7.2 Ingenieurbau
Filtern
Dokumenttyp
- Vortrag (4)
- Beitrag zu einem Tagungsband (1)
Referierte Publikation
- nein (5)
Schlagworte
- Windenergie (5) (entfernen)
Organisationseinheit der BAM
- 7.2 Ingenieurbau (5) (entfernen)
Eingeladener Vortrag
- nein (4)
The EU member states have set out ambitious long-term goals for deploying offshore wind energy. The installed offshore wind capacity is set to increase from 14.6 GW in 2021 to around 320 GW in 2050. This signifies the role of offshore wind energy as a major contributor to reaching the EU’s climate and energy goals. To ensure that the defined targets are met, a significant number of new wind farms has to be installed and existing wind farms reaching the end of their planned life need to be reused efficiently. Some of the relevant reuse alternatives are lifetime extension, repowering based on the existing support structures and repowering with new turbines.
As a basis of the decision-making regarding the reuse of existing offshore wind farm, the expected utility of each relevant option should be determined based on the associated expected rewards, costs and risks. The optimal concept maximizes the utility of the decision-maker and fulfills the existing constraints and requirements. To facilitate such a quantitative decision-making, models and methods have to be developed. In particular, models are required that enable predictions of (a) the condition and performance of the turbines and support structures and (b) the renumeration, costs and consequences of adverse events. These predictions have to consider (a) the governing uncertainties, (b) the available information from the planning, construction, installation and operating phase, (b) potential repair, retrofitting and strengthening schemes and (c) possible monitoring, inspection and maintenance regimes for the future operating phase.
Over the past years, several models, methods and tools have been developed at the Bundesanstalt für Materialforschung und -prüfung (BAM) to support the structural integrity management of offshore wind turbine substructures. These include:
(a) a prototype for reliability-based, system-wide, adaptive planning of inspections of welded steel structures in offshore wind farms,
(b) a method for monitoring and risk-informed optimization of inspection and maintenance strategies for jacket structures subject to fatigue, and
(c) a probabilistic cost model of inspection and maintenance of welded steel structures in offshore wind farms.
This contribution provides an overview on these works and discusses how they can be adapted and extended to support the decision-making regarding lifetime extensions and repowering of offshore wind farms.
Mit der Errichtung und der Inbetriebnahme des Windpark alpha ventus wurden umfangreiche Messungen an den Tragstrukturen und den Umgebungsparametern durchgeführt. Im Projekt Gigawind life wurde im TP1 ein Datenmanagementsystem zur kontinuierlichen und periodisch fortgeführten Datenauswertung für große Datenbestände (Big Data) entworfen und realisiert. Anhand von Performanceuntersuchungen konnte eine Verkürzung der Rechenzeit um den Faktor 10 in einem Rechencluster erreicht werden. Unter Anwendung einer Datenpipeline nach dem Publish/Subscribe Prinzip wird eine skalierbare Datenschnittstelle für Monitoringdaten vorgeschlagen.
Mit der Errichtung und der Inbetriebnahme des Windpark alpha ventus wurden umfangreiche Messungen an den Tragstrukturen und den Umgebungsparametern durchgeführt. Im Projekt Gigawind life wurde im TP1 ein Datenmanagementsystem zur kontinuierlichen und periodisch fortgeführten Datenauswertung für große Datenbestände (Big Data) entworfen und realisiert. Anhand von Performanceuntersuchungen konnte eine Verkürzung der Rechenzeit um den Faktor 10 in einem Rechencluster erreicht werden. Unter Anwendung einer Datenpipeline nach dem Publish/Subscribe Prinzip wird eine skalierbare Datenschnittstelle für Monitoringdaten vorgeschlagen.
Dieser Kurzvortragg erläutert nichtlineare Phänomene die angesichts der aktuell wachsenden Dimensionen von Monopfahlgründungen für Offshorewindenergieanlagen zunehmend an Bedeutung gewinnen. Insbesondere wird dabei auf das Pfahlfußbeulen sowie das Schalenbeulen des bereits installierten Pfahles eingegangen.