@article{RauchBrueckl, author = {Rauch, Johannes and Br{\"u}ckl, Oliver}, title = {Achieving Optimal Reactive Power Compensation in Distribution Grids by Using Industrial Compensation Systems}, series = {Electricity}, volume = {4}, journal = {Electricity}, number = {1}, publisher = {MDPI}, address = {Basel}, doi = {10.3390/electricity4010006}, url = {http://nbn-resolving.de/urn:nbn:de:bvb:898-opus4-59139}, pages = {78 -- 95}, abstract = {This paper presents a method for integrating industrial consumers owning compensation systems as alternative reactive power sources into grid operating processes. In remuneration, they receive a market-based provision of reactive power. The aim is to analyze the potential of reactive power compensation systems of industrial companies connected to medium-voltage (10 kV-30 kV) AC grids in order to increase the reactive power ability of distribution grids. Measurement methods and reactive power potential results of six industrial companies are presented to characterize the amount and temporal availability of their reactive power potential. The presented approach for using the decentralized reactive power potential is a centralized reactive power control method and is based on optimal power flow (OPF) calculations. An optimization algorithm based on linear programming is used to coordinate a reactive power retrieval tuned to the actual demand. The influencing quantities are the current grid status (voltage and load flow capacity reserves at grid nodes and power lines) and the current reactive power potential of the reactive power sources. The compensation impact of six measured industrial companies on an exemplary medium-voltage grid is shown by an application example.}, language = {en} } @inproceedings{SchweibererRauchBrueckl, author = {Schweiberer, Philipp and Rauch, Johannes and Br{\"u}ckl, Oliver}, title = {Control strategy for industrial reactive power sources depending on a specified reactive power setpoint value}, series = {ETG Kongress 2023: Die Energiewende beschleunigen, 25.-26. Mai 2023, Kassel, Germany}, booktitle = {ETG Kongress 2023: Die Energiewende beschleunigen, 25.-26. Mai 2023, Kassel, Germany}, publisher = {VDE VERLAG}, address = {Berlin}, organization = {Energietechnische Gesellschaft }, isbn = {978-3-8007-6108-1}, pages = {553 -- 558}, abstract = {Industrial plants can provide reactive power (Q) for system- and grid-serving behavior, for which a functioning reactive power management system is essential. To make reactive power retrieval as efficient and safe as possible, the selection of reactive power sources to meet the Q-demand must consider their sensitivities and the restrictions of the industrial grid, such as operating equipment utilization or voltage limits. On this basis, a concept for a sensitivity-based control strategy that manages the reactive power retrieval of multiple reactive power sources depending on a predefined reactive power demand value is proposed. Based on the simulation of an industrial plant in the medium-voltage grid, which can provide reactive power in the form of industrial compensation systems (ICS) and generators, the operation of the algorithm is shown.}, language = {en} } @inproceedings{GrabRauchGoetzetal., author = {Grab, Robin and Rauch, Johannes and G{\"o}tz, Rebekka and Br{\"u}ckl, Oliver and Eichner, Stefan and Engel, Bernd}, title = {Q-Dynamik: Blindleistungsstellgeschwindigkeiten im Verteilnetz}, series = {Zuk{\"u}nftige Stromnetze: 27.-28. Januar 2021, 03.-04. Februar 2021, Tagungsunterlagen}, booktitle = {Zuk{\"u}nftige Stromnetze: 27.-28. Januar 2021, 03.-04. Februar 2021, Tagungsunterlagen}, publisher = {Conexio-PSE GmbH}, address = {Pforzheim}, isbn = {978-3-948176-12-9}, url = {http://nbn-resolving.de/urn:nbn:de:bvb:898-opus4-58762}, pages = {46 -- 55}, abstract = {Mit der Energiewende geht eine starke Dezentralisierung der Energieeinspeisung einher. So sind im Deutschland des Jahres 2020 rund 31.000 Windenergieanlagen (WEA) in Betrieb, w{\"a}hrend bei der Solarenergie vor kurzem die zweimillionste Photovoltaik-Anlage (PVA) installiert wurde. Fast alle diese dezentralen Energieressourcen (DER) sind nach den Einspeiserichtlinien der Vergangenheit und der Gegenwart in der Lage, Blindleistung bereitzustellen, um die Spannung im Netz zu regeln und zum Blindleistungsausgleich beizutragen. Weitere potentielle dezentrale Blindleistungsquellen wie Blockheizkraftwerke, Kompensationsanlagen und perspektivisch sogar Verbraucher und Speicher sind im Verteilnetz zu finden. Durch den stetigen R{\"u}ckbau konventioneller Großkraftwerke, welche dem {\"U}bertragungsnetz bisher als Blindleistungsquellen zur Verf{\"u}gung standen, bedarf es einer Untersuchung mit der Fragestellung, in