TY - JOUR A1 - Klenk, Eva Marianne A1 - Galka, Stefan T1 - Analysis of real-time tour building and scheduling strategies for in-plant milk-run systems with volatile transportation demand T2 - IFAC - PapersOnLine N2 - In modern manufacturing systems, milk run (MR) systems represent route-based, cyclic material-handling systems that are used widely and enable frequent deliveries of containerized parts in small lot sizes from a central storage area to multiple points of use on the factory floor. Usually, deliveries take place at predetermined, constant time intervals. As in real-world MR systems, the number of containers to deliver in each interval varies in the short term, peaks in the number of deliveries may lead to capacity bottlenecks and late deliveries. In this paper, we develop three alternative strategies to determine starting times of MR cycles in real-time based on the current number of delivery orders in the system aiming to better handle variations in the number of orders. We evaluate the three strategies for different system load scenarios with respect to delivery service levels, order lead times, systems utilization and necessary number of MR trains using a discrete-event simulation model. KW - Control algorithms KW - Logistics KW - Material handling KW - Milk-run systems KW - Production systems KW - Real-time decision making KW - Transportation control Y1 - 2019 UR - https://opus4.kobv.de/opus4-oth-regensburg/frontdoor/index/index/docId/2551 VL - 52 IS - 13 SP - 2110 EP - 2115 PB - Elsevier ER -