://www.scs-europe.net/conf/ecms2013/ecms2013proceedings.pdf SN - 978-0-9564944-6-7 SP - 741 EP - 747 ER - TY - CHAP A1 - Herrmann, Frank T1 - Simulation based priority rules for scheduling of a flow shop with simultaneously loaded stations T2 - Proceedings of the 27th EUROPEAN Conference on Modeling and Simulation, May 27th - 30th, 2013, Ålesund, Norway N2 - In this study, a real world flow shop with a transportation restriction is regarded. This restriction reduces the set of feasible schedules even more than the no-buffer restrictions discussed in the literature in the case of limited storage. Since this scheduling problem is integrated in the usual hierarchical planning, the tardiness is minimised. This NP-hard problem is solved by priority rules, because of the addressed dynamic environment (and a high number of jobs) at the company site. Due to the technological restrictions the real duration of a job is significantly larger than its net processing time. By a simulation of the processing time many priority rules are improved and some even significantly. With extensive simulations successful priority rules in the literature are analysed. KW - simulation of processing time KW - scheduling KW - flow-shop KW - no-buffer (blocking) KW - no-wait KW - priority rules KW - real world application KW - Hierarchische Produktionsplanung KW - Flow-shop-Problem KW - Reihenfolgeproblem Y1 - 2013 U6 - https://doi.org/10.7148/2013-0775 SP - 775 EP - 781 ER - TY - CHAP A1 - Metlicka, Magdalena A1 - Davendra, Donald A1 - Herrmann, Frank A1 - Meier, Markus A1 - Amann, Matthias T1 - GPU accelerated NEH algorithm T2 - Proceedings of the 2014 IEEE Symposium on Computational Intelligence in Production and Logistics Systems (CIPLS), Orlando, FL, 09.-12. Dec. 2014 N2 - This research aims to develop a CUDA accelerated NEH algorithm for the permutative flowshop scheduling problem with makespan criterion. NEH has been shown in the literature as the best constructive heuristic for this particular problem. The CUDA based NEH aims to speed up the processing time by utilising the GPU cores for parallel evaluation. In order to show the versatility and scalability of the CUDA based NEH, four new higher dimensional Taillard sets are generated. The experiments are conducted on the CPU and GPU and pairwise compared. Percentage relative difference and paired t-test both confirm that the GPU based NEH significantly improves on the execution time compared to the sequential CPU version for all the high dimensional problem instances. KW - Flow-shop-Problem KW - CUDA KW - Graphics processing units KW - Instruction sets KW - Kernel KW - Parallel processing KW - Synchronization KW - Algorithm design and analysis KW - Arrays KW - Parallelverarbeitung Y1 - 2014 U6 - https://doi.org/10.1109/CIPLS.2014.7007169 SP - 114 EP - 119 ER - TY - CHAP A1 - Herrmann, Frank T1 - Perturbation in Local Search for Scheduling T2 - Proceedings of the 29th EUROPEAN Conference on Modeling and Simulation, May 26th - 29th, 2015, Albena, Bulgaria N2 - Local search is an established meta heuristic for scheduling problems. To avoid of getting stucked in a local optimum, the achieved solution is destroyed. Usually, this is done randomly. Here, two problem specific procedures are suggested. One focuses on jobs with the highest difference between the actual processing time and the net processing time of the job and the other one tries to remove jobs which causes the highest idle time for themselves or other jobs. Comprehensive simulations of test scheduling problems as well as a real world application show that both problem specific procedures outperform a random procedure. KW - Ablaufplanung KW - Lokales Suchverfahren KW - Local search KW - Perturbation KW - Scheduling KW - Flow shop KW - Flow-shop-Problem Y1 - 2015 U6 - https://doi.org/10.7148/2015-0446 ER - TY - CHAP A1 - Herrmann, Frank T1 - Simulation of a stochastic model for master production scheduling in a hierarchical production planning system used in industrial practise to cope with demand uncertainty T2 - Proceedings of the 26th EURO Conference on Operations Research, July 1 - 4, 2013, Rome, Italy N2 - Demand uncertainty for master production scheduling is addressed over the last years by approaches of stochastic or robust optimisation. In this contribution a more detailed model is regarded. Instead of analysing the planning results by a cost function, and so implicitly assume that the plans are realizable, here the effects of robust master production scheduling are evaluated using a planning hierarchy that is common in industrial applications. The primary objective is to minimise tardiness of customer order deliveries, and the secondary objective is to minimise inventory of end products. Y1 - 2013 ER - TY - CHAP A1 - Englberger, Julian A1 - Herrmann, Frank T1 - Estimating Capacity Load Factors in Master Production Scheduling by the use of Stochastic Optimization T2 - Tagungsband zu der Tagung Logistikmanagement 2013, 10. - 13. Oktober 2013, Bremen, Deutschland KW - Produktionsplanung KW - Ablaufplanung KW - Kapazitätsplanung KW - Stochastische Optimierung Y1 - 2013 ER - TY - CHAP A1 - Davendra, Donald A1 - Herrmann, Frank A1 - Bialic-Davendra, Magdalena T1 - Scheduling tardiness constrained flow shop with simultaneously loaded stations using Genetic Algorithm T2 - Proceedings of the 4th International Conference on Intelligent Systems, Metaheuristics & Swarm Intelligence (ISMSI 2020): Thimphu, Kingdom of Bhutan during March 21-22, 2020 N2 - In this study, a real world flow shop with a transportation restriction is regarded. This restriction reduces the set of feasible schedules even more than the no-buffer restrictions discussed in the literature in the case of limited storage. Still this problem is NP-hard. Since this scheduling problem is integrated in the usual hierarchical planning, the tardiness is minimised. Compared to even specific priority rule for this class of problems the suggested genetic algorithm delivers significant better results. The specific structure of this class of problems complicates the calculation of the performance criteria. This is solved by a simulation algorithm. KW - simulation of restrictions KW - scheduling, KW - flow-shop KW - no-buffer (blocking) KW - no-wait KW - genetic algorithm KW - real world application KW - Ablaufplanung KW - Hierarchische Produktionsplanung KW - Flow-shop-Problem KW - Reihenfolgeproblem KW - Genetischer Algorithmus Y1 - 2020 U6 - https://doi.org/10.1145/3396474.3396475 PB - ACM ER - TY - CHAP A1 - Trost, Marco A1 - Claus, Thorsten A1 - Teich, Enrico A1 - Herrmann, Frank T1 - Die soziale Dimension in der nachhaltigen hierarchischen Produktionsplanung – Stand der Forschung und Ansätze zur Weiterentwicklung bestehender Planungsmodelle T2 - Proceedings zur NAMA 2016 (NAMA 2016), October 5th - 7th, 2016, Dresden, Germany N2 - Bei der Produktionsplanung steht die Optimierung des Produktionssystems eines Unternehmens im Vordergrund. In diesem Beitrag wird auf Basis der hierarchischen Produktionsplanung aufgezeigt, dass neben ökonomischen und ökologischen Aspekten insbesondere auch soziale Effekte bei der Entscheidungsfindung zu berücksichtigen sind. Dazu werden für die Hauptproduktionsprogrammplanung, die Losgrößenplanung und die Ressourcenbelegungsplanung dargelegt, welche sozialen Größen berücksichtigt werden können beziehungsweise bereits berücksichtigt sind. Überdies wird ein Modellansatz zur Hauptproduktionsprogrammplanung vorgestellt, der auf die Beseitigung identifizierter Forschungslücken