TY - JOUR A1 - Frede, Julian A1 - Krämer, Timo A1 - Rempel, Sergej A1 - Kasic, Slobodan T1 - 73 Meter lange integrale Holz-Carbonbeton-Verbundbrücke: Betontechnische Details zur Fuß- und Radwegbrücke über den Seeblickweg in Stuttgart JF - Beton- und Stahlbetonbau KW - Textilbeton KW - Radwegbrücke KW - Fußwegbrücke KW - Carbonbewehrung KW - Carbonschubbügel KW - GFK-Stab KW - Rissmonitoring KW - Holz-Beton-Verbundbrücke Y1 - 2024 U6 - https://doi.org/10.1002/best.202400080 SN - 0005-9900 IS - Early View ER - TY - CHAP A1 - Frede, Julian A1 - Rempel, Sergej A1 - Krämer, Timo A1 - Joachim, Andelfinger T1 - "Seeblickweg"-Bridge - 70-meter-long Integral Timber-Carbon-Concrete Composite Bridge in Stuttgart (Germany) T2 - IABSE Symposium Tokyo 2025: Environmentally Friendly Technologies and Structures: Focusing on Sustainable Approaches KW - crack monitoring KW - textile reinforced concrete KW - non-metallic reinforcement KW - pedestrian and cyclist bridge KW - carbon-fibre reinforced polymer KW - CRFP-stirrups KW - GFRP-rod KW - timber-concrete-composite bridge Y1 - 2025 SN - 978-3-85748-206-9 U6 - https://doi.org/10.2749/tokyo.2025.0654 IS - (IABSE Reports,121) SP - 654 EP - 661 PB - International Association for Bridge and Structural Engineering (IABSE) CY - Zürich ER -