welchem Maß die neue Erzeugungslandschaft auch in diesem Feld als Ersatz dienen kann. Ein m{\"o}gliches Hindernis f{\"u}r einen breitangelegten Einsatz von DER zu Zwecken des spannungsebenen{\"u}bergreifenden Blindleistungsmanagements ist mangelndes Wissen {\"u}ber die Regeldynamik dieser verteilten Blindleistungsquellen. {\"U}bertragungs- und Verteilnetzbetreiber, die DER aktiv f{\"u}r Blindleistungsausgleich oder statische Spannungsregelung einsetzen, geben in der Regel ihre Blindleistungsanforderungen in kleineren Stufen mit erheblichen Latenzzeiten zwischen zwei Schritten weiter. Bef{\"u}rchtet wird, dass schnellere Spr{\"u}nge in der Blindleistungsvorgabe zu instabilen Betriebszust{\"a}nden oder anderweitigen Fehlfunktionen im Netz f{\"u}hren k{\"o}nnen. Eine genauere Kenntnis der dynamischen F{\"a}higkeiten vorhandener Blindleistungsquellen sowie der Auswirkungen auf die Netzstabilit{\"a}t und den Netzschutz k{\"o}nnte dazu beitragen, die Geschwindigkeit der Blindleistungsbereitstellung zu optimieren und somit tempor{\"a}re Spannungsschwankungen und -verluste zu minimieren und die Spannungsstabilit{\"a}t insgesamt zu verbessern. Durch eine entsprechende Regelungs- und Einsatzstrategie kann ein optimales Zusammenspiel der verschiedenen Technologien zur Deckung der Blindleistungsbedarfe f{\"u}r unterschiedliche Zeitbereiche erzielt werden. Hierf{\"u}r ist eine genaue Kenntnis der Blindleistungsstellgeschwindigkeiten und des dynamischen Regelverhaltens erforderlich. Dieser Beitrag stellt dazu Ergebnisse aus dem Forschungsprojekt „Q-Integral" vor. Um die relevanten Zeitkonstanten der Blindleistungsbereitstellung vollst{\"a}ndig aufzuf{\"u}hren, werden zun{\"a}chst typische Kommunikationszeiten f{\"u}r die {\"U}bermittlung von Sollwerten diskutiert. Anschließend werden Untersuchungen zu theoretischen und praktischen Reaktionszeiten verschiedener Blindleistungsquellen vorgestellt. Daf{\"u}r werden verschiedene Technologien wie Umrichter f{\"u}r PVA, Batteriespeicher und WEA sowie Synchrongeneratoren, die bei thermischen Kraftwerken die dominierende Technologie sind, betrachtet. Abschließend werden diese Werte mit realen Blindleistungsstellgeschwindigkeiten von ausgedehnten Wind- und Solarkraftwerken verglichen.}, language = {de} } @inproceedings{RauchBrueckl, author = {Rauch, Johannes and Br{\"u}ckl, Oliver}, title = {Konzeptionierung netzplanerischer Prozessans{\"a}tze zur Ermittlung von Blindleistungskapazit{\"a}ten zum Ausgleich des Blindleistungsbedarfs in einer Netzregion}, series = {Tagungsband Tagung Zuk{\"u}nftige Stromnetze 26./27. Januar 2022 (online)}, booktitle = {Tagungsband Tagung Zuk{\"u}nftige Stromnetze 26./27. Januar 2022 (online)}, publisher = {Conexio-PSE GmbH}, address = {Pforzheim}, isbn = {978-3-948176-16-7}, doi = {10.35096/othr/pub-5866}, url = {http://nbn-resolving.de/urn:nbn:de:bvb:898-opus4-58665}, pages = {117 -- 126}, abstract = {Um einen sicheren und zuverl{\"a}ssigen Stromnetzbetrieb zu gew{\"a}hrleisten, muss die Spannung im Grundfall als auch bei ungeplanten Ausf{\"a}llen in definierten Bereichen gehalten werden. Im {\"U}bertragungsnetz wird hierf{\"u}r bisher Blindleistung haupts{\"a}chlich aus Blindleistungskompensationsanlagen und konventionellen Großkraftwerken eingesetzt. Zuk{\"u}nftig wird nach \S12h EnWG eine marktgest{\"u}tzte Beschaffung dieser Dienstleistung zur Spannungsregelung vorgeschrieben. Zugleich ver{\"a}ndert sich der Blindleistungsbedarf der Netzbetriebsmittel durch die Integration erneuerbarer Energieanlagen und der Elektromobilit{\"a}t sowie durch den Netzausbau bei {\"U}bertragungs- und Verteilungsnetzbetreibern. Es bedarf somit angepasster Netzbetriebs- und Netzplanungskonzepte f{\"u}r ein technisch effizientes und wirtschaftlich g{\"u}nstiges Blindleistungsmanagement. Dieser Beitrag besch{\"a}ftigt sich damit, Prozessans{\"a}tze und Methodiken f{\"u}r ebendieses in der Netzplanung aufzuzeigen, um erforderliche Blindleistungskapazit{\"a}ten unter minimalen Gesamtkostenaufwand und unter Ber{\"u}cksichtigung einer effizienten Blindleistungsbedarfsdeckung zu bestimmen. Dabei liegt der Fokus verst{\"a}rkt in der Bedarfsanalyse.