abzielt. KW - Hierarchische Produktionsplanung KW - Nachhaltigkeit KW - Soziale Verantwortung Y1 - 2016 ER - TY - CHAP A1 - Fuchs, Michael A1 - Herrmann, Frank A1 - Manitz, Michael T1 - A Lagrangian relaxation based approach for the capacitated multi-level lot sizing problem with stochastic demands T2 - SMMSO 2019 - 12th Conference on Stochastic Models of Manufacturing and Service Operations, June 9th - 14th, 2019, Goslar, Germany KW - Kapazitätsbelegungsplanung KW - Nachfrageermittlung KW - Stochastischer Prozess KW - Lagrange-Relaxation Y1 - 2019 ER - TY - CHAP A1 - Manitz, Michael A1 - Herrmann, Frank A1 - Munninger, Maximilian T1 - Considering sequence-dependent stochasticity in production schedules T2 - Proceedings of the International Annual Conference of the German Operations Research Society 2017 (OR 2017), Berlin, September 6 - 8, 2017 KW - Produktionsplanung KW - Ablaufplanung KW - Reihenfolgeproblem KW - Stochastischer Prozess Y1 - 2017 ER - TY - CHAP A1 - Terbrack, Hajo A1 - Herrmann, Frank A1 - Claus, Thorsten T1 - Determining an optimal energy demand range within master production scheduling T2 - Proceedings of the International Annual Conference of the German Operations Research Society 2019 (OR 2019) Dresden, September 3 - 6, 2019 KW - Produktionsplanung KW - Ablaufplanung KW - Energiebedarf Y1 - 2019 ER - TY - JOUR A1 - Herrmann, Frank A1 - Reiter, Christian T1 - Losbildung bei einem Engpass an Lagerfläche im Presswerk eines Automobilzulieferers JF - Anwendungen und Konzepte der Wirtschaftsinformatik N2 - Die im Presswerk eines Automobilzulieferers benötigte Lagerfläche stieg in den letzten Jahren so gewaltig an, dass die bisher verwendeten Produktionslose manuell reduziert werden mussten, um überhaupt einlagern zu können. Die dadurch sich ergebenden höheren Kosten werden quantifiziert. Zur Verbesserung werden die strukturellen Unterschiede zwischen den neuen Losen und den durch ein Standardverfahren in ERP-Systemen gelieferten Losen analysiert. Diese Unterschiede zeigen, dass die 2. Stufe in diesem 2-stufigen Vorgehen – 1. Los berechnen und dann 2. dieses geeignet reduzieren – die Entscheidungen der ersten Stufe in der Regel vollständig revidiert. Ein integrativer Ansatz ist erforderlich. Dies erfolgt durch ein lineares Optimierungsmodell mit beschränkter Lager fläche. Das ILOG - Tool, ein Standardwerkzeug zur Lösung linearer Optimierungsmodelle, löst dieses Modell innerhalb von Minuten. Dass mit diesem optimalen Verfahren die Kosten substantiell verringert werden, wird simulativ nachgewiesen. Seit einigen Monaten wird dieses Verfahren im Rahmen einer rollenden Planung im Presswerk eingesetzt. Eine rollende Planung bewirkt in der Regel einen Verlust in der Lösungsgüte. In diesem Fall wurden nahezu optimale Lösungen erreicht, mit denen die Kosten substantiell verringert wurden. Die Werksleitung und die Mitarbeiter sind mit diesem neuen Verfahren sehr zufrieden. KW - Engpass an Lagerfläche KW - signifikant beschränkter Lagerplatz KW - ERP-System KW - SAP System KW - Losgrößenverfahren KW - Silver Meal-Verfahren KW - Feste Losgröße KW - Wagner-Whitin-Verfahren KW - Optimierungs - modell mit beschränktem Lagerplatz Y1 - 2019 U6 - https://doi.org/10.26034/lu.akwi.2019.3238 SN - 2296-4592 VL - 10 IS - 10 SP - 54 EP - 71 PB - AKWI ER - TY - CHAP A1 - Trost, Marco A1 - Claus, Thorsten A1 - Herrmann, Frank T1 - Master production scheduling with consideration of social aspects for networking with human resources requirements planning T2 - Proceedings of the International Annual Conference of the German Operations Research Society 2018 (OR 2018), Brüssel, September 12 - 14, 2018 N2 - A large number of current research focuses on the sustainable orientation of business processes. However, it is often neglected that, next to the ecological and economic dimension, the social dimension is also an important pillar of sustainability. Therefore, the intended contribution focuses on the integration of social aspects into the Master Production Scheduling and thus achieves a network between production planning and human resources requirements planning. The study shows that previous papers on production planning and control usually ignore the social dimension. Exceptions are works that take advantage of learning and forgetting effects at the lot-sizing and scheduling. In addition, there are various papers in the scheduling area which aim to reduce employee workload by optimizing resource allocation. Thus, however, only an optimal distribution of burden is achieved. Therefore, this paper presents a long-term management of the burden. To this end, the classic Master Production Scheduling, which has been statically limited in terms of capacity, whereby additional capacities have been used, will be expanded. At the same time, human resources requirements planning is based on assumptions regarding the expected capacity requirements. The created linear optimization model, addresses these weak points. A flexible available capacity is integrated on the basis of existing sales orders. It is making possible, to build up and reduce capacities, whereby technical restrictions (number of workplaces) and labor market conditions (number of available employees, qualification of employees and experience of employees) are also mapped. This represents a significant progress compared to previous models, whereby the target function minimizes costs. Further progress has been made in investigating the effects of exhaustion. The ratio of capacity requirements to available capacity was controlled externally as employee utilization and processing times dependent on the employee's utilization were taken into account. Subsequently, different utilization situations were examined under the assumption of different exhaustion and random demand patterns with the aim of determining an optimal employee utilization. A key finding of this study is that - contrary to common assumptions - achieving cost benefits is not necessarily associated with maximizing utilization, but rather with controlling employee utilization. An additional effect results from the reduction of the employee burden. However, the flexible capacity available does not limit the performance of the production system. In addition, we are currently working on the investigation of effects in a long-term planning horizon and of consequences for the downstream planning levels of production planning and control. Overall, the contribution presents an innovative research project that aims to integrate social aspects into production planning in order to make a contribution to truly sustainable models in the future. KW - Produktionsplanung KW - Ablaufplanung KW - Soziale Verantwortung Y1 - 2018 ER - TY - CHAP A1 - Trost, Marco A1 - Claus, Thorsten A1 - Herrmann, Frank T1 - Adapted Master Production Scheduling: Analysis on the impact of relevant social performance indicators from the GRI standard T2 - Proceedings of the International Annual Conference of the German Operations Research Society 2019 (OR 2019) Dresden, September 3 - 6, 2019 N2 - The sustainable development of processes is currently an important topic in industry and science. Various interest groups and other factors like resource shortages or a lack of skilled workers drive this trend. In the area of Production and Operation Management, the integration of sustainable aspects is also becoming more and more important. However, mainly ecological aspects are considered. Thus, this contribution expands the previous research by the integration of social aspects. For