Kerntechnische Entsorgung
Filtern
Dokumenttyp
- Vortrag (114)
- Beitrag zu einem Tagungsband (69)
- Posterpräsentation (27)
- Zeitschriftenartikel (21)
- Buchkapitel (7)
- Monografie (1)
- Beitrag zu einem Sammelband (1)
- Amtliche Bekanntmachung (1)
- Forschungsbericht (1)
Sprache
- Englisch (242) (entfernen)
Schlagworte
- Ageing (27)
- Drop test (17)
- Metal seal (17)
- Transport (17)
- IAEA (15)
- Ring Compression Test (14)
- Spent Nuclear Fuel (14)
- Ageing Management (13)
- Compression set (13)
- Radioactive material (13)
Organisationseinheit der BAM
- 3 Gefahrgutumschließungen; Energiespeicher (242) (entfernen)
Paper des Monats
- ja (2)
Eingeladener Vortrag
- nein (114)
Assessment of quality management for transport packages not requiring authority design approval
(2018)
The majority of transports of radioactive materials are carried out in packages which don’t need a package design approval of a competent authority. Low active radioactive materials are transported in such kind of packages e.g. in the medical and pharmaceutical industry and in the nuclear industry as well.
In Germany the decision to phase out nuclear energy leads to a strong demand for packages to transport low and middle active radioactive waste due to the dismantling and decommissioning of nuclear power plants. According to IAEA regulations the “non-competent authority approved package types” are the excepted packages and the industrial packages of Type IP-1, IP-2 and IP-3 and of Type A.
For the packages of Type IP-2, IP-3 and Type A an assessment by the German competent authority is required for the quality management for the design, manufacture, testing, documentation, use, maintenance and inspection. In general a compliance audit of the manufacturer of the packaging is required during this assessment procedure.
Packages for the transport of radioactive material are often equipped with impact limiters consisting of wood. Mostly this wood is encapsulated by steel sheets. The impact limiters are needed to ensure that the transport casks meet the IAEA safety requirements. According to the IAEA safety requirements a package has to withstand consecutively severe mechanical tests followed by a thermal test. The mechanical tests have to produce maximum damage concerning the thermal test. Following this, the impact limiters may have serious pre-damage when the thermal tests begins. The IAEA safety requirements state that during and following the fire test, the specimen shall not be artificially cooled and any combustion of materials of the package shall be permitted to proceed naturally.
Small scale fire tests with wood filled metal drums by BAM and works of the French Institute for Radiological Protection and Nuclear Safety (IRSN) showed that pre-damaged steel encapsulated wooden structures could start smoldering initiated by the thermal test. These processes supply additional energy to the cask which should be considered within the safety assessment of the package.
As not much is known about smoldering processes in encapsulated wooden structures with a reduced oxygen supply the need for a test was identified. To investigate the influence of a smoldering impact limiter concerning the amount of energy supplied to the cask in dependence of the time BAM conducted a large scale impact limiter thermal test. For that, a pre-damaged impact limiter with a diameter of 2,3 m was mounted on a water tank simulating a cask. A complex system of a regulated pump, a heater, a cooler, a slide valve, a flow meter and numerous thermocouples were installed and connected to a control unit to ensure all needed operating conditions.
After a pre-heating compared to typical SNF decay-heat, the 30 min lasting fire phase of the thermal test was started. After that, the expected and initiated smoldering began. The results of the large scale test are presented in this poster. Systematic small scale tests will follow to identify the influence of different parameters, e.g. moisture content and scale effects. The tests took place at BAM Test Site for Technical Safety (TTS) with its various possibilities for mechanical and thermal tests. The results of these tests will have direct influence in the safety assessment of transport cask for the transport of radioactive material.