}, language = {de} } @inproceedings{RauchBrueckl, author = {Rauch, Johannes and Br{\"u}ckl, Oliver}, title = {Analysis of the correlation behavior between local available information to the overall reactive power of a medium-voltage grid group}, series = {Applied Research Conference - ARC 2017, 7 July 2017 M{\"u}nchen}, booktitle = {Applied Research Conference - ARC 2017, 7 July 2017 M{\"u}nchen}, address = {M{\"u}nchen}, url = {http://nbn-resolving.de/urn:nbn:de:bvb:898-opus4-58712}, pages = {224 -- 230}, abstract = {The initiated energy transition leads to extensive changes in the supply of energy. The increasing use of renewable energy causes a shift of the produced power from centralized conventional power plants to decentralized energy plants. Because of this redistribution and the related change of load-flows, new challenges and problems for distribution system operators appear. This includes the integration of new loads and plants into the existing power grid and the guarantee of a high supply security and quality. It also includes strengthened requirements for the use and provision of reactive power. The project "SyNErgie" ("Systemoptimierendes Netz- und Energiemanagement f{\"u}r Verteilungsnetze der Zukunft") deals with the development of a new reactive power management, which gets embedded in grid planning and controlling processes. One focus of the project is on the integration of decentralized energy plants (DEPs) to the reactive power management. The aim is to develop a decentralized and self-sufficient reactive power control system, which only works with local available information (measures). Therefore is no necessity of a complex communication system to the grid control center. Self-controlled Q-controller in the DEPs get characteristic curves and control the reactive power sources with local measurements (e.g. current, voltage, effective power). This new reactive power control management aims for the reactive power compensation in order to increase the integration capacity of loads and plants in a grid [2]. In order to generate characteristic curves for DEPs, it is necessary to analyze the correlation behavior between the local available measurements at the DEPs and the overall-Q-behavior of the grid group at the transformer. In that regard, influencing quantities should be considered. The aim is to involve und evaluate all relevant influencing quantities in order to determine energy plants and certain operating points, in which the correlation behavior and the prediction for the overall-Q-behavior are sufficient. The next step is to develop a model that fits these correlation behaviors and generate characteristic curves. One method to generate characteristic curves for the Q-controllers is regression analysis. The developed Q-control-system with the characteristic curves will be tested, evaluated and optimized in a following field test in cooperation with distribution system operators.}, language = {de} } @inproceedings{SchweibererRauchBrueckl, author = {Schweiberer, Philipp and Rauch, Johannes and Br{\"u}ckl, Oliver}, title = {Entwicklung eines Regelkonzeptes f{\"u}r einen optimierten Blindleistungsabruf auf Basis von Blindleistungspotentialanalysen bei Industriebetrieben im Mittelspannungsnetz}, series = {Tagungsband Tagung Zuk{\"u}nftige Stromnetze 26./27. Januar 2022 (online)}, booktitle = {Tagungsband Tagung Zuk{\"u}nftige Stromnetze 26./27. Januar 2022 (online)}, publisher = {Conexio-PSE GmbH}, address = {Pforzheim}, isbn = {978-3-948176-16-7}, doi = {10.35096/othr/pub-5870}, url = {http://nbn-resolving.de/urn:nbn:de:bvb:898-opus4-58704}, pages = {224 -- 233}, abstract = {Im Zuge der Energiewende ergibt sich ein Wandel in der Struktur des Elektrizit{\"a}tsversorgungsnetzes. Die Verschiebung der Erzeugungsleistung von konventionellen Großkraftwerken in h{\"o}heren Netzebenen hin zu dezentralen erneuerbaren Energieanlagen in niedrigeren Netzebenen resultiert sowohl in bidirektionalen Lastfl{\"u}ssen als auch in schwankenden Einspeisecharakteristiken. Des Weiteren folgen durch den Wegfall von Großkraftwerken als Blindleistungsquellen Leistungsdefizite in der {\"U}bertragungsnetzebene, die kompensiert werden m{\"u}ssen. Daraus resultieren Herausforderungen an einen sicheren und zuverl{\"a}ssigen Betrieb der Verteil- und {\"U}bertragungsnetze. Neue Konzepte m{\"u}ssen f{\"u}r die Erbringung von Blindleistung entwickelt werden, es soll mehr Blindleistung aus dem Verteilungsnetz zur Verf{\"u}gung gestellt werden, um die Systemstabilit{\"a}t zu wahren. Im Rahmen des Projektes Q-Integral wird das Thema „Blindleistung" (Q) ganzheitlich untersucht. Es werden dazu verschiedene Erbringungsoptionen f{\"u}r Blindleistung hinsichtlich technischer und wirtschaftlicher Potentiale untersucht, die in ein funktionales und effizientes Blindleistungsmanagement eingebracht werden. Die Untersuchungsans{\"a}tze daf{\"u}r sind sowohl spannungsebenen-{\"u}bergreifend als auch netzbetreiber-{\"u}bergreifend. Ein Ansatzpunkt des Projektes ist die Betrachtung der Blindleistungsbereitstellung von Industriebetrieben. Dazu wird das Potential von Betrieben, die an das Verteilnetz angeschlossen sind und Blindleistung durch Kompensations- oder Erzeugungsanlagen bereitstellen k{\"o}nnen, untersucht. Ziel ist es, das gesicherte und maximale induktive