this, we limit our research to the Master Production Scheduling as part of operational production planning. In the context of sustainability, the Global Reporting Initiative (GRI) Standard has established itself for companies and other organisations to report on their sustainability activities. It is the first and most widely adopted global standards for sustainability reporting. The aim of this standard is to measure the sustainable performance and in this way, sustainability activities can be oriented to specific performance indicators. Accordingly, the GRI standard enables concrete initiatives to improve social, environmental and economic conditions for everyone. The modular standard comprises 36 standard modules. For this paper, the 19 social modules were analysed and relevant indicators that could be influenced by the Master Production Scheduling were identified. One of the important indicators from the GRI standard for our research question is the use of employees, measured in terms of hiring and employee turnover. The long-term employee commitment and thus low fluctuation will become a competitive advantage in the future, which is enhanced by the demographic change and the lack of skilled workers. In order to integrate these aspects based on the GRI standard, the classic formulation of Master Production Scheduling is extended. For this a control of the employee utilization within concrete utilization intervals as well as dependent processing times due to different exhaustion effects were integrated. Additionally, in order to take into account the requirements of a flexible production and to model the use of employees, aspects of personnel requirements planning are considered as well, which enable the build-up and reduction of capacity. As a result, social and economic consequences of related production scenarios are presented. In this context, a conflict of targets arises especially with macroeconomic fluctuations. On the one hand, shortages and inventories should be avoided from an economic point of view. On the other hand, a low and constant work intensity as well as a constant number of staff should be preferred for long-term employee commitment. Accordingly, the ability of the model to examine these questions, which will become more and more important for industrial enterprises in the future, becomes clear. Furthermore, it can be seen that it is possible to improve social aspects by adapted production planning without neglecting economic targets. KW - Produktionsplanung KW - Ablaufplanung KW - Soziale Verantwortung KW - Global Reporting Initiative KW - Sustainable Development KW - Capacity Planning KW - Linear Programming Y1 - 2019 ER - TY - CHAP A1 - Herrmann, Frank T1 - Scheduling in case of a Partially Automated Production T2 - Proceedings of the International Annual Conference of the German Operations Research Society 2016 (OR 2016), Hamburg, 30.8. - 4.9.2016 N2 - In recent years, a considerable amount of interest has arisen for scheduling problems with technological restrictions. For example, no-buffer flow-shop scheduling problem are well investigated. Here a real world flow shop with a transportation restriction is regarded. It has to produce small batches, very often with a lot size of one, with short response times. Thus, scheduling algorithms are needed to ensure that under the constraint of a high average load of the flow shop, the duedates of the production orders are met. This transportation restriction reduces the set of feasible schedules even more than the nobuffer restrictions discussed in the literature in the case of limited storage. Still this problem is NP-hard. Due to the transportation restriction, the duration of a job A on the flow-shop depends on the other jobs processedon the flow-shop in the same time frame which is called a cycle. Realistic processing times are achieved by a simulation of the scheduling of A which includes the next jobs until A has left the flow-shop. The usage of such realistic processing times instead of net processing times improves the priority rules by around 16%. There are pools of jobs where a large variance of the cycle times is beneficial and pools of jobs where a small variance is better. This is partially detected by agenetic algorithm. This improves the performance by another 34%. KW - Produktionsplanung KW - Ablaufplanung Y1 - 2016 ER - TY - JOUR A1 - Herrmann, Frank A1 - Büttner, Simon T1 - Automatische Qualitätskontrolle mittels Maschinellem Lernen und SAP Leonardo JF - Anwendungen und Konzepte der Wirtschaftsinformatik N2 - In vielen Unternehmen werden von Menschen durch Ansehen von Produkten Produktionsfehler identifiziert. Die übersehenen Produktionsfehler führen zunehmend häufiger zu teuren Kundenreklamationen. Für die Produktion von Fußbällen wird in dieser Arbeit diese manuelle Qualitätssicherung analysiert. Als Alternative werden die Fußbälle durch einen Roboter fotografiert u nd durch maschinelles Lernen werden Produktionsfehler auf diesen digitalen Fotos identifiziert. Dieser Prüfprozess wird in SAP Leonardo implementiert und damit wird der bereits in einem SAP System implementierte Produktionsprozess (bzw. Unternehmensprozess) erweitert, wodurch ein durchgängig digitalisierter Gesamtprozess implementiert wird. Dadurch werden signifikant bessere Prüfergebnisse erreichtb und die Durchlaufzeit des Prüfprozesses wird substantiell reduziert. KW - Industrie 4.0 KW - SAP Leonardo KW - SAP S/4HANA KW - ERP - System KW - Machine Learning KW - durchgängig digitalisierter Produktionsprozess Y1 - 2019 UR - https://akwi.hswlu.ch/issue/view/376/431 SN - 2296-4592 IS - 10 SP - 46 EP - 53 PB - AKWI ER - TY - CHAP A1 - Herrmann, Frank ED - Claus, Thorsten ED - Herrmann, Frank ED - Manitz, Michael T1 - Grundlagen der Optimierung T2 - Produktionsplanung und -steuerung N2 - Seit vielen Jahrzehnten und in den letzten mit zunehmender Intensität werden Probleme als Optimierungsprobleme dargestellt. Beispiele sind die optimale Nutzungsdauer eines Investitionsobjekts, die Produktionsplanung, die Lagerhaltung bei zufälliger Nachfrage, die Beladung von Lastwagen und die Festlegung von deren (Fahr-) Routen. Dies führte vor allem in amerikanische Literatur zur ökonomischen Ausbildung zur Verwendung von Optimierungsmodelle zur Erläuterung von Sachverhalten – als Beispiel möge das Buch Hillier und Hillier (2011) dienen, welches auch viele Fallstudien aus konkreten industriellen Anwendungen enthält. Y1 - 2021 SN - 978-3-662-64290-0 U6 - https://doi.org/10.1007/978-3-658-25168-0_4 SP - 61 EP - 87 PB - Springer Gabler CY - Berlin, Heidelberg ER - TY - CHAP A1 - Trost, Marco A1 - Claus, Thorsten A1 - Herrmann, Frank ED - Antlová, Klara ED - Semerádová, Tereza T1 - Limitation of Temporary Employment in the Master Production Scheduling T2 - Liberec Economic Forum 2021: Proceedings of the 15th International Conference Y1 - 2021 SN - 978-80-7494-578-6 SP - 201 EP - 209 CY - Liberec, Czech Republic ET - 1. Aufl. ER - TY - JOUR A1 - Herrmann, Frank T1 - Human Experience Versus Rule Decision at Krones AG JF - Biomedical Journal of Scientific & Technical Research N2 - Final assembly at Krones AG must make the best possible use of its production space and meeting the specified customer due dates is critical. Via a self developed simulation tool, the present scheduling procedure is compared with the one by priority rule shortest slack. As a consequence slack should have a higher importance in the planning KW - Simulation of Scheduling KW - Tardiness KW - Unused Area Y1 - 2022 UR - https://biomedres.us/pdfs/BJSTR.MS.ID.006691.pdf U6 - https://doi.org/10.26717/BJSTR.2022.42.006691 SN - 2574 -1241 N1 - Corressponding author: Frank Herrmann VL - 42 IS - 1 SP - 33255 EP - 33260 PB - Biomedical Research Network+ ER - TY - CHAP A1 - Terbrack, Hajo A1 - Claus, Thorsten A1 - Götz, Matthias A1 - Herrmann, Frank A1 - Selmair, Maximilian ED - Franke, Jörg ED - Schuderer, Peter T1 - Analyse von konventionellen Prioritätsregeln zur Reduktion von CO2-Emissionen durch den Einsatz von Photovoltaikanlagen T2 - Simulation in Produktion und Logistik 2021: Erlangen, 15.