Refine
Language
- English (13)
Keywords
- Container terminal (1)
- Integer programming (1)
- Storage space allocation (1)
- Yard crane scheduling (1)
- approximation (1)
- approximation scheme (1)
- competitive analysis (1)
- online (1)
- online scheduling (1)
- scheduling (1)
We consider the scheduling problem of minimizing the average-weighted completion time on identical parallel machines when jobs are arriving over time. For both the preemptive and the nonpreemptive setting, we show that straightforward extensions of Smith's ratio rule yield smaller competitive ratios than the previously best-known deterministic on-line algorithms.
How to Whack Moles
(2004)
In the classical whack-a-mole game moles that pop up at
certain locations must be whacked by means of a hammer before they
go under ground again. The goal is to maximize the number of moles
caught. This problem can be formulated as an online optimization problem:
Requests (moles) appear over time at points in a metric space and
must be served (whacked) by a server (hammer) before their deadlines
(i.e., before they disappear). An online algorithm learns each request
only at its release time and must base its decisions on incomplete information.
We study the online whack-a-mole problem (wham) on the real
line and on the uniform metric space. While on the line no deterministic
algorithm can achieve a constant competitive ratio, we provide competitive
algorithms for the uniform metric space. Our online investigations
are complemented by complexity results for the offline problem.
We consider a model for scheduling under uncertainty. In this model, we combine the main characteristics of online and stochastic scheduling in a simple and natural way. Job processing times are assumed to be stochastic, but in contrast to traditional stochastic scheduling models, we assume that jobs arrive online, and there is no knowledge about the jobs that will arrive in the future. The model incorporates both, stochastic scheduling and online scheduling
as a special case. The particular setting we consider is non-preemptive parallel machine scheduling, with the objective to
minimize the total weighted completion times of jobs. We analyze
simple, combinatorial online scheduling policies for that model, and
derive performance guarantees that match performance guarantees previously
known for stochastic and online parallel machine scheduling, respectively.
For processing times that follow NBUE distributions, we
improve upon previously best known performance bounds from
stochastic scheduling, even though we consider a more general
setting.
Many online problems encountered in real-life involve a two-stage decision process: upon arrival of a new request, an irrevocable
first-stage decision (the assignment of a specific resource to the request) must be made immediately, while in a second stage process, certain ``subinstances'' (that is, the instances of all requests assigned to a particular resource) can be solved to optimality (offline) later.
We introduce the novel concept of an Online Target Date Assignment Problem (OnlineTDAP) as a general framework for online problems with this nature. Requests for the OnlineTDAP become known at certain dates. An online algorithm has to assign a target date to each request, specifying on which date the request should be processed (e.g., an appointment with a customer for a
washing machine repair). The cost at a target date is given by the downstream cost, the optimal cost of processing all requests
at that date w.r.t. some fixed downstream offline optimization problem (e.g., the cost of an optimal dispatch for service
technicians). We provide general competitive algorithms for the OnlineTDAP independently of the particular downstream problem,
when the overall objective is to minimize either the sum or the maximum of all downstream costs. As the first basic examples, we analyze the competitive ratios of our algorithms for the particular academic downstream problems of bin-packing, nonpreemptive scheduling on identical parallel machines, and routing a traveling salesman.
We consider a non-preemptive, stochastic parallel machine
scheduling model with the goal to minimize the weighted completion
times of jobs. In contrast to the classical stochastic model where jobs
with their processing time distributions are known beforehand, we assume
that jobs appear one by one, and every job must be assigned
to a machine online. We propose a simple online scheduling policy for
that model, and prove a performance guarantee that matches the currently
best known performance guarantee for stochastic parallel machine
scheduling. For the more general model with job release dates we derive
an analogous result, and for NBUE distributed processing times we
even improve upon the previously best known performance guarantee for
stochastic parallel machine scheduling. Moreover, we derive some lower
bounds on approximation.
This paper concerns the problem of operating a landside container exchange area that is serviced by multiple semi-automated rail mounted gantry cranes (RMGs) that are moving on a single bi-directional traveling lane. Such a facility is being built by Patrick Corporation at the Port Botany terminal in Sydney. The gantry cranes are a scarce resource and handle the bulk of container
movements. Thus, they require a sophisticated analysis to achieve near optimal utilization. We present a three stage algorithm to manage the container exchange facility, including the scheduling of cranes, the control of associated short-term container stacking, and
the allocation of delivery locations for trucks and other container transporters. The key components of our approach are a time scale decomposition, whereby an integer program controls decisions across a long time horizon to produce a balanced plan that is fed to a series of short time scale online subproblems, and a highly efficient space-time divisioning of short term storage areas.
A computational evaluation shows that our heuristic can find effective solutions for the planning problem; on real-world data it yields a solution at most 8% above a lower bound on optimal RMG utilization.
We consider scheduling to minimize the weighted sum of completion
times on a single machine that may experience unexpected changes in
processing speed or even full breakdowns. We design a polynomial
time deterministic algorithm that finds a robust prefixed scheduling
sequence with a solution value within~$4$ times the value
an optimal clairvoyant algorithm can achieve, knowing the
disruptions in advance and even being allowed to interrupt jobs at
any moment. A randomized version of this algorithm attains in
expectation a ratio of~$e$ w.r.t. a clairvoyant optimum.
We show that such a ratio can never be achieved by any deterministic
algorithm by proving that the price of robustness of any such
algorithm is at least~$1+\sqrt{3} \approx 2.73205>e$.
As a direct consequence of our results, the question whether a
constant approximation algorithm exists for the problem with given
machine unavailability periods is answered affirmatively. We
complement this result by an FPTAS for the preemptive and non-preemptive special case with a single
non-available period.
We consider scheduling on a single machine with one non-availability period to minimize the weighted sum of completion times. We provide a preemptive algorithm with an approximation ratio arbitrarily close to the Golden Ratio,~$(1+\sqrt{5})/2+\eps$, which improves on a previously best known~$2$-approximation. The non-preemptive version of the same algorithm yields a~$(2+\eps)$-approximation.
We consider the preemptive and non-preemptive problems of scheduling jobs with precedence constraints on parallel machines with the
objective to minimize the sum of~(weighted) completion times. We investigate an online model in which the scheduler learns about a
job when all its predecessors have completed. For scheduling on a single machine, we show matching lower and upper bounds of~$\Theta(n)$ and~$\Theta(\sqrt{n})$ for jobs with general and equal weights, respectively. We also derive corresponding results on parallel machines.
Our result for arbitrary job weights holds even in the more general stochastic online scheduling model where, in addition to the limited information about the job set, processing times are uncertain. For a
large class of processing time distributions, we derive also an improved performance guarantee if weights are equal.
We study two related problems in non-preemptive scheduling and packing of malleable tasks with precedence constraints to minimize the makespan. We distinguish the scheduling variant, in which we allow the free choice of processors, and the packing variant, in which a task must be assigned to a contiguous subset of processors.
For precedence constraints of bounded width, we completely resolve the complexity status for any particular problem setting concerning width bound and number of processors, and give polynomial-time algorithms with best possible performance. For both, scheduling and packing malleable tasks, we present an FPTAS for the NP-hard problem variants and exact algorithms for all remaining special cases. To obtain the positive results, we do not require the common monotonous penalty assumption on processing times, whereas our hardness results hold even when assuming this restriction.
With the close relation between contiguous scheduling and strip packing, our FPTAS
is the first (and best possible) constant factor approximation for (malleable) strip packing under special precedence constraints.