sowie kapazitive Potential zu bestimmen. Das gesicherte kapazitive Potential kann genutzt werden, um Aussagen dar{\"u}ber zu treffen, wie stark dem Spannungsfall im vorgelagerten Netz zu Starklastzeiten entgegengewirkt werden kann. Anhand des gesicherten induktiven Potentials kann ein Spannungsanstieg w{\"a}hrend Schwachlastzeiten ausgeglichen werden kann. In diesem Beitrag werden Ergebnisse aus dem Projekt Q-Integral vorgestellt. Dazu werden zuerst die Berechnungsgrundlagen der induktiven und kapazitiven Blindleistungspotentiale aufgezeigt und die Ergebnisse der Berechnungen vorgestellt. Die gewonnen Ergebnisse entstammen aus Messungen an einem Industriebetrieb mit Blindleistungskompensationsanlagen (BKA), den entsprechenden Reglern der Anlagen und einer installierten Kompensationsleistung von 1600 kvar. Sowohl die Lastg{\"a}nge als auch das Schaltverhalten der einzelnen Kompensationsanlagen liegen den Berechnungen zugrunde. Um den Austausch der Blindleistung an der {\"U}bergabestelle des Betriebs zum Mittelspannungsnetz netzdienlich einzustellen, bedarf es eines geeigneten Regelkonzepts, das neben den BKAs auch weitere Q-Quellen ber{\"u}cksichtigt. Deshalb wird abschließend ein Regelkonzept vorgestellt, das den technisch-optimierten Blindleistungsabruf unter Ber{\"u}cksichtigung mehrerer Blindleistungsquellen behandelt.}, language = {de} } @inproceedings{RauchBruecklEngel, author = {Rauch, Johannes and Br{\"u}ckl, Oliver and Engel, Bernd}, title = {Analysis and optimization of the steady state voltage deviation demand for reactive power planning using installed reactive power sources}, series = {NEIS 2022; Conference on Sustainable Energy Supply and Energy Storage Systems, 26-27 September 2022, Hamburg}, booktitle = {NEIS 2022; Conference on Sustainable Energy Supply and Energy Storage Systems, 26-27 September 2022, Hamburg}, editor = {Schulz, Detlef}, publisher = {VDE-Verlag}, address = {Berlin}, isbn = {978-3-8007-5983-5}, issn = {2510-6902}, pages = {175 -- 182}, abstract = {The provision of reactive power is one option for maintaining the grid voltage, that is defined as an ancillary service in Germany. This paper presents an approach for determining deficient voltage deviation demands within an electrical grid for long term reactive power planning investigations. In contrast to previous approaches, which evaluate the Q-behavior of extended ward elements or grid assets, voltage deviations are analyzed bus-specifically. So further reactive power planning investigations are able to scale and optimize additional reactive power sources directly on planning voltage limits using load flow sensitivity techniques. The focus lies on the analysis of the steady state demand at base case conditions. Therefore, a grid planning process is conceptualized. An optimal power flow algorithm based on Differential Evolution is used for an optimal reactive power dispatch of installed reactive power sources, e. g. reactive power compensation systems or (renewable) energy sources to minimize the total voltage deviation according to voltage limits of Transmission System Operators planning principles. Methodological and processuals specifications as well as an application use case with an exemplary transmission system are presented in this paper.}, language = {en} } @inproceedings{SchweibererRauchBrueckl, author = {Schweiberer, Philipp and Rauch, Johannes and Br{\"u}ckl, Oliver}, title = {Long-term analysis of industrial reactive power potentials with consideration of plant-internal grid restrictions using the example of an industrial plant in a distribution grid}, series = {NEIS 2022; Conference on Sustainable Energy Supply and Energy Storage Systems, 26-27 September 2022, Hamburg}, booktitle = {NEIS 2022; Conference on Sustainable Energy Supply and Energy Storage Systems, 26-27 September 2022, Hamburg}, editor = {Schulz, Detlef}, publisher = {VDE-Verlag}, address = {Berlin}, isbn = {978-3-8007-5983-5}, issn = {2510-6902}, pages = {51 -- 56}, abstract = {Since conventional generation plants provide a considerable share of reactive power but are gradually being shut down due to energy transition, leading to power deficits at the transmission grid level, new concepts for the supply of reactive power must be developed. As one possibility for the latter, industrial plants in the distribution grid are considered suitable, as their reactive power potentials can contribute to voltage maintenance and thus to a grid- or system-serving behavior. In this paper, the determination of reactive power potentials provided by industrial compensation systems (ICS) is presented. An industrial plant in the medium voltage grid, with three installed ICSs, is investigated. The potentials are determined and described based on their time characteristics, which provide information about the occurrence and distribution of inductive and capacitive potentials. A grid simulation of the investigated industrial grid is used to analyze the effects of retrieving the reactive power potentials regarding equipment utilizations and voltage limits.