-17. September 2021 Y1 - 2021 UR - http://www.asim-fachtagung-spl.de/asim2021/papers/Proof_171.pdf SN - 978-3736974791 SP - 75 EP - 84 PB - Cuvillier Verlag CY - Göttingen ER - TY - JOUR A1 - Herrmann, Frank T1 - Die Smart Factory und ihre Risiken JF - Anwendungen und Konzepte der Wirtschaftsinformatik N2 - In dieser Arbeit werden die Risiken einer Smart Factory untersucht und strukturiert dargestellt, um den Status der Smart Factory zu sondieren. Somit dient die Arbeit als Überblick über die technischen Komponen-ten einer Smart Factory und die damit verbundenen Risiken und nimmt eine ganzheitliche Sichtweise der Smart Factory ein. Die Ergebnisse zeigen, dass der größte Handlungsbedarf im technologischen Bereich liegt. Folglich wurden die Themen Standardisierung, Informationssicherheit, Verfügbarkeit der IT-Infrastruktur, Verfügbarkeit von schnellem Internet und komplexen Systemen priorisiert. Die organisato-rischen und finanziellen Risiken, welche ebenfalls eine wichtige Rolle bei einer Smart Factory Transfor-mation spielen, werden dabei adressiert. KW - Industrie 4.0 KW - Smart Factory KW - Risiken Y1 - 2020 UR - https://akwi.hswlu.ch/article/view/3277 IS - 12 SP - 70 EP - 83 PB - AKWI ER - TY - CHAP A1 - Herrmann, Frank ED - Makul, Natt T1 - Generic Scheduling by an optimization model demonstrated for a partly automated production line T2 - Recent Advances in Science and Technology Research Vol. 7 Y1 - 2020 UR - https://paparesearch.com/generic-scheduling-by-an-optimization-model-demonstrated-for-a-partly-automated-production-line/ SN - 978-93-90431-52-6 SP - 13 EP - 27 PB - Book Publisher International (a part of SCIENCEDOMAIN International) ER - TY - JOUR A1 - Herrmann, Frank A1 - Horkovics-Kovats, Robert A1 - Sultanow, Eldar T1 - Ein paralleler Algorithmus für API Mining von C# Code JF - Anwendungen und Konzepte der Wirtschaftsinformatik N2 - Die Konformitätsanalyse ist eine Technik der statischen Code-Analyse (SCA) zur Software-Qualitätssicherung. Ihr Kernproblem ist, dass Werkzeuge nicht aus bereits eingetretenen Fehlern automatisiert dazulernen. Zur Lösung wurde in dieser Arbeit das maschinelle Lernen (ML) evaluiert, indem ein wissenschaftlich fundierter und praktisch erprobter Ansatz zur unüberwachten Lerntechnik angewandt und das Ergebnis analysiert wurde. Es wurde festgestellt, dass zur Anwendung auf verschiedene Programmiersprachen nur ein sprachspezifisches API Mining-Tool notwendig ist. Ein derartiges Tool durchsucht in parallelisierter Form Codezeilen und normalisiert sie für maschinelle Lernprozesse. Dieses System wurde für die Programmiersprache C# implementiert, da viele Industrieprojekte in dieser Sprache entwickelt werden. Zur funktionalen Validierung wurde in einer Fallstudie gezeigt, dass Regeln mit einem positiven Effekt auf Software-Qualität gelernt wurden. Konkret wurde der Wartungsaufwand eines Code-Smells in einem Beispielprojekt durch das Auslagern einer gelernten Assoziation in eine gemeinsame Methode um den Faktor 30 reduziert. Die Laufzeit des Algorithmus wurde empirisch in acht open-source Repositorys evaluiert. Durch Parallelisierung kann eine durchschnittliche Laufzeitverbesserung von 45,16% erwartet werden. Allerdings wurden bei der Anwendung auch Grenzen deutlich: Viele Assoziationen sind nutzlos, die Regelbewertung ist von einem subjektiven Faktor abhängig und die Wirtschaftlichkeit des Tools ist deshalb nicht transparent. Dennoch belegt diese Arbeit, dass ein ML-basiertes SCA-Tool als ergänzende Qualitätssicherungsmaßnahme im Software-Engineering möglich ist. KW - Paralleler Algorithmus KW - API Mining KW - C# Code Y1 - 2022 U6 - https://doi.org/10.26034/lu.akwi.2022.3454 SN - 2296-4592 VL - 16 SP - 48 EP - 56 PB - Technische Hochschule Wildau ER - TY - JOUR A1 - Herrmann, Frank T1 - Der Einsatz von ITK zur Abfallreduktion im Lebensmitteleinzelhandel JF - Russian Journal of Applied Sciences N2 - Die Abfallproblematik in Nahrungsketten ist ein weltweit wichtiges Thema, worüber in vielen Medien häufig berichtet wird. Dieser Beitrag diskutiert die Verwendung der Informations- und Kommunikationstechnologien zum Lösen der Abfallproblematik im Lebensmitteleinzelhandel. Zuerst präsentieren wir existierende methodische Lösungsansätze zur Abfallreduktion im Lebensmitteleinzelhandel. Anschließend zeigen wir, dass die Informations- und Kommunikationstechnologien sowohl bei diesen Lösungsansätzen als auch bei vielen anderen methodisch ähnlichen Problemstellungen eine wichtige Rolle spielen. Y1 - 2018 UR - https://libr.msu.by/bitstream/123456789/9843/1/897n.pdf SP - 100 EP - 104 ER - TY - CHAP A1 - Forstner, Robert A1 - Claus, Thorsten A1 - Herrmann, Frank T1 - Anwendung eines Energieabnahmekorridors auf der Ebene der Hauptproduktionsprogrammplanung T2 - Russian Journal of Applied Sciences Y1 - 2018 SP - 95 EP - 98 PB - A. A. Kuleshov MSU CY - Mogilev ER - TY - JOUR A1 - Trost, Marco A1 - Herrmann, Frank T1 - Necessity and application advantages of linked master production scheduling and human resources requirements planning JF - Problems of sustainable development of the regions of the Republic of Belarus and neighbouring countries : proceedings of the VII International Scientific-Practical Conference (Internet-conference), Mogilev, 1 May - 1 August 2018. N2 - The following article considers the need to integrate social aspects into the Master Production Scheduling. This is justified by the demand for sustainable business processes and the previously neglected social dimension, which is also reflected in the development of working conditions. The linear optimization model for Master Production Scheduling outlined in connection with aspects of Human Resource Requirements Planning offers an approach to reduce this research gap and underlines the urgency of long-term planning and control of employee burdens. For companies, this results in a Decision Support System through the evaluation of measures to improve working conditions. Y1 - 2019 SP - 108 EP - 113 PB - A. A. Kuleshov Moskauer Staatliche Universität CY - Mogilev ER - TY - JOUR A1 - Herrmann, Frank T1 - Principles of Business Forecasting JF - Interfaces N2 - In Book Reviews, we review an extensive and diverse range of books. They cover theory and applications in operations research, statistics, management science, econometrics, mathematics, computers, and information systems. In addition, we include books in other fields that emphasize technical applications. The editor will be pleased to receive an e-mail from those willing to review a book, with an indication of specific areas of interest. If you are aware of a specific book that you would like to review, or that you think should be reviewed, please contact the editor. KW - BUSINESS forecasting KW - FILDES KW - Keith KW - NONFICTION KW - ORD KW - PRINCIPLES of Business Forecasting (Book) KW - Robert Y1 - 2014 U6 - https://doi.org/10.1287/inte.2014.0734 VL - 44 IS - 2 SP - 244 EP - 245 PB - Institute for Operations Research ER - TY - CHAP A1 - Herrmann, Frank A1 - Savasci, Faruk ED - Franke, Jörg ED - Schuderer, Peter T1 - Simulation der Einplanung der terminkritischen Montage von Abfüllanlagen am Beispiel der Krones AG T2 - Simulation in Produktion und Logistik 2021: Erlangen, 15.