TY - THES U1 - Abschlussarbeit (Master) A1 - Claes, Fynn Joshua T1 - The Market Ramp-Up of Electric Road Systems in Germany and the EU – A critical Analysis of the Economic and Regulatory Timeframe and its defining Variables N2 - This master thesis aims to identify the defining variables for a market ramp-up of electric road systems (ERS) and to develop scenarios for the potential market launch of the technology in Germany and Europe. For this purpose, a comprehensive analysis of the political, regulatory and economic variables is conducted, which finally leads to the generation of different market ramp-up scenarios. AB - This master thesis aims to identify the defining variables for a market ramp-up of electric road systems (ERS) and to develop scenarios for the potential market launch of the technology in Germany and Europe. For this purpose, a comprehensive analysis of the political, regulatory and economic variables is conducted, which finally leads to the generation of different market ramp-up scenarios. KW - ERS KW - Electric Road System KW - Emissions KW - Market Ramp-Up KW - BEV Y1 - 2021 SP - 95 ER -