}, language = {en} } @inproceedings{HinterreiterBruecklRauch, author = {Hinterreiter, Marion and Br{\"u}ckl, Oliver and Rauch, Johannes}, title = {Methodology for long-term reactive power forecasts of medium-voltage grids}, series = {NEIS 2025 : Conference on Sustainable Energy Supply and Energy Storage Systems, Hamburg, September 15 - 16, 2025}, booktitle = {NEIS 2025 : Conference on Sustainable Energy Supply and Energy Storage Systems, Hamburg, September 15 - 16, 2025}, editor = {Schulz, Detlef}, publisher = {VDE Verlag}, isbn = {978-3-8007-6633-8}, pages = {218 -- 223}, abstract = {Understanding and assessing the long-term behavior of reactive power is crucial for power system planning and invest-ment decisions. This is particularly growing relevant for the lower voltage-grid levels, which are gaining importance due to significant changes in grid behavior, operational strategies, energy generation and consumption patterns. Currently, standardized methodologies for forecasting reactive power in medium-voltage grids are lacking, creating a gap in research and practical applications. To optimize grid investments and expansions, informed decisions based on reliable research and accurate forecasts are essential. This paper presents a methodology for long-term reactive power forecasting in me-dium-voltage grids, introducing a new approach to account for low- and medium-voltage grid interactions while address-ing common challenges like limited available grid data and scenario framework definition. The aim of the forecast is the future reactive power behaviour of a medium-voltage-grid at the high-voltage side of the high-voltage to medium-voltage transformer. The medium-voltage-level is modelled using a grid model approach, while low-voltage grids are being mod-elled using generic distribution grids. A 209-bus medium-voltage-grid model is used as an application example and to provide two exemplary use cases for a reactive power forecast for 2045.}, language = {en} } @inproceedings{StadlerKrausBrueckl, author = {Stadler, Andreas and Kraus, Hermann and Br{\"u}ckl, Oliver}, title = {Proposing an Optimization Model for a techno-economic Evaluation of Energy Storage Systems}, series = {PESS 2025 - IEEE Power and Energy Student Summit, October 08 - 10, 2025 in Munich, Germany}, booktitle = {PESS 2025 - IEEE Power and Energy Student Summit, October 08 - 10, 2025 in Munich, Germany}, editor = {Technische Universit{\"a}t M{\"u}nchen,}, publisher = {VDE}, isbn = {978-3-8007-6656-7}, pages = {97 -- 102}, abstract = {During the global energy crisis in 2022, electricity prices increased drastically. This lead, together with an overall higher price volatility to possibly higher electrical energy storage system (ESS) profitability. To test if the investment in an ESS can now be more profitable, an approach for a techno-economic evaluation of ESS is presented in this paper, using an optimization algorithm to determine the optimal way of covering a load flow profile with electricity trading products on the electricity market with and without the use of an energy storage system. The cost differences between using or not using the storage system are assumed to be the profits of the ESS, which must exceed the (interest-bearing) investment costs over its lifetime. The correct way of operation of the optimization model is validated and several storage sizes and capacities as well as several years of the electricity market data was analyzed, once with a perfect forecast of all prices of the electricity trading products and once with a forecast based on the previous years purchasing strategy. The results show that, using the prognosis and a 2 \% p.a. interest rate, only the storage combinations for 2.5 MWh/ 2.5 MW and 1 MWh/ 1 MW show profitability in 2023, whereas 2017 and 2020 show no profitability.