-17.September 2021 N2 - Many companies need to make the best possible use of their production areas. For others, meeting predetermined customer due dates is critical. Few companies have to meet both requirements simultaneously. One example is the final assembly at Krones AG. An extensive simulation study identified potential for improvement. In some planning problems, preferring orders due to buffer time proves to be advantageous. In others, avoiding unused space is better. This project is to be continued with the development of a simulation-based planning program. T2 - Simulation of planning of time-critical assembly of bottling maschines based on example of Krones AG Y1 - 2021 UR - http://www.asim-fachtagung-spl.de/asim2021/papers/Proof_139.pdf SN - 978-3736974791 SP - 653 EP - 662 PB - Cuvillier Verlag CY - Göttingen ER - TY - CHAP A1 - Herrmann, Frank ED - Herrmann, Frank ED - Popescu, Manuela ED - Audette, Michel A. T1 - Simulative Comparison of Scheduling at Krones AG with Shortest Slack T2 - SIMUL 2021: the Thirteenth International Conference on Advances in System Simulation, October 3-7, 2021, Barcelona, Spain N2 - Final assembly at Krones AG must make the best possible use of its production space, and meeting the specified customer due dates is critical. Via a self developed simulation tool, the present scheduling procedure is compared with the one by priority rule shortest slack. As a consequence slack should have a higher importance in the planning. Y1 - 2021 UR - https://www.thinkmind.org/download_full.php?instance=SIMUL+2021 SN - 978-1-61208-898-3 SP - 20 EP - 24 PB - IARIA CY - Wilmington, DE, USA ER - TY - JOUR A1 - Terbrack, Hajo A1 - Claus, Thorsten A1 - Herrmann, Frank T1 - Energy-Oriented Production Planning in Industry BT - A Systematic Literature Review and Classification Scheme JF - Sustainability N2 - Scarcity of resources, structural change during the further development of renewable energy sources, and their corresponding costs, such as increasing resource costs or penalties due to dirty production, lead industrial firms to adapt ecological actions. In this regard, research on energy utilization in production planning has received increased attention in the last years, resulting in a large number of research articles so far. With the paper at hand, we review the literature on energy-oriented production planning. The aim of this study is to derive similar core issues and related properties along energy-oriented models within hierarchical production planning. For this, we carry out a systematic literature review and analyze and synthesize 375 research articles. We classify the underlying literature with a novel two-dimensional classification scheme and identify three key topics and five frequently found characteristics, which are presented in detail throughout this article. Based on these results, we state several potentials for further research. KW - BI-OBJECTIVE OPTIMIZATION KW - EFFICIENT MULTIOBJECTIVE OPTIMIZATION KW - ELECTRICITY DEMAND RESPONSE KW - energy KW - FLEXIBLE JOB-SHOP KW - GREEN SCHEDULING OPTIMIZATION KW - HYBRID FLOW-SHOP KW - literature review KW - LOT-SIZING PROBLEM KW - MANUFACTURING SYSTEM KW - MULTIPURPOSE BATCH PLANTS KW - production planning KW - RENEWABLE ENERGY Y1 - 2021 U6 - https://doi.org/10.3390/su132313317 VL - 13 IS - 23 SP - 1 EP - 32 PB - MDPI CY - Basel ER - TY - JOUR A1 - Malovanij, Julian A1 - Herrmann, Frank T1 - Implementierung eines Treibers zur Anbindung von Mikrocontroller-basierten Maschinen über OPC-UA an das Konfigurations- und Inbetriebnahme-Tool von SSI Schäfer JF - Anwendungen und Konzepte der Wirtschaftsinformatik N2 - Das Thema „Implementierung eines Treibers zur Anbindung von Mikrocontroller-basierten Maschinen über OPC-UA an das Konfigurations- und Inbetriebnahme-Tool von SSI Schäfer“ soll zu einem Gerätetreiber für das Konfigurations- und Inbetriebnahme-Tool CPM führen, welcher den Anschluss von neuen Maschinen an ebendieses ermöglicht. Aktuell befinden sich diese noch in Entwicklung, jedoch sollen sie, von den Vorteilen des CPM-Tools profitieren, welches unter anderem den Inbetriebnahmeprozess einfacher und schneller gestalten kann. Ziel ist somit die Anbindung dieser Maschinen durch die Spezifikation einer Schnittstelle und der Implementierung dieser auf Basis der Schnittstellen des CPM-Tools, in welches sich der Gerätetreiber nahtlos einfügen soll. KW - Gerätetreiber KW - Mikrokontroller-basierte Maschinen KW - SPS KW - OPC-UA Y1 - 2024 U6 - https://doi.org/10.26034/lu.akwi.2024.6210 SN - 2296-4592 IS - 20 SP - 54 EP - 66 PB - AKWI ER - TY - CHAP A1 - Herrmann, Frank A1 - Manitz, Michael ED - Claus, Thorsten ED - Herrmann, Frank ED - Manitz, Michael T1 - Ein hierarchisches Planungskonzept zur operativen Produktionsplanung und -steuerung T2 - Produktionsplanung und -steuerung N2 - Ausgangspunkt für die operative Produktionsplanung und -steuerung ist eine Infrastruktur aus Produktionsressourcen mit definierten Produktionskapazitäten, auf denen jeweils die Produktion eines oder mehrerer verschiedener Produkte erfolgen kann. Y1 - 2021 SN - 978-3-662-64290-0 U6 - https://doi.org/10.1007/978-3-662-64291-7_2 SP - 9 EP - 25 PB - Springer Gabler CY - Berlin, Heidelberg ER - TY - CHAP A1 - Herrmann, Frank A1 - Lange, Frederick ED - Claus, Thorsten ED - Herrmann, Frank ED - Manitz, Michael T1 - Belastungsorientierte Ansätze in der Produktionsplanung T2 - Produktionsplanung und -steuerung N2 - Unter Berücksichtigung aller Steuergrößen, Restriktionen und Bedingungen kann durch einen simultanen Planungsansatz ein optimaler Produktionsplan erstellt werden. Y1 - 2021 SN - 978-3-662-64290-0 U6 - https://doi.org/10.1007/978-3-662-64291-7_9 SP - 159 EP - 182 PB - Springer Gabler CY - Berlin, Heidelberg ER - TY - CHAP A1 - Claus, Thorsten A1 - Herrmann, Frank A1 - Manitz, Michael ED - Claus, Thorsten ED - Herrmann, Frank ED - Manitz, Michael T1 - Knappe Kapazitäten und Unsicherheit - Analytische Ansätze und Simulation in der Produktionsplanung und -steuerung T2 - Produktionsplanung und -steuerung Y1 - 2021 SN - 978-3-662-64290-0 U6 - https://doi.org/10.1007/978-3-662-64291-7_1 SP - 3 EP - 7 PB - Springer Gabler CY - Berlin, Heidelberg ER - TY - CHAP A1 - Herrmann, Frank A1 - Englberger, Julian ED - Claus, Thorsten ED - Herrmann, Frank ED - Manitz, Michael T1 - Robuste Optimierung zur Produktionsprogrammplanung T2 - Produktionsplanung und -steuerung Y1 - 2021 SN - 978-3-662-64290-0 U6 - https://doi.org/10.1007/978-3-662-64291-7_4 SP - 39 EP - 61 PB - Springer Gabler CY - Berlin, Heidelberg ER - TY - JOUR A1 - Herrmann, Frank T1 - Using Optimization Models for Scheduling in Enterprise Resource Planning Systems JF - Systems N2 - Companies often use specially-designed production systems and change them from time to time. They produce small batches in order to satisfy specific demands with the least tardiness. This imposes high demands on high-performance scheduling algorithms which can be rapidly adapted to changes in the production system. As a solution, this paper proposes a generic approach: solutions were obtained using a widely-used commercially-available tool for solving linear optimization models, which is available in an Enterprise Resource Planning System (in the SAP system for example) or can be connected to it. In a real-world application of a flow shop with