This presentation discusses the potentials of probabilistic methods in offshore foundation installation, from the perspective of probabilistic ground models and data-driven site characterization. We discuss about methodologies for utilizing site-specific geotechnical (CPT) and geological data, aiming to construct an integrated ground model that can predict stratigraphic profiles and useful for geotechnical design parameters at any location within a 3D domain. The predicted parameters and stratigraphy are then used to predict the probability of potential pile tip damage, upon collision with a boulder.
Monopile-Gründungen sind die mit Abstand am häufigsten verwendete Gründungskonstruktion für Offshore-Windenergieanlagen. Ein wesentliches Problem bei der Bemessung ist das lokale Beulen des Gründungspfahls, welches typischerweise im Bereich der Bettung auftritt. Aufgrund der Nichtlinearität der Bettungsrandbedingung sind klassische Bemessungsansätze nicht anwendbar, so dass der Bemessungsingenieur auf eine vollständig numerische Berechnung zurückgreifen muss. In diesem Vortrag wird eine experimentelle Versuchskampagne zur Erzeugung von Kalibrierungsdaten für solche numerischen Modelle vorgestellt. Eine ausführlichere Darstellung findet sich im gleichnamigen Artikel.
Monopiles are currently the predominant foundation type for offshore wind turbines in Europe. Due to the increasing dimensions of the turbines, pile diameters beyond 10m become necessary. A design-relevant failure mode of monopiles is the local buckling of the pile wall in the embedded sections. Relevant buckling guidelines do not consider the soil-structure interaction specifically, although the embedment may allow for a reduction of wall thickness. However, Eurocode-based design concepts require a validation with comparative buckling cases for validation, either in terms of buckling curve parameters for both the algebraic stress-based and semi-numerical LBA/MNA design concept or as a calibration factor kGMNIA for fully numerical GMNIA calculations. These parameters are not yet available for embedded shells. To close this gap, we have conducted experiments on piles embedded in sand to investigate local buckling under soil-structure-interaction. The results will be used to calibrate numerical models. This research was carried out as part of the VERBATIM research project, funded by PTJ/BMWK and supported by the Carbon Trust's Offshore Wind Accelerator consortium.
The research project Verification of Buckling Assessment and Behaviour in Large Monopiles (VERBATIM) focuses on challenges arising due to the ongoing increase of dimensions of monopiles as foundation for offshore wind turbines. This project is focused on two main topics:
- Monopile tip buckling during pile installation
- Local buckling of embedded piles during operation
It is known from previous investigations and experiences in practice that large deformations of a monopile tip during offshore installation works can occur. These large deformations initiated at the tip of the monopile are commonly referred to as “pile tip buckling”. Own research focuses on optimising monopile dimensions to reduce the cost of monopile foundations for offshore wind turbines while preventing pile tip buckling.
Buckling of embedded cylindrical shells for offshore structures is a common engineering task. Structures can be analysed using standard software and have been done so in recent studies e.g., Gottschalk. However, the trend towards larger monopile and optimised structures has led to a fundamental need for better and verified models. A main challenge is the submodelling of the structure-soil-interaction. Developing such complex models is one main goal of the VERBATIM project.
For both main topics model tests were performed at the laboratories of BAM and TU Berlin. These experimental results were used to verify related numerical models and simulations.
Grouted connections are intensively used in offshore rigs, platforms as well as jacket and monopile offshore wind turbine structures. Being located in remote offshore conditions, these connections can experience considerable adverse loading during their lifetimes. Degradation was reported inside similar connections, which were installed in the last three decades. Grouting in the offshore sites may often be proven difficult, which eventually leads to reduced load-bearing capacity of connections in the long run. Thus, repair and rehabilitation of such connections should be planned ahead to minimize operational delays and costs. In this study, scaled grouted connections were manufactured using a novel mould, whose integrity were monitored using digital image correlation (DIC). The connections were loaded under static load to visualize the main failure pattern using distributed fibre optic sensors and acoustic emission (AE) analysis. Grouted connections were then repaired using a cementitious injectable grout. The effectiveness of the grout injection was monitored using dye penetration technique. Finally, specimens are reloaded to identify the potential of such repair for grouted connections.
Remediation of Cracks Formed in Grouted Connections of Offshore Energy Structures under Static Loads
(2018)
The future energy demand necessitates the exploration of all potential energy sources both onshore and offshore. Global trend has shifted towards offshore energy, which can be obtained from either carbon intensive or renewable options, hence requiring structures such as rigs, platforms, and monopiles. Most of these structures adopt easily installable construction techniques, where lower foundation need to be connected with the super structure by mean of grouted composite joints. Generally, these composite connections have exterior sleeve, interior pile and infill grout. Being located in remote offshore conditions, connections can experience considerable adverse loading during their lifetimes. Degradations were reported inside similar connections, which were installed in last three decades. Besides, grouting in the offshore sites may often be proven difficult, which eventually leads to reduced capacity of connections in the long run. Thus, repair and rehabilitation of such connections should be planned ahead to minimize operational delays and costs in the future. This study aims at characterizing the nature of crack generation in grouted connections and thereby identifying the potential of repair using suitable repair material. Scaled grouted joints were manufactured using a novel mold, and connections were loaded under static load to visualize the main failure pattern. The failure mechanism and loading capacity are found compatible to previous results from earlier literature. Grouted connection was then repaired using cementitious injectable grout. The effectiveness of the repair system is also discussed.
Remediation of Cracks Formed in Grouted Connections of Offshore Energy Structures under Static Loads
(2018)
The future energy demand necessitates the exploration of all potential energy sources both onshore and offshore. Global trend has shifted towards offshore energy, which can be obtained from either carbon intensive or renewable options, hence requiring structures such as rigs, platforms, and monopiles. Most of these structures adopt easily installable construction techniques, where lower foundation need to be connected with the super structure by mean of grouted composite joints. Generally, these composite connections have exterior sleeve, interior pile and infill grout. Being located in remote offshore conditions, connections can experience considerable adverse loading during their lifetimes. Degradations were reported inside similar connections, which were installed in last three decades. Besides, grouting in the offshore sites may often be proven difficult, which eventually leads to reduced capacity of connections in the long run. Thus, repair and rehabilitation of such connections should be planned ahead to minimize operational delays and costs in the future. This study aims at characterizing the nature of crack generation in grouted connections and thereby identifying the potential of repair using suitable repair material. Scaled grouted joints were manufactured using a novel mold, and connections were loaded under static load to visualize the main failure pattern. The failure mechanism and loading capacity are found compatible to previous results from earlier literature. Grouted connection was then repaired using cementitious injectable grout. The effectiveness of the repair system is also discussed.