7.2 Ingenieurbau
Filtern
Dokumenttyp
- Vortrag (170) (entfernen)
Referierte Publikation
- nein (170) (entfernen)
Schlagworte
- Structural Health Monitoring (16)
- Offshore wind energy (9)
- Ground vibration (8)
- Brücken (7)
- Fatigue (7)
- Offshore (7)
- Design methods (6)
- Physical phenomenology (6)
- Pile foundations (6)
- Structural health monitoring (6)
Organisationseinheit der BAM
- 7.2 Ingenieurbau (170) (entfernen)
The aim of the study is to infer the soil stratification from the provided CPT and borehole data. We infer the soil type at any location within the domain of interest from the SBT index Ic (Robertson, 2009). This index can be directly related to the CPT data through an empirical correlation model. In addition, the soil classes contained in the borehole logs can be expressed as bounds on Ic. A log-transformation was applied to Ic, Y = ln(Ic), and Y was modelled by a 3D Random Field, with a fully Bayesian hierarchical Gaussian Process model to explicitly capture uncertainties.
One crucial metric of interest to wind farm operators is the remaining useful life (RUL) of single components, wind turbines, or even entire wind farms. Occasionally, questions arise regarding how to operate a turbine, even in the presence of manufacturing or design errors, which from a computational design standpoint reduce the remaining lifetime below the intended service life. A typical measure involves adapting the monitoring and inspection plan. Using such a maintenance plan, the author intends to simulate the lifetime of jacket-type structure in a fatigue test. The objective of the experiment is to demostrate that systems like three-dimensional jackets possess redundancies that enable reliable continued operation, despite the reduced fatigue life of individual components due to technical flaws, if an appropriate maintenance concept is in place. This presentation discusses the steps leading to the procedure of the experiment including the design process and the maintenance planning.
The EU member states have set out ambitious long-term goals for deploying offshore wind energy. The installed offshore wind capacity is set to increase from 14.6 GW in 2021 to around 320 GW in 2050. This signifies the role of offshore wind energy as a major contributor to reaching the EU’s climate and energy goals. To ensure that the defined targets are met, a significant number of new wind farms has to be installed and existing wind farms reaching the end of their planned life need to be reused efficiently. Some of the relevant reuse alternatives are lifetime extension, repowering based on the existing support structures and repowering with new turbines.
As a basis of the decision-making regarding the reuse of existing offshore wind farm, the expected utility of each relevant option should be determined based on the associated expected rewards, costs and risks. The optimal concept maximizes the utility of the decision-maker and fulfills the existing constraints and requirements. To facilitate such a quantitative decision-making, models and methods have to be developed. In particular, models are required that enable predictions of (a) the condition and performance of the turbines and support structures and (b) the renumeration, costs and consequences of adverse events. These predictions have to consider (a) the governing uncertainties, (b) the available information from the planning, construction, installation and operating phase, (b) potential repair, retrofitting and strengthening schemes and (c) possible monitoring, inspection and maintenance regimes for the future operating phase.
Over the past years, several models, methods and tools have been developed at the Bundesanstalt für Materialforschung und -prüfung (BAM) to support the structural integrity management of offshore wind turbine substructures. These include:
(a) a prototype for reliability-based, system-wide, adaptive planning of inspections of welded steel structures in offshore wind farms,
(b) a method for monitoring and risk-informed optimization of inspection and maintenance strategies for jacket structures subject to fatigue, and
(c) a probabilistic cost model of inspection and maintenance of welded steel structures in offshore wind farms.
This contribution provides an overview on these works and discusses how they can be adapted and extended to support the decision-making regarding lifetime extensions and repowering of offshore wind farms.
Monopile-Gründungen sind die mit Abstand am häufigsten verwendete Gründungskonstruktion für Offshore-Windenergieanlagen. Ein wesentliches Problem bei der Bemessung ist das lokale Beulen des Gründungspfahls, welches typischerweise im Bereich der Bettung auftritt. Aufgrund der Nichtlinearität der Bettungsrandbedingung sind klassische Bemessungsansätze nicht anwendbar, so dass der Bemessungsingenieur auf eine vollständig numerische Berechnung zurückgreifen muss. In diesem Vortrag wird eine experimentelle Versuchskampagne zur Erzeugung von Kalibrierungsdaten für solche numerischen Modelle vorgestellt. Eine ausführlichere Darstellung findet sich im gleichnamigen Artikel.
