Filtern
Dokumenttyp
- Beitrag zu einem Tagungsband (8) (entfernen)
Referierte Publikation
- ja (8) (entfernen)
Schlagworte
- Automated operational modal analysis (1)
- Bauwerksüberwachung (1)
- Bridge resistance model (1)
- Condition monitoring (1)
- Continuous dynamic monitoring (1)
- Cost (1)
- Cost benefit analysis (1)
- Lebensdauerverlängerung (1)
- Life cycle (1)
- Life cycle extension (1)
- Measurement uncertainty (1)
- Messunsicherheit (1)
- Offshore wind (1)
- Offshore wind turbine (1)
- Operation (1)
- Operation management (1)
- Probabilistic decision analysis (1)
- Proof load testing (1)
- Resonance (1)
- Risk (1)
- Structural integrity management (1)
- Structural monitoring (1)
- Structural reliability (1)
- Tower-nacelle system (1)
- Tragwerkszuverlässigkeit (1)
- Wind turbine (1)
Organisationseinheit der BAM
The fatigue deterioration modeling for welded steel structures subjected to high cycle fatigue is presented in the current document. The aim of this paper is to formulate approaches based on actual Research results for the phases fatigue crack initiation, fatigue propagation and fatigue failure. The physical characteristics of the approaches are discussed in combination with the associated uncertainties and the probabilistic modeling of this time variant reliability problem. The fatigue deterioration modeling documented here serve as a basis for a reliability-based approach to inspection planning.
A reliability-based approach to inspection planning for welded steel structures subjected to high cycle fatigue is presented in the current document. Inspections are an effective means to control the Progress of fatigue deterioration and the presented approach allows to determine the minimum required inspection effort so that the considered structure complies with the given risk acceptance criteria in terms of target reliability throughout its service life.
Risikobasierte Überwachungsverfahren zur Lebensdauerverlängerung von bestehenden und neuen Bauwerken
(2011)
Diese Veröffentlichung enthält Konzepte zur Lebensdauerverlängerung von Bauwerken auf der Grundlage der Tragwerkszuverlässigkeitstheorie. Es werden aktuelle Forschungsergebnisse aus nationalen und europäischen Forschungsvorhaben vorgestellt. Den Schwerpunkt bildet die Verwendung von Bauwerksüberwachungsdaten unter Berücksichtigung von Messunsicherheiten zur Bestimmung der Tragwerkszuverlässigkeit. Dazu wird ein neuer Ansatz zur Bestimmung der A-posteriori Messunsicherheit vorgestellt. Es wird gezeigt, aufgrund welcher Eigenschaften der verwendeten probabilistischen Modelle die Zuverlässigkeit im Grenzzustand der Ermüdung in Bezug auf eine Lebensdauerverlängerung beeinflusst werden kann.
A prototype of wind turbines in 5 megawatt dass was built and tested at the first German offshore wind energy test fteld in the North Sea. In order to investigate dynamic behaviors under a complex state of loads, a continuous dynamic monitoring System was implemented by Federal Institute for Material Research and Testing (BAM). It recorded structural responses and environmental/operational variables from November 2007 to October 2009.
This paper presents significant resonance phenomenon due to the interaction in the tower-nacelle System under operational conditions. Modal parameters are automatically estimated by the poly reference Least Square Complex Frequency domain (p-LSCF) method. Campbell plot demonstrates that a three-blade passage frequency and its multiples f3n match with the natural frequencies of the wind turbine System in several modal Orders. The damping estimates decrease and the Vibration amplitude increase significantly. A control System is necessary to minimize the excessive vibrations.
Proof load testing may be performed to confirm the reliability of the bridge for an existing classification or to prove the reliability for a higher classification. In this paper, a probabilistic decision analysis approach is applied to the scenario for the evaluation of target proof load in the situation where information on the bridge resistance model is lacking. In this case, the resistance model is established by proof loading and taking very basic prior knowledge into account. The decision scenario is modelled in the context of the proof load test planner who shall choose the required load level for assessment of a bridge. The choice of the load level depends on the risks due to the testing and the expected benefit gain from the test. Information acquired about the loading response from monitoring during the proof load testing is modelled by taking basis in the model uncertainty formulation. The optimal proof load level for classification of a single lane, simply supported bridge of 8m span subjected to live load from very heavy (gross weight > 80 tons) transport vehicles was calculated. The optimal proof load level was identified as leading to a positive expected benefit gain to the decision maker while also satisfying target reliability criteria for remaining service life. The analysis was performed for the evaluation of bridge performance with respect to five classifications of very heavy transport vehicles with different vehicle weights and configurations.