Filtern
Erscheinungsjahr
- 2017 (7) (entfernen)
Dokumenttyp
- Vortrag (4)
- Beitrag zu einem Tagungsband (2)
- Zeitschriftenartikel (1)
Referierte Publikation
- nein (7)
Schlagworte
- Zerstörungsfreie Prüfung (3)
- LiDAR (2)
- NDT (2)
- Beton (1)
- Bridge inspection (1)
- Brücke (1)
- Brücken (1)
- Brückeninfrastruktur (1)
- Innovative Messverfahren (1)
- Istzustandserfassung (1)
Eingeladener Vortrag
- nein (4)
Im deutschen Eisenbahnnetz sind ca. 80 Millionen Spannbetonschwellen verbaut. Analog zu anderen Bauwerken werden Wpannbetonschwellen regelmäßig visuell inspiziert. Die Rissbildung ist bei diesen Inspektionen ein Kriterium für die Schädigung einer Spannbetonschwelle. Durch Rissbildung kann es passieren, dass Betonschwellen ihre Nutzungsdauer nicht erreichen.
With the mandatory introduction of the May 2011 directive for reassessment of bridges in Germany, the administrations of the federal and state governments have the duty to prove the stability of their bridge stock. Verification of bridge stability will be realized with consideration of the newly increased traffic loads. Particularly in older bridges, the verification can only be achieved if calculative surplus load capacity of the original structural design is taken into account in the recalculation. One option for considering these reserves is the exact determination of the dead weight of the bridge. Within this case study, it will be demonstrated how the problem can be practically solved.
In order to determine the dead weight of a concrete bridge, its volume has to be calculated. as a first step, a 3D laser scanner is used to record the internal geometry of a hollow box bridge girder. For the determination of the thickness of the concrete member, the non-destructive technique ultrasonic echo is applied. The construction must be segmented in approximately equidistant parts in order to be able to carry out an economic and efficient investigation. The description of the segmentation of the point cloud, carried out in a 2D model, was presented in the first part of the publication. The subject of this presentation is the merging of 2D cross sections into a 3D model, from which the weight of the bridge can be calculated.
With the mandatory introduction of the May 2011 directive for reassessment of bridges in Germany, the administrations of the federal and state governments have the duty to prove the stability of their bridge stock. Verification of bridge stability will be realized with consideration of the newly increased traffic loads. Particularly in older bridges, the verification can only be achieved if calculative surplus load capacity of the original structural design is taken into account in the recalculation. One option for considering these reserves is the exact determination of the dead weight of the bridge. Within this case study, it will be demonstrated how the problem can be practically solved.
In order to determine the dead weight of a concrete bridge, its volume has to be calculated. as a first step, a 3D laser scanner is used to record the internal geometry of a hollow box bridge girder. For the determination of the thickness of the concrete member, the non-destructive technique ultrasonic echo is applied. The construction must be segmented in approximately equidistant parts in order to be able to carry out an economic and efficient investigation. The description of the segmentation of the point cloud, carried out in a 2D model, was presented in the first part of the publication. The subject of this presentation is the merging of 2D cross sections into a 3D model, from which the weight of the bridge can be calculated.
Der Schutz und die Instandsetzung von Betonbauteilen haben im Bereich von Parkhäusern aufgrund der dort herrschenden Beanspruchungen eine besondere Bedeutung. Wichtigste Voraussetzung für die sachkundige Planung von Instandsetzungsmaßnahmen ist die Ist-Zustandserfassung der betroffenen Betonbauteile. Diese wird üblicherweise mittels einer Kombination aus zerstörungsfreien und zerstörungsarmen Prüfverfahren durchgeführt. Welche Verfahren und Verfahrenskombinationen sind für eine Ist-Zustandserfassung von Betonbauteilen geeignet und haben sich in der Praxis bewährt? Was ist bei ihrer Durchführung zu beachten und wie sind die Prüfergebnisse zu beurteilen?
In der aktuellen Projektphase liegt der Fokus auf der Datenaufnahme, -bearbeitung und -speiche-rung mit dem Ziel, automatisierte Auswerteverfahren einsetzen zu können. Aktuell wurden primär punktuelle Messungen an ausgewählten Messtagen aufgenommen. Die Systeme sollen so weiter-entwickelt werden, dass sie sich auch für kontinuierliche Messungen im Rahmen von Monitoring-aufgaben eignen.
Ein wichtiger Fokus bei der Auswertung ist die Kombination mit numerischen Modellen, die mithilfe von Bayesian Update Verfahren und den aufgenommenen Messdaten kalibriert und im Verlauf der Monitoringaufgabe angepasst werden sollen. Insbesondere sollen auch zeitabhängige Modelle, die eine zeitliche Entwicklung von Struktureigenschaften beinhalten (Kriechen, Schwinden, Ermüdung, Korrosion) dazu verwendet werden, die zukünftige Performance der Struktur bewerten zu können. Basierend darauf werden dann Konzepte zur Planung von Inspektion und Wartung erstellt.