The Federal Institute of Material Research and Testing has performed many impact tests from very small laboratory tests to very big “free-field” tests with heavy containers on stiff foundations. The first measurements have been done on a big foundation where it should be guaranteed that the foundation is rigid and the container is tested properly. Later on, a smaller drop test facility has been built on the ground inside an existing building. It had to be controlled by prediction and measurements that the drop test will not damage the building. Tests from different heights on soft, medium, and stiff targets have been done to find out rules which allow to identify acceptable and unacceptable drop tests. Later on, the biggest drop test facility has been built for masses up to 200 t. It was necessary for the design of the foundation to estimate the forces which oc-cur during the drop tests. In addititon, the acceptable tests should be selected and controlled by measurements where the impact duration is important. Dif-ferent sensors, accelerometers, accelerometers with mechanical filters, geo-phones (velocity transducers), strain gauges, and pressure cells have been ap-plied for these tasks. Signal transformations and model calculations have been used to check and understand the dynamic measurements. The simplest law is the conservation of the momentum which is a good approximation if the impact is short. If the soil under the foundation has an influence on the deceleration of the container, the maximum foundation velocity is lower than the simple esti-mation.
The research project Verification of Buckling Assessment and Behaviour in Large Monopiles (VERBATIM) focuses on challenges arising due to the ongoing increase of dimensions of monopiles as foundation for offshore wind turbines. This project is focused on two main topics:
- Monopile tip buckling during pile installation
- Local buckling of embedded piles during operation
It is known from previous investigations and experiences in practice that large deformations of a monopile tip during offshore installation works can occur. These large deformations initiated at the tip of the monopile are commonly referred to as “pile tip buckling”. Own research focuses on optimising monopile dimensions to reduce the cost of monopile foundations for offshore wind turbines while preventing pile tip buckling.
Buckling of embedded cylindrical shells for offshore structures is a common engineering task. Structures can be analysed using standard software and have been done so in recent studies e.g., Gottschalk. However, the trend towards larger monopile and optimised structures has led to a fundamental need for better and verified models. A main challenge is the submodelling of the structure-soil-interaction. Developing such complex models is one main goal of the VERBATIM project.
For both main topics model tests were performed at the laboratories of BAM and TU Berlin. These experimental results were used to verify related numerical models and simulations.
The long-term preservation of our infrastructure requires not only intelligent sensor technology and highly developed monitoring procedures, but also innovative digital tools for analyzing, evaluating and utilizing the results. This includes mathematical and, in particular, probabilistic methods for damage detection and tracking as well as for calculating service life and maintenance cycles and data management. The example project Maintal Bridge Gemuenden as part of the AISTEC project shows the workflow for the implementation of structural health monitoring and experimental tests with a train of Deutsche Bahn. The influence lines, as one possible way for damage detection, were measured with a highly accurate GNSS System to locate the trains position when crossing the bridge. The results were compared to measurements from 1987 just before the bridge went in operation.
The new crack luminescence method offers the possibility of making fatigue surface cracks in metallic materials more visible during inspections through a special coating system. This coating system consists of two layers, whereby the first layer has fluorescent properties and emits visible light as soon as it is irradiated by UV light. The top layer is black and is designed to prevent the fluorescent layer from emitting if no crack develops in the underlying material.
The technique proved particularly useful in a wide variety of fatigue tests of steel components under laboratory conditions. Moreover, it has the potential to be used in various industrial applications. To enable industrial deployment and integration into maintenance strategies, a concept study is developed in this contribution, resulting in a qualification framework that can serve as a foundation for determining the reliability of the crack luminescence system in terms of a probability of detection curve. Within this study, factors causing measurement variability and uncertainty are being determined and their influences assessed. Due to the extension of the system by a moving computer vision system for automated crack detection using artificial intelligence, additional long-term effects associated with structural health monitoring systems need to be incorporated into an extended probability of detection study as part of the technical justification.
Finally, important aspects and findings related to design of experiments are discussed, and a framework for reliability assessment of a new optical crack monitoring method is presented, emphasizing the influence of various uncertainty parameters, including long-term effects such as system ageing.
Brücken sind Teil der alternden Verkehrsinfrastruktur. Um die Nutzungsdauer zu verlängern und plötzliche Schäden zu detektieren kann Bauwerksmonitoring ("Structural Health Monitoring") eingesetzt werden. Der Einfluss von Umgebungsbedingungen, beispielsweise der Temperatur, auf das Bauwerksverhalten ist meist größer als der Einfluss von Schäden. Diese Einflüsse bestmöglich voneinander zu trennen und Veränderungen im Tragverhalten korrekt Schäden oder Umgebungsbedingungen zuzuordnen ist eine offene Forschungsfrage. Diese Arbeit zeigt eine mögliche Lösung, bei der gekoppelte Modelle von Umwelteinflüssen, Schäden und Tragverhalten des Bauwerks auf Grundlage von Monitoringdaten aktualisiert werden. Das Framework dazu wird vorgestellt und an einem Laborexperiment eines Stahlbetonbalkens in der Klimakammer angewandt. Die Ergebnisse bestätigen die Vorgehensweise. In nächsten Schritten müssen komplexere Tragwerke und die Sensitivität des Ansatzes untersucht werden.