Intermediate level waste often contains residual water or other liquids. The liquids can be decomposed due to radiolysis and can also vaporize especially under fire impact. These pressure generating processes are described. One example for the pressure determination inside a closed cask is discussed using two different approaches: analytical and CFD
Packages for the transport of radioactive material are often equipped with impact limiters consisting of wood. Mostly this wood is encapsulated by steel sheets. The impact limiters are needed to ensure that the transport casks meet the IAEA safety requirements. According to the IAEA safety requirements a package has to withstand consecutively severe mechanical tests followed by a thermal test. The mechanical tests have to produce maximum damage concerning the thermal test. Following this, the impact limiters may have serious pre-damage when the thermal tests begins. The IAEA safety requirements state that during and following the fire test, the specimen shall not be artificially cooled and any combustion of materials of the package shall be permitted to proceed naturally.
Small scale fire tests with wood filled metal drums by BAM and works of the French Institute for Radiological Protection and Nuclear Safety (IRSN) showed that pre-damaged steel encapsulated wooden structures could start smoldering initiated by the thermal test. These processes supply additional energy to the cask which should be considered within the safety assessment of the package.
As not much is known about smoldering processes in encapsulated wooden structures with a reduced oxygen supply the need for a test was identified. To investigate the influence of a smoldering impact limiter concerning the amount of energy supplied to the cask in dependence of the time BAM conducted a large scale impact limiter thermal test. For that, a pre-damaged impact limiter with a diameter of 2,3 m was mounted on a water tank simulating a cask. A complex system of a regulated pump, a heater, a cooler, a slide valve, a flow meter and numerous thermocouples were installed and connected to a control unit to ensure all needed operating conditions.
After a pre-heating compared to typical SNF decay-heat, the 30 min lasting fire phase of the thermal test was started. After that, the expected and initiated smoldering began. The results of the large scale test are presented in this poster. Systematic small scale tests will follow to identify the influence of different parameters, e.g. moisture content and scale effects. The tests took place at BAM Test Site for Technical Safety (TTS) with its various possibilities for mechanical and thermal tests. The results of these tests will have direct influence in the safety assessment of transport cask for the transport of radioactive material.
Packages for the transport of radioactive material are often equipped with impact limiters consisting of wood. Mostly this wood is encapsulated by steel sheets. The impact limiters are needed to ensure that the transport casks meet the IAEA safety requirements. According to the IAEA safety requirements a package has to withstand consecutively severe mechanical tests followed by a thermal test. The mechanical tests have to produce maximum damage concerning the thermal test. Following this, the impact limiters may have serious pre-damage when the thermal tests begins. The IAEA safety requirements state that during and following the fire test, the specimen shall not be artificially cooled and any combustion of materials of the package shall be permitted to proceed naturally.
Small scale fire tests with wood filled metal drums by BAM and works of the French Institute for Radiological Protection and Nuclear Safety (IRSN) showed that pre-damaged steel encapsulated wooden structures could start smoldering initiated by the thermal test. These processes supply additional energy to the cask which should be considered within the safety assessment of the package.
As not much is known about smoldering processes in encapsulated wooden structures with a reduced oxygen supply the need for a test was identified. To investigate the influence of a smoldering impact limiter concerning the amount of energy supplied to the cask in dependence of the time BAM conducted a large scale impact limiter thermal test. For that, a pre-damaged impact limiter with a diameter of 2,3 m was mounted on a water tank simulating a cask. A complex system of a regulated pump, a heater, a cooler, a slide valve, a flow meter and numerous thermocouples were installed and connected to a control unit to ensure all needed operating conditions.
After a pre-heating compared to typical SNF decay-heat, the 30 min lasting fire phase of the thermal test was started. After that, the expected and initiated smoldering began. The results of the large scale test are presented in this poster. Systematic small scale tests will follow to identify the influence of different parameters, e.g. moisture content and scale effects. The tests took place at BAM Test Site for Technical Safety (TTS) with its various possibilities for mechanical and thermal tests. The results of these tests will have direct influence in the safety assessment of transport cask for the transport of radioactive material
This presentation focusses on the thermal test of a typical storage container design for the German final storage repository KONRAD. The preparation of the container, the conduction of the fire test itself and results like the temperature evolution and as-sumptions for thermal material properties are shown.