special restrictions this approach is successfully used on a standard personal computer. Thus, the main implication is that optimal scheduling with a commercially-available tool, incorporated in an Enterprise Resource Planning System, may be the best approach. KW - scheduling KW - optimization model KW - real world application KW - enterprise resource planning system KW - material requirements planning II KW - priority rules Y1 - 2016 U6 - https://doi.org/10.3390/systems4010015 VL - 4 IS - 1 SP - 1 EP - 15 PB - MDPI CY - Basel ER - TY - CHAP A1 - Trost, Marco A1 - Terbrack, Hajo A1 - Claus, Thorsten A1 - Herrmann, Frank T1 - Established production planning and control and its enhancement with sustainability T2 - Proceedings of the 37th ECMS International Conference on Modeling and Simulation (ECMS 2023): June 20th - June 23rd, 2023, Florence, Italy N2 - Against the background of the energy crisis, shortage of skilled workers, demographic change and other drivers, sustainable development is also becoming increasingly important for industrial companies. In this respect, production planning and control has an enormous influence on relevant objectives. In classical approaches of production planning and control as presented in this paper, economic-oriented objectives are taken into account to a large extent in decision making. This paper demonstrates that besides these classical models, a variety of approaches exist to influence ecological and social targets through production planning. These different models are assigned to sustainability areas and outlined by exemplary literature sources. Further research is needed, for instance, in the joint consideration of sustainability criteria along different planning levels and sustainable dimensions. KW - Sustainability KW - Social KW - Ecological KW - Hierarchical Production Planning Y1 - 2023 SN - 978-3-937436-80-7 U6 - https://doi.org/10.7148/2023-0320 SN - 2522-2422 SP - 320 EP - 327 PB - ECMS ER - TY - JOUR A1 - Trost, Marco A1 - Claus, Thorsten A1 - Herrmann, Frank T1 - Social Sustainability in Production Planning: A Systematic Literature Review JF - Sustainability N2 - Sustainable production includes economic, environmental, and social aspects. However, social sustainability has received less attention, especially compared to the economic aspects. Next to technical and organizational measures, social improvements within supply chains can also be achieved through suitable production planning. Within production planning, production programs are determined, and the assignment of available resources (e.g., employees) is specified. Thus, the utilization and workload of employees are defined. This systematic literature review investigates to what extent such employee-related social aspects are reflected in production planning and discusses whether economic aspects dominate them. For this, a Scopus database search was carried out and 76 identified approaches were analyzed and categorized regarding the occurring employee-related social aspects and their implementation. Thus far, the approaches mainly consider single aspects on single planning levels. A consideration of a broad set of aspects along the entire production planning has rarely been studied. In particular, health and safety aspects are considered on the levels of assembly line balancing and job rotation. However, their impact is primarily determined by the specific settings of the decision-maker. To support decision-makers, only a few studies have investigated the effects based on real application scenarios. Further potential might be an extended modeling of social and economic interdependencies and a consideration of employee-related social aspects in medium- to long-term production planning. KW - ASSEMBLY-LINE KW - employee KW - ERGONOMIC RISKS KW - FATIGUE KW - FLOWSHOP SCHEDULING PROBLEM KW - JOB ROTATION SCHEDULES KW - LINE BALANCING PROBLEM KW - literature review KW - MODEL KW - MUSCULOSKELETAL DISORDERS KW - production planning KW - social sustainability KW - SUPPLY CHAIN KW - WORKER ASSIGNMENT Y1 - 2022 U6 - https://doi.org/10.3390/su14138198 VL - 14 IS - 13 SP - 1 EP - 31 PB - MDPI CY - Basel ER - TY - BOOK A1 - Herrmann, Frank T1 - Lineare Optimierung unter Unsicherheit BT - eine Einführung N2 - Modellierungsalternativen werden mathematisch exakt formuliert; Stärken und Schwächen der derzeit eingesetzten Modellierungstechniken werden demonstriert; Leicht nachrechenbare Fallstudien Y1 - 2022 SN - 978-3-658-34580-8 U6 - https://doi.org/10.1007/978-3-658-34581-5 PB - Springer Fachmedien CY - Wiesbaden ER - TY - JOUR A1 - Davendra, Donald A1 - Herrmann, Frank A1 - Bialic-Davendra, Magdalena T1 - Chaotic Flower Pollination Algorithm for scheduling tardiness-constrained flow shop with simultaneously loaded stations JF - Neural computing & applications N2 - This paper introduces a novel chaotic flower pollination algorithm (CFPA) to solve a tardiness-constrained flow-shop scheduling problem with simultaneously loaded stations. This industrial manufacturing problem is modeled from a filter basket production line in Germany and has been generally solved using standard deterministic algorithms. This research develops a metaheuristic approach based on the highly efficient flower pollination algorithm coupled with different chaos maps for stochasticity. The objective function targeted is the tardiness constraint of the due dates. Fifteen different experiments with thirty scenarios are generated to mimic industrial conditions. The results are compared with the genetic algorithm and with the four standard benchmark priority rule-based deterministic algorithms of First In First Out, Raghu and Rajendran, Shortest Processing Time and Slack. From the obtained results and analysis of the relative difference, percentage relative difference and t tests, CFPA was found to be significantly better performing than the deterministic heuristics and the GA algorithm. KW - Flower pollination algorithm KW - Chaos maps KW - Flow shop with tardiness Y1 - 2022 U6 - https://doi.org/10.1007/s00521-022-08044-0 PB - Springer Nature ER - TY - JOUR A1 - Herrmann, Frank A1 - Engl, Fabian A1 - Trubjansky, Philipp T1 - Ein funktionaler Vergleich der SAP Analytics Cloud und Microsoft Power BI zur Verwendung im Bereich People Analytics bei Vitesco Technologies JF - Anwendungen und Konzepte der Wirtschaftsinformatik N2 - Aufgrund leistungsbedingter Einschränkungen durch die aktuelle Business-Intelligence-Software PowerBI vergleicht die People-Analytics-Abteilung von Vitesco Technologies diese mit der Alternativsoftware SAP Analytics Cloud. Dafür wurden zunächst aktuelle Herausforderungen im People-Analytics-Umfeld identifiziert und basierend darauf Vergleichskriterien erarbeitet. Als Vergleichsmodell kommt das Kano-Modell zum Einsatz. Die durchgeführte Evaluation favorisiert aus funktionaler Sicht einen Umstieg auf die SAP Analytics Cloud, identifiziert allerdings eine Reihe an Herausforderungen, die einen sofortigen Wechsel einschränken. Zu diesen gehören sowohl die Verfügbarkeit als auch die Qualität der HR-Daten. KW - Business Intelligence KW - SAP Analytics Cloud KW - SAC KW - Power BI KW - Cloud Computing KW - Kano-Modell KW - Vergleich KW - People Analytics KW - HR Y1 - 2022 U6 - https://doi.org/10.26034/lu.akwi.2022.3337 SN - 2296-4592 IS - 15 SP - 8 EP - 21 PB - Hochschule Luzern ER - TY - JOUR A1 - Herrmann, Frank A1 - Ruf, Elena A1 - Dittert, Oliver T1 - Robotic Process Automation als Enabler der Digitalen Transformation der OSRAM Continental GmbH JF - Anwendungen und