TY - CHAP A1 - Terbrack, Hajo A1 - Claus, Thorsten A1 - Götz, Matthias A1 - Herrmann, Frank A1 - Selmair, Maximilian ED - Franke, Jörg ED - Schuderer, Peter T1 - Analyse von konventionellen Prioritätsregeln zur Reduktion von CO2-Emissionen durch den Einsatz von Photovoltaikanlagen T2 - Simulation in Produktion und Logistik 2021: Erlangen, 15.-17. September 2021 Y1 - 2021 UR - http://www.asim-fachtagung-spl.de/asim2021/papers/Proof_171.pdf SN - 978-3736974791 SP - 75 EP - 84 PB - Cuvillier Verlag CY - Göttingen ER - TY - JOUR A1 - Terbrack, Hajo A1 - Claus, Thorsten A1 - Herrmann, Frank T1 - Energy-Oriented Production Planning in Industry BT - A Systematic Literature Review and Classification Scheme JF - Sustainability N2 - Scarcity of resources, structural change during the further development of renewable energy sources, and their corresponding costs, such as increasing resource costs or penalties due to dirty production, lead industrial firms to adapt ecological actions. In this regard, research on energy utilization in production planning has received increased attention in the last years, resulting in a large number of research articles so far. With the paper at hand, we review the literature on energy-oriented production planning. The aim of this study is to derive similar core issues and related properties along energy-oriented models within hierarchical production planning. For this, we carry out a systematic literature review and analyze and synthesize 375 research articles. We classify the underlying literature with a novel two-dimensional classification scheme and identify three key topics and five frequently found characteristics, which are presented in detail throughout this article. Based on these results, we state several potentials for further research. KW - BI-OBJECTIVE OPTIMIZATION KW - EFFICIENT MULTIOBJECTIVE OPTIMIZATION KW - ELECTRICITY DEMAND RESPONSE KW - energy KW - FLEXIBLE JOB-SHOP KW - GREEN SCHEDULING OPTIMIZATION KW - HYBRID FLOW-SHOP KW - literature review KW - LOT-SIZING PROBLEM KW - MANUFACTURING SYSTEM KW - MULTIPURPOSE BATCH PLANTS KW - production planning KW - RENEWABLE ENERGY Y1 - 2021 U6 - https://doi.org/10.3390/su132313317 VL - 13 IS - 23 SP - 1 EP - 32 PB - MDPI CY - Basel ER - TY - CHAP A1 - Terbrack, Hajo A1 - Frank, Ingo A1 - Herrmann, Frank A1 - Claus, Thorsten A1 - Trost, Marco ED - Claus, Thorsten ED - Herrmann, Frank ED - Manitz, Michael T1 - Eine Literaturdatenbank zur Nachhaltigkeit in der hierarchischen Produktionsplanung T2 - Produktionsplanung und -steuerung Y1 - 2021 SN - 978-3-662-64290-0 U6 - https://doi.org/10.1007/978-3-662-64291-7_3 SP - 27 EP - 35 PB - Springer Gabler CY - Berlin, Heidelberg ER -