<?xml version="1.0" encoding="utf-8"?>
<export-example>
  <doc>
    <id>269</id>
    <completedYear/>
    <publishedYear>2015</publishedYear>
    <thesisYearAccepted/>
    <language>eng</language>
    <pageFirst>375</pageFirst>
    <pageLast>384</pageLast>
    <pageNumber/>
    <edition/>
    <issue/>
    <volume/>
    <type>conferenceobject</type>
    <publisherName/>
    <publisherPlace/>
    <creatingCorporation/>
    <contributingCorporation/>
    <belongsToBibliography>0</belongsToBibliography>
    <completedDate>2020-02-05</completedDate>
    <publishedDate>--</publishedDate>
    <thesisDateAccepted>--</thesisDateAccepted>
    <title language="eng">Potential of Reducing the Total Energy Consumption by Scheduling a Jobshop Production System</title>
    <abstract language="deu">This research paper has evaluated the potential of reducing energy consumption by scheduling jobshop production systems with machines using standby modes in free times. The initial introduction of the planning issue is followed by a description of the approach to assess the available potential. Subsequently, the research procedure by means of simulation, a detailed discussion of the results and a perspective on future research is given. Moreover, the notion that scheduling influences the energy consumption in jobshop production systems is supported. The presented simulation research also documents that there is no direct correlation between energy consumption and total lead time, although this was presumed usually. Finally, this paper provides a forecast for a possible optimisation model as well as an exemplary model with an energy-optimised schedule plan.</abstract>
    <parentTitle language="eng">Proceedings of the 16th International Conference on Simulation in Production and Logistics, September 23 - 25, 2015, Dortmund, Germany</parentTitle>
    <author>Maximilian Selmair</author>
    <author>Frank Herrmann</author>
    <author>Thorsten Claus</author>
    <author>Enrico Teich</author>
    <subject>
      <language>deu</language>
      <type>swd</type>
      <value>Produktionsplanung</value>
    </subject>
    <subject>
      <language>deu</language>
      <type>swd</type>
      <value>Reihenfolgeproblem</value>
    </subject>
    <subject>
      <language>deu</language>
      <type>swd</type>
      <value>Energieverbrauch</value>
    </subject>
    <collection role="ddc" number="67">Industrielle Fertigung</collection>
    <collection role="institutes" number="FakIM">Fakultät Informatik und Mathematik</collection>
    <collection role="othforschungsschwerpunkt" number="16316">Produktion und Systeme</collection>
  </doc>
</export-example>