}, language = {en} } @inproceedings{HinterreiterBruecklRauch, author = {Hinterreiter, Marion and Br{\"u}ckl, Oliver and Rauch, Johannes}, title = {Challenges and Approaches for Long-Term Reactive Power Forecasting in Power Systems}, series = {PESS 2025 - IEEE Power and Energy Student Summit, October 08 - 10, 2025 in Munich, Germany}, booktitle = {PESS 2025 - IEEE Power and Energy Student Summit, October 08 - 10, 2025 in Munich, Germany}, editor = {Technische Universit{\"a}t M{\"u}nchen,}, publisher = {VDE Verlag}, isbn = {978-3-8007-6656-7}, pages = {109 -- 114}, abstract = {The transition from fossil fuels to renewable energy sources is driving profound changes across all voltage levels of the electrical grid, altering active power (P) as well as reactive power (Q) behavior. This transformation involves a shift from predominantly top-down, unidirectional electricity flows to bidirectional and increasingly complex flow patterns, fundamentally altering the operation and utilization of power systems. Many countries are already reporting notable changes in their transmission grid Q. This can lead to increased costs for grid expansion and compensation equipment, as well as grid losses. To minimize these losses and ensure grid stability and efficiency, understanding and forecasting Q long-term becomes essential. This paper addresses the challenges of long-term (1-20 years) Q forecasting in general by analyzing Q behavior in grids, the main influencing grid parameters, and reviewing existing forecasting approaches. It evaluates the applicability of these approaches and highlights current research gaps and trends. By focusing on this underexplored area, the paper aims to support the development of more advanced and reliable long-term Q forecasting techniques.}, language = {en} } @inproceedings{RauchBruecklEngel, author = {Rauch, Johannes and Br{\"u}ckl, Oliver and Engel, Bernd}, title = {Optimal Reactive Power Planning by covering deficient voltage demands with additional reactive power sources using a sensitivity approach}, series = {NEIS 2023 : Conference on Sustainable Energy Supply and Energy Storage Systems, Hamburg, September 4 - 5, 2023}, booktitle = {NEIS 2023 : Conference on Sustainable Energy Supply and Energy Storage Systems, Hamburg, September 4 - 5, 2023}, editor = {Schulz, Detlef,}, publisher = {VDE Verlag}, address = {Berlin}, isbn = {978-3-8007-6134-0}, pages = {223 -- 230}, abstract = {The determination of the optimal location, types and size of additional required reactive power sources is a main interest of Reactive Power Planning (RPP) investigations and of this paper. The planning problem addresses the maintenance of voltage stability, which is an ancillary service in Germany, and can be formulated as a mixed-integer optimization prob-lem. The aim of this work is a techno-economically efficient coverage of the deficient steady state voltage deviation demands (VDD) by placing new reactive power sources with adequate size or extending the reactive power potential of existing sources. An optimization model is set up to solve the planning problem by using load flow voltage sensitivities, which quantify and evaluate the technical efficiency of new reactive power sources in relation to the present voltage deviation demands. Operating and investment costs are used as economic decision parameters. Within an application example, which is carried out with an exemplary transmission system, the solution of the planning problem is discussed.}, language = {en} } @article{LambertKrausDoepfertetal., author = {Lambert, Jerry and Kraus, Hermann and Doepfert, Markus and He, Miaomiao and Gschossmann, David and Ceruti, Amedeo and Nemeth, Isabell and Br{\"u}ckl, Oliver and Hamacher, Thomas and Spliethoff, Hartmut}, title = {Assessing the techno-economic impact of district heating on electrical distribution grid reinforcements}, series = {Advances in Applied Energy}, volume = {20}, journal = {Advances in Applied Energy}, publisher = {Elsevier}, issn = {2666-7924}, doi = {10.1016/j.adapen.2025.100251}, pages = {21}, abstract = {Enhanced sector coupling across electricity, mobility, and heating sectors leads to higher efforts for distribution grid upgrades. Based on a case study, this paper evaluates the role of district heating networks in reducing electrical distribution grid reinforcements and compares their economic viability against a building-specific heat supply using heat pumps. A detailed energy system model is used to analyze two building energy renovation scenarios: a business-as-usual scenario with a 1 \% annual renovation rate and an ambitious scenario with a rate of 2 \%. Using a two-step optimization, the impact of different district heating network penetration levels on the distribution grid is evaluated, followed by an ex-post analysis to incorporate a simultaneity factor into district heating networks. Overall, district heating networks can reduce distribution grid reinforcements, but the associated savings alone do not justify their construction, particularly in the ambitious renovation scenario. In the business-as-usual scenario, a district heating network can reduce reinforcement costs by up to 71 \%. However, in the ambitious scenario, grid reinforcements are already reduced due to lower heat peak demand, and the maximal reinforcement cost savings only amount to 35 \%. Compared economically, district heating networks are cost-competitive with building-specific heating only in the business-as-usual scenario, up to a heat supply share of 70 \% and in the ambitious scenario, up to 40 \%. In both scenarios, a district heating network can be a robust solution to lower macroeconomic costs for a carbon-neutral heat supply.