Konzepte der Wirtschaftsinformatik N2 - Der vorliegende Artikel befasst sich mit der Automa-tisierung von Unternehmensprozessen mit Hilfe von Robotic Process Automation (RPA). Um die zentrale Frage nach den Potentialen von RPA zu beantworten, wurde gemeinsam mit der OSRAM Continental GmbH eine Fallstudie in der Einkaufsabteilung durchgeführt. In dieser Fallstudie werden die Fähigkeiten von Attended RPA sowie die Unterschiede im Vergleich zu einem bereits im Unternehmen beste-henden Workflow-Automation-Systems untersucht. Die Automatisierung hat gezeigt, dass mittels RPA das Automatisierungspotential eindeutig erweitert werden kann. Jedoch wurden ebenso deutlich, dass die Technologie auf bestimmte Aufgaben begrenzt ist und daher ein hybrider Automatisierungsansatz mit beiden Technologien die vielversprechendste Lösung darstellt. Y1 - 2022 U6 - https://doi.org/10.26034/lu.akwi.2022.3329 SN - 2296-4592 IS - 15 SP - 44 EP - 56 PB - Hochschule Luzern ER - TY - JOUR A1 - Englberger, Julian A1 - Herrmann, Frank A1 - Manitz, Michael T1 - Master production scheduling with scenario-based capacity-load factors in a rolling planning environment JF - Logistics Research, Special Issue “Supply Chain Analytics in the 2020s” N2 - This paper proposes two stochastic programming models for master production scheduling with capacity-load factor scenarios. In contrast to other work on production planning with load-dependent lead times or dynamic capacity loads, we iteratively build a set of realistic capacity-load factor scenarios by simulating the realization of the master production schedules in a rolling horizon environment. Therefore, we integrate the models into a hierarchical production planning and control system that is common in industrial practice and measure the effective capacity-load factors. With these factors, we resolve the master production scheduling problem. Toa evaluate the performance of the proposed models, we compare the stochastic models with the common approach to reduce the nominally available capacity for master production scheduling. In our experiments, the stochastic models significantly reduce the tardiness of production orders caused by capacity bottlenecks. Y1 - 2022 U6 - https://doi.org/10.23773/2022_12 VL - 15 SP - 1 EP - 16 PB - Bundesvereinigung Logistik (BVL) e.V. CY - Bremen ER - TY - CHAP A1 - Terbrack, Hajo A1 - Claus, Thorsten A1 - Herrmann, Frank ED - Grothe, Oliver ED - Nickel, Stefan ED - Rebennack, Steffen ED - Stein, Oliver T1 - Addressing Energy Consumption and Energy-related Emissions by Single Machine Scheduling T2 - Operations Research Proceedings 2022, Abstracts of the Annual International Conference of the German Operations Research Society (Gor): Karlsruhe, Germany, September 6-9, 2022 Y1 - 2022 ER - TY - CHAP A1 - Terbrack, Hajo A1 - Claus, Thorsten A1 - Herrmann, Frank T1 - Emission reduction through production scheduling by priority rules and energy onsite generation T2 - Proceedings of the 36th ECMS International Conference on Modelling and Simulation (ECMS 2022), May 30th - June 3rd, 2022, Ålesund, Norway N2 - This article describes primary findings of various simulation runs on job shop scheduling dealing with energy consumption and emission pollution. By two combinations of priority rules, production is linked to the generation output of a renewable energy source installed onsite. The resulting schedules show a reduction of energy-related emissions and makespan compared to several conventional priority rules often used in industrial practice. KW - Sustainable Production Planning KW - Energy-related Emissions KW - Job Shop Scheduling KW - Simulation Y1 - 2022 SN - 978-3-937436-77-7 U6 - https://doi.org/10.7148/2022-0114 SN - 2522-2414 SP - 114 EP - 120 PB - ECMS ER - TY - JOUR A1 - Herrmann, Frank A1 - Riedl, Nadine A1 - Janoschek, Stefan T1 - Konzeptionierung und Implementierung einer standardisierten RPA-Schnittstelle für eine Analytics-On-Demand-Self-Service-Lösung zur Bereitstellung von einkaufsbezogenen Daten in der Krones AG JF - Anwendungen und Konzepte der Wirtschaftsinformatik N2 - Hohe Bearbeitungs- und Antwortzeiten von Tickets, die diverse Aufgaben aus dem Bereich Analytics inkludieren, führten Corporate Procurement (CP) Processes and Systems zur Konzeptionierung und Implementierung einer standardisierten RPA-Schnittstelle, um einen Analytics-On-Demand-Self-Service zur Bereitstellung von einkaufsbezogenen Daten zu realisieren. Dafür wurde zunächst ein Anforderungskatalog erarbeitet, der als Basis für die Konzeptionierung und Implementierung aller zur Prüfung der Funktionsfähigkeit der RPA-Schnittstelle erforderlichen Komponenten diente. Als Proof-of-Concept fungieren die Analytics-Use-Cases der Orderbuchabfrage und Abfrage von Einkaufsinfosätzen mit Konditionen. Die durchgeführte Evaluation bescheinigt aus technischer und prozessualer Sicht den Erfolg des Projekts, wobei im Vordergrund die zukünftig nach Einführung des Analytics-On-Demand-Self Service gewonnen zeitlichen Kapazitäten und verringerten Wartezeiten bei den Mitarbeitenden des Einkaufs der Krones AG stehen. KW - Robotic Process Automation KW - Standardisierung KW - Analytics-On-Demand-Self-Service Y1 - 2024 U6 - https://doi.org/10.26034/lu.akwi.2024.5510 SN - 2296-4592 IS - 19 SP - 51 EP - 63 PB - AKWI ER - TY - JOUR A1 - Engl, Fabian A1 - Herrmann, Frank T1 - A Machine Learning based Approach on Employee Attrition Prediction with an Emphasize on predicting Leaving Reasons JF - Anwendungen und Konzepte der Wirtschaftsinformatik N2 - Using Vitesco Technologies as an example, this article examines whether machine learning models are suitable for detecting employee attrition at an early stage, with the aim of uncovering underlying reasons for leaving. Nine different machine learning algorithms were examined: K-nearest-neighbors, Naive Bayes, logistic regression, a support vector machine, a neural network, a random forest, adaptive boosting, and two gradient boosting models. A three-way-holdout validation method was implemented to assess the quality of the results and measure both the f-score and the degree of model generalization. Initially, it was found that tree-based methods are best suited for classifying employees. A multiclass classification approach showed that under certain conditions it is even possible to predict the underlying leaving reasons. KW - Machine Learning KW - Employee Attrition Prediction KW - Fluctuation Prediction KW - Employee Attrition KW - Leaving Reasons KW - AI Y1 - 2023 U6 - https://doi.org/10.26034/lu.akwi.2023.4488 SN - 2296-4592 IS - 18 SP - 30 EP - 40 PB - AKWI ER - TY - JOUR A1 - Herrmann, Frank A1 - Kerschbaum, Andreas T1 - Auswahl und Anwendung einer geeigneten Software zur standardisierten und automatisierten Berichterstellung im Service am Beispiel der Maschinenfabrik Reinhausen GmbH JF - Anwendungen und Konzepte der Wirtschaftsinformatik N2 - Die Berichterstattung ist ein wichtiger Bestandteil der Aufgaben der MR. Aktuell fehlen zur Erledigung dieser Aufgabe festgelegte Standards, sowie ein Programm, das sich umfangreich für diese Aufgabenstellung eignet. Im Rahmen der vorliegenden Arbeit wird die Prozessstrecke des Prozesses zur Erstellung eines Ölberichts aufgenommen und auf Schwachstellen untersucht. Anschließend erfolgt die Verbesserung der Schwachstellen durch die Einführung einer neuen Software. Dise wird in einem phasenbasierten Prozess,in Anlehnung an das Phasenmodell zur Softwareauswahl nach Gronau, unter Einbezug festgelegter Kriterien sorgfältig ausgewählt. Das Ergebnis dieser Arbeit ist