Hydrogen-induced stress corrosion cracking (HSCC) is well known, and highly sensitive pre-stressing steels are normally not available on the market. But in the case of existing structures, it could be necessary to ensure their safety through special kinds of investigations. Those kinds of investigations are often not applicable in a non-destructive way.
Therefore, a once in a lifetime project was initiated.
In the course of the deconstruction of the "Bridge of the 20th anniversary of the GDR" at the Altstädter Bahnhof in Brandenburg a. d. Havel, new information on the initiation of hydrogen-induced stress cracks could obtained. The initial observation to do several investigations at this bridge are several meters long longitudinal cracks in the concrete web of the box girder above and below the tension duct. The BAM was commissioned by the Brandenburg State Road Administration to participate in a corresponding joint project which is financed by the Federal Ministry for Digital and Transport. The added value of the new information gained in this project goes beyond the specific structure. It describes unexpected new damage patterns that can be transferred to other structures with concentrated tendons (tendon block method and Baur-Leonhardt method) and were previously unknown in this form. These should be made known to other developers to enable them to initiate any necessary actions.
One of the major results is, the wire breaks observed at this bridge can be attributed to cracking as a result of HSCC and subsequent crack growth until breakage, due to cyclic loading from traffic and alternating restraint stresses. The probable trigger here was crevice corrosion processes at the contact points of the wires to the spacer plates in superposition with high tensile stresses due to prestressing after or with in grouting the duct. Tension wire breaks, which may have occurred before grouting and during prestressing, were not detected. The unfavorable gap situation at the spacer plates occurs over the entire cross-section of the prestressing channel and can thus affect each individual prestressing wire. Losses in the load-bearing capacity of the prestressed concrete structure can then be the result. A disadvantage of the prestressing block method in this respect is that a large number of individual wires can be affected at the same time (theoretically all wires), which can reduce the prestressing effect of the concentrated tendon accordingly. With the usual use of only one tendon per web, the possibility of load transfer to other tendons is thus not given (lack of redundancy).