}, language = {en} } @inproceedings{BruecklHaslbeckVogl, author = {Br{\"u}ckl, Oliver and Haslbeck, Matthias and Vogl, Bettina}, title = {Interpretation von P-Q-Wolken als Hilfsmittel zur Bewertung von Mittelspannungsnetzen}, series = {4. OTTI Konferenz: Zuk{\"u}nftige Stromnetze 31.01- 01.02.2017, Berlin}, booktitle = {4. OTTI Konferenz: Zuk{\"u}nftige Stromnetze 31.01- 01.02.2017, Berlin}, pages = {6}, abstract = {Zwischen {\"U}bertragungs-/Verteilungsnetzbetreibern bestehen Vereinbarungen in Form von Vertr{\"a}gen und Richtlinien (z.B. DCC), die das zul{\"a}ssige Wirk- und Blindleistungs-Verhalten (P-Q-Verhalten) beschreiben. Beim Blindleistungsverhalten werden i. d. R. zul{\"a}ssige cosφ-Bereiche definiert. Typische Werte sind hierf{\"u}r cosφ ≤ 0,95 f{\"u}r den I. und II. Quadranten sowie cosφ ≤ 0,925 f{\"u}r den III. Quadranten. Der IV. Quadrant ist unzul{\"a}ssig. Netzstruktur, Verbraucher und Erzeuger beeinflussen das P-Q-Verhalten, weshalb die Einhaltung der cosφ-Grenzwerte bei sich {\"a}ndernden Faktoren zu pr{\"u}fen und ggf. Gegenmaßnahmen (z. B. Installation von Kompensationsdrosseln) zu ergreifen sind. Ziel dieser Ver{\"o}ffentlichung ist es, geeignete Parameter zu identifizieren und zu beschreiben, die einen Einfluss auf das P-Q-Verhalten und damit auf die Form der PQ- Wolke einer MS-Netzgruppe (MS-NG) aufweisen. Abbildung 1 zeigt eine beispielhafte P-Q-Wolke. Um die P-Q-Wolken verschiedener MS-Netze vergleichbar zu machen, wurden die P- und Q-Werte auf die jeweilige Bemessungsleistung der versorgenden Umspannwerktransformatoren (UWT) normiert (diese betr{\"a}gt einheitlich 40 MVA). Die P-Q-Wolke besteht dabei aus allen ¼-h-Messwerten der Summenlast am UWT innerhalb eines Jahres. Als Linien angedeutet sind beispielhaft zul{\"a}ssige cosφ-Grenzen je Quadrant.}, language = {de} } @techreport{BruecklEllerHableretal., author = {Br{\"u}ckl, Oliver and Eller, Johannes and Habler, Florian and Sator, Tobias and Sippenauer, Thomas and Strohmayer, Bernhard and Stuber, Johannes}, title = {Zuk{\"u}nftige Bereitstellung von Blindleistung und anderen Maßnahmen f{\"u}r die Netzsicherheit : Endbericht zum Dienstleistungsauftrag}, pages = {210}, abstract = {Der Zweck dieser Studie liegt darin, aufzuzeigen, welche neuen Herausforderungen f{\"u}r den sicheren Netzbetrieb durch den Ausbau der erneuerbaren Energien entstehen und wie diesen zu begegnen ist. Dabei sind praxisnahe Handlungsempfehlungen abzuleiten und Vorschl{\"a}ge f{\"u}r erforderliche Anpassungen zu unterbreiten. Gegenstand der Be-trachtungen sind die - Blindleistung, - Kurzschlussleistung, - Momentanreserve und der - Netzwiederaufbau. Im Fokus dieser Betrachtungen steht allerdings die Bereitstellung der Blindleistung. Konkret soll diese Studie dazu folgende drei Leitfragen beantworten: - Werden die Potenziale der vorhandenen Technologien schon heute kosteneffi-zient genutzt? - L{\"a}sst sich mehr Kosteneffizienz durch eine transparentere und mehr marktge-st{\"u}tzte Beschaffung erzielen? - Welche Anreize w{\"a}ren zu setzen, um die notwendige Mindesterzeugung konven-tioneller Kraftwerke zu reduzieren. Alle drei Leitfragen m{\"u}nden letztlich in der {\"u}bergeordneten Zielsetzung, eine h{\"o}chst-m{\"o}gliche Kosteneffizienz bei der Bereitstellung von SDL zu erlangen.}, language = {de} } @inproceedings{HinterreiterRauchBrueckl, author = {Hinterreiter, Marion and Rauch, Johannes and Br{\"u}ckl, Oliver}, title = {Long-term reactive power forecasting power grids - Challenges and methodologies}, series = {Applied Research Conference - ARC 04.07.2025, Augsburg}, booktitle = {Applied Research Conference - ARC 04.07.2025, Augsburg}, pages = {6}, abstract = {The transition of power systems from fossil fuels to renewable energy sources is driving profound changes across all voltage levels of the electrical grid, altering active power (P) as well as reactive power (Q) behavior. This transformation involves a shift from predominantly top-down, unidirectional electricity flows to bidirectional and increasingly complex flow patterns, fundamentally altering the operation and utilization of power systems. The growing integration of distributed energy resources (DERs), heat pumps (HPs), and electric vehicles (EVs) is particularly impacting lower voltage levels, which are evolving from traditionally