die Verbesserung des betrachteten Prozesses, sowie die Einführung der Software DevExpress und die Erstellung eines ersten Entwurfsberichts welcher als Vorlage für die zukünftigen Berichte dient. KW - Standardisierung KW - Berichtswesen KW - Softwareauswahl Y1 - 2024 U6 - https://doi.org/10.26034/lu.akwi.2024.5946 SN - 2296-4592 IS - 19 SP - 39 EP - 50 PB - AKWI ER - TY - JOUR A1 - Herrmann, Frank A1 - Janker, Sebastian A1 - Laubmeier, Franz T1 - Integration eines Support-Ticketsystems in die Prozesse des Geschäftsbereichs Informatik + Systeme JF - Anwendungen und Konzepte der Wirtschaftsinformatik N2 - Eine effiziente Bearbeitung von Kundenanliegen und organisierte Hilfe zu einem digitalen Produkt sind für ein modernes Unternehmen wie die F.EE GmbH unabdingbar. Ein zentraler Bestandteil für ein Support-Team beim Bereitstellen dieser Dienstleistungen ist ein SupportTicketsystem mit Optionen zur Automatisierung von Arbeitsabläufen. Der Geschäftsbereich Informatik + Systeme des Unternehmens F.EE GmbH verwendet zurzeit ein Ticketsystem, das aufgrund eines endenden Supportzeitraums ersetzt werden muss. Ohne Supportunterstützung dürften unter anderem Sicherheitslücken auftreten. Von den vielen am Markt verfügbaren Systemen wurde das Open-Source-Ticketsystem ausgewählt. Zur effektiven Nutzung musste es signifikant erweitert werden. KW - Ticketsystem KW - Systemintegration Y1 - 2024 U6 - https://doi.org/10.26034/lu.akwi.2024.6211 SN - 2296-4592 IS - 20 SP - 67 EP - 75 PB - AKWI ER - TY - BOOK A1 - Herrmann, Frank T1 - Produktionsplanung BT - Übungsbuch Band 1 N2 - Eine operative Produktionsplanung und -steuerung ist zentral für eine effektive und effiziente Produktion in Unternehmen und daher eine wesentliche Komponente von Enterprise Ressource Planning Systemen zur Regelung von Unternehmensprozessen. Die implementierten Verfahren sind integraler Bestandteil von Veranstaltungen zur Produktion und Logistik, zu Produktionsplanungs- und -steuerungsystemen, zum Supply Chain Management usw. in Bachelor- und Masterstudiengängen an Hochschulen und Universitäten. Die Aufgaben in diesem Übungsbuch ergänzen die in diesen Veranstaltungen und auch in den entsprechenden Standardlehrbüchern erläuterten Verfahren durch sehr detaillierte Lösungen – über die angegebene Literatur dürften diese sich im Selbststudium erarbeiten lassen. Die Wiederholungsfragen vertiefen das Verständnis über den Einsatz dieser Verfahren, insbesondere in der industriellen Praxis. Aufgrund ihres Umfangs und ihres Schwierigkeitsgrads sind die Aufgaben und Fragenals Klausuraufgaben geeignet. Folglich wendet sich das Buch an Studierende (und mit Einschränkungen an Doktoranden) mit ausgeprägtem Interesse an der Lösung von Produktionsplanungsproblemen. Ferner wendet es sich an Wissenschaftler und Experten in Unternehmen, die einen Eindruck von lösbaren Produktionsplanungsproblemen gewinnen wollen. KW - Prognose KW - Lineare Optimierung KW - ILOG KW - Losbildung KW - Produktionssteuerung Y1 - 2023 SN - 978-3-658-40218-1 U6 - https://doi.org/10.1007/978-3-658-40218-1 PB - Springer Gabler CY - Wiesbaden ER - TY - CHAP A1 - Dai, Chenghao A1 - Schön, Maximilian A1 - Claus, Thorsten A1 - Herrmann, Frank T1 - Multi-Site Aggregate Production Planning With Resilience Consideration T2 - Proceedings of the 38th ECMS International Conference on Modeling and Simulation (ECMS 2024): June 4th - June 7th, 2024, Cracow, Poland N2 - The recent years have shown a high frequency of disruptions like natural disasters or manmade disruptions, leading, for example, to transport routes or production facilities being unavailable for extended periods. Many manufacturing companies, which nowadays operate in a global production network, are heavily exposed to these disruptions. This results in both significant costs and substantial exceeding of promised deadlines. If it concerns the first company in a supply chain, it causes correspondingly significant delays in promised deadlines for subsequent companies in the supply chain, including a correspondingly significant increase in costs. Both are exemplified in this paper through a case study. This case study demonstrates that through resilience, both implications can be significantly reduced. KW - Production Planning and Control KW - Aggregate Production Planning KW - Linear Programming KW - Multi-Site Production Planning and Control KW - Supply Chain Resilience Y1 - 2024 SN - 978-3-937436-84-5 U6 - https://doi.org/10.7148/2024-0345 SN - 2522-2422 SP - 345 EP - 351 PB - ECMS ER - TY - JOUR A1 - Trost, Marco A1 - Claus, Thorsten A1 - Herrmann, Frank T1 - Master Production Scheduling with Consideration of Utilization-Dependent Exhaustion and Capacity Load JF - Sustainability N2 - A large number of researchers have addressed social aspects in hierarchical production planning. This article responds to research gaps identified in our previous literature review. Accordingly, consideration of social aspects and the economic implications of social improvements are required in a longer term planning approach. For this, we integrate work intensity as employee utilization in a general mixed-integer programming model for master production scheduling. Following existing fatigue functions, we represent the relationship between work intensity and exhaustion through an employee-utilization-dependent exhaustion function. We account for the economic implications through exhaustion-dependent capacity load factors. We solve our model with a CPLEX standard solver and analyze a case study based on a realistic production system and numerical data. We demonstrate that the consideration of economic implications is necessary to evaluate social improvements. Otherwise, monetary disadvantages are overestimated, and social improvements are, thus, negatively affected. Moreover, from a certain level of work-intensity reduction, demand peaks are smoothed more by pre-production, which requires more core employees, while temporary employment is reduced. Further potential may arise from considering and quantifying other interdependencies, such as employee exhaustion and employee days off. In addition, the relationship between social working conditions and employee turnover can be integrated. KW - capacity load KW - employee utilization KW - exhaustion KW - linear optimization KW - master productionscheduling KW - ocial aspects Y1 - 2023 U6 - https://doi.org/10.3390/su15086816 VL - 15 PB - MDPI ER - TY - CHAP A1 - Herrmann, Frank ED - Herrmann, Frank T1 - Performance of Storage Strategies in a Highbay Warehouse T2 - SIMUL 2022, the 14th International Conference on Advances in System Simulation: October 16-20, 2022, Lisbon, Portugal N2 - Storage and retrieval times of goods in inventory processes determine the efficiency of highbay warehouses in companies. These times are highly dependent on the performance of rack feeders. Storage strategies have the greatest influence. The paper shows the impact of an efficient control of rack feeders through storage strategies. Storage strategies which are typically used in industrial inventory processes are analysed. For the analysis a simulation system is implemented, so that the real process times are similar to the simulated ones. This results in recommendations for the use of storage strategies in companies. KW - highbay warehouse KW - storage strategies KW - simulation of storages and retrievals of goods KW - Inventory processes Y1 - 2022 UR - https://www.thinkmind.org/index.php?view=article&articleid=simul_2022_1_120_58002 SN - 2308-4537 SP - 69 EP - 73 PB - IARIA ER -