As thermal test final storage containers have to be exposed to a fire of 800 °C (1472 °F) for 1 hour according to the final storage conditions provided by the federal com-pany for radioactive waste disposal (BGE). The here discussed cask contains a steel covered concrete layer of a thickness of 100/150 mm. Heating up concrete is a highly nonlinear process since the vaporization of residual water consumes high amounts of thermal energy and produce vast amounts of steam.
The constantly measured temperatures provide the basis to adjust common models of thermal properties for concrete esp. for FEAs. Finally in a later step this will allow predictions of similar designed container with different sizes.
The paper focuses on the preliminary determination of the bar length and the experimental performance of the 1m-puncture test in compliance with the guidelines of the IAEA under the given boundary conditions. Following aspects have to be considered concerning the determination of an appropriate length of the bar to obtain maximum damage to the specimen: the design of the package, its drop orientation and the impact point as well as a pre-damage of the package resulting from a previous 9m drop test. According to the Regulations the minimum length of the bar is defined as 20 cm, which has to be adapted to the outer surface of the package, especially to packages with large impact limiters.
In this context, two main aspects are important: First, the realisation of a maximum puncture load applied to the package while no other component of the package has contact with the impact target. Second, the reduction of the risk of buckling and maximising the stiffness of the bar by a length which is as short as possible. In order to optimize the bar length, finite element calculations are often done by simulating the global behaviour of the package during the puncture test. The evaluation of the conducted puncture test regarding IAEA compliance is done by analysing deceleration measurements. The paper presents a possible approach to determine the length of the bar and the construction of a form-fitted connection to the target showing various examples of puncture tests.
For many sealing applications rubbers are applied due to their special material properties and easy use. In many applications as e.g. in aviation, traffic or process technology the material can be exposed to low temperatures during operation. Therefore, it is important to know the material behaviour at those low temperatures to determine the temperature range that allows a safe operation of the seal.
In this work, we focus on the behaviour of elastomer seals at low temperatures with regard to potential decrease of leak-tightness or catastrophic seal failure of O-ring rubber seals. This is required as material properties of rubbers are strongly temperature dependent but their temperature application range is not always clearly defined.
Based on previous investigations which considered the physical material properties and the seal behaviour under purely static conditions we widen the focus on the sealing performance after a fast partial relief of compressed seals and additional materials.
For the investigations, different typical rubber seal materials were used as e.g. fluorocarbon (FKM), ethylene propylene diene (EPDM) and hydrogenated acrylonitrile-butadiene (HNBR) rubber.
The correlation of the physical material properties with seal performance is studied. This includes as well purely static sealing applications as the performance during/after fast partial relief of seals at low temperatures.
Assessment experience on packages loaded with damaged spent nuclear fuel for transport after storage
(2018)
In 2017 the first German package approval certificate was issued for a dual purpose cask (DPC) design with encapsulated damaged spent nuclear fuel. At the Bundesanstalt für Materialforschung und -prüfung (BAM) a comprehensive assessment procedure was carried out with respect to the mechanical and thermal design, the containment design and quality assurance for manufacturing and operation. Main objective of this procedure was to verify the Package Design Safety Report (PDSR) fulfils the requirements according to the IAEA regulations SSR-6.
Until now only standard spent nuclear fuel assemblies were designated for interim storage and transports. Due to nuclear phase out in Germany all other kinds of SNF in particular damaged fuel has to be packed. Therefore specific requirements have to be considered in accordance with international experiences written in IAEA technical reports. In Germany damaged spent nuclear fuel (DSNF) needs a tight encapsulation with special encapsulations and clearly defined properties.
Due to the limited amount of DSNF these encapsulations are designed for storage and transport in existing packages. From the assessment experience it has been seen, corresponding PDSR need an extensively expansion to cover the design of these encapsulations and their influences on the package. Then such well-defined encapsulations can be handled like standard fuel assemblies. The main difference to standard package components is, encapsulations with permanent closure achieve their specified condition not after manufacturing but only during operation after loading and closing.
Thus specific handling instruction and test procedures are necessary especially for welding, where BAM is able to survey the quality of this first part of operation.