consumer-dominated networks into active participants in energy dynamics. These developments have a significant influence on reactive power behavior, with many countries already reporting notable changes due to increased Q contributions from lower voltage levels. As bidirectional flows and decentralized generation increase, understanding and forecasting reactive power trends at these voltage levels becomes essential for ensuring grid stability and efficiency. This paper addresses the challenges of long-term Q forecasting in general by analyzing reactive power behavior in grids, the main influencing grid parameters and introducing existing approaches and concepts, analyzing their applicability, and discussing the associated challenges and methodologies. By shedding light on this underexplored area, the study aims to contribute to the development of advanced long-term reactive power forecasting methods and highlighting research trends.}, language = {en} } @techreport{BruecklEllerAdeltetal., author = {Br{\"u}ckl, Oliver and Eller, Johannes and Adelt, Christian and Gschossmann, David and Kraus, Hermann and Rauch, Johannes and Sippenauer, Thomas and Susewind, Andreas and Wildfeuer, Matthias}, title = {Zuk{\"u}nftige Beschaffung von Blindleistung II : Endbericht zum Dienstleistungsauftrag}, pages = {143}, abstract = {Die vorliegende Studie befasst sich mit der Ermittlung des Bedarfs an Blindleistung f{\"u}r das gesamte deutsche Stromnetz auf Grundlage des NEP 2030 (2019) bis zum Jahr 2035. Die Verteilungsnetze werden dabei in ihrem Blindleistungsverhalten m{\"o}glichst realit{\"a}tsnah nachgebildet. Neben Maßnahmen zur Senkung des Blindleistungsbedarfs werden M{\"o}glichkeiten zur effizienten Deckung aufgezeigt. Dar{\"u}ber hinaus werden die mit der Blindleistungsbereitstellung verbundenen Kosten sowie die Methodik der Be-darfsermittlung beleuchtet.}, language = {de} } @article{BruecklMayer, author = {Br{\"u}ckl, Oliver and Mayer, Ulrike}, title = {Neues Forschungsprojekt f{\"u}r Biogasanlagen gestartet}, series = {SPEKTRUM}, journal = {SPEKTRUM}, number = {2}, publisher = {Spektrum}, address = {Regensburg}, pages = {35 -- 35}, abstract = {Wie k{\"o}nnen Biogasanlagen nach dem Auslaufen des EEG noch wirtschaftlich betrieben werden? Mit dieser Frage, der Untersuchung der Potenziale und Entwicklung eines Optimierungsmodells f{\"u}r Biogasanlagen im Kontext des zuk{\"u}nftigen Stromsystems besch{\"a}ftigt sich seit September 2018 ein interdisziplin{\"a}res Forscherteam der OTH Regensburg, der OTH Amberg-Weiden und des Instituts f{\"u}r Energietechnik IfE GmbH im Rahmen des Projekts OPTIBIOSY.}, language = {de} } @techreport{BruecklBreySchaechingeretal., author = {Br{\"u}ckl, Oliver and Brey, Ludwig and Sch{\"a}chinger, Johannes and Henneke, Markus and Eigenstetter, Florian and Vogel, Carolin and Ufkes, Antja}, title = {Netzst{\"u}tzung und Systemdienstleistungserbringung durch eine Industriezelle mit Inselnetzf{\"a}higkeit und Erneuerbaren Energien : Schlussbericht zum Verbundvorhaben: INZELL : Projektlaufzeit: 01.06.2020-31.12.2023}, address = {Regensburg}, doi = {10.2314/KXP:1928854451}, url = {http://nbn-resolving.de/urn:nbn:de:bvb:898-opus4-89261}, pages = {XXII, 316}, abstract = {Infolge der Verdr{\"a}ngung von konventionellen Großkraftwerken im Kontext nationaler Klimaschutzbem{\"u}-hungen entstehen offene Flanken im Bereich der Systemsicherheit. Um weiterhin eine hohe Qualit{\"a}t, Zuverl{\"a}ssigkeit und Sicherheit bei der Strom{\"u}bertragung und -verteilung zu gew{\"a}hrleisten, m{\"u}ssen ins-besondere: • bei der Bereitstellung von Blindleistung im {\"U}bertragungsnetz, wo trotz Zunahme der Vorhaltung steigende Defizite im Blindleistungshaushalt f{\"u}r die Zukunft vorhergesagt werden [1], • der Momentanreserve, die nicht mehr systemimmanent in vielen Erzeugungs- und Bezugsanla-gen vorhanden ist und • dem Netzwiederaufbau (NWA), der bislang mittels Großkraftwerke geplant ist, neue Maßnahmen zum Schließen der L{\"u}cken gefunden werden. Aufgrund zunehmend kostensensitiver Fertigungsprozesse bei deutschen Industriebetrieben besteht die Anforderung an eine hohe Zuverl{\"a}ssigkeit der Stromversorgung. Da sowohl l{\"a}nger andauernde Versor-gungsausf{\"a}lle als auch Spannungseinbr{\"u}che des {\"o}ffentlichen Versorgungsnetzes zu hohen Kosten durch Produktionsstillstand und Sch{\"a}den f{\"u}hren k{\"o}nnen, wird auch der Aspekt der Eigenabsicherung bzw. der h{\"o}heren Versorgungsqualit{\"a}t bedeutender. Des Weiteren sind speziell energieintensive Industrieunter-nehmen gefordert, die zum Teil bisweilen bereits bestehende Eigenerzeugung weiter auszubauen und Flexibilit{\"a}ten zu erschließen, um unabh{\"a}ngiger von hohen Strombezugskosten zu sein.}, language = {de} }