Filtern
Erscheinungsjahr
Dokumenttyp
- Beitrag zu einem Tagungsband (29)
- Zeitschriftenartikel (19)
- Beitrag zu einem Sammelband (2)
- Buchkapitel (1)
- Corrigendum (1)
- Dissertation (1)
Sprache
- Englisch (53) (entfernen)
Schlagworte
Organisationseinheit der BAM
Paper des Monats
- ja (1)
To ensure a high operational reliability of future generations of offshore wind conversion systems (OWEC) with economically acceptable repair and maintenance efforts, comprehensive diagnosis and supervision concepts are required. Automatic monitoring systems will be an essential part of such concepts. Because of the fact, that during operation there will be static and dynamic interaction between the components 'structure', 'machinery' and 'blades' it is necessary to develop the monitoring techniques in an overall concept. These monitoring systems are supposed to be applied for the design and testing as well as for the operation and maintenance phases. The used methods are focused on the design requirements for the structure, which are stated in the respective standards and certification guidelines. For the validation of the design, methods are specified which would be also applicable for SHM in the operating condition, e.g. for the evaluation of the structural conditon possibly after the occurrence of damages or changes. The further task consists in the realization of condition monitoring for all components, aiming at early damage detection and the observation of the damage development and its evaluation. Here the task consists of determining with assessment procedures the optimum time for maintenance actions to be carried out.
Wind turbines on offshore sites (OWECs) are subjected to combined loads from wind and waves. These dynamic loads, with a frequency content within the range of the natural frequencies of the structures, cause fatigue-effective stresses in the substructures of wind turbines. Therefore, the examination of natural frequencies is an important part within the design process of wind turbines. The quality of the numerical models for such calculations is of great importance, since the certification guidelines permit only small uncertainties in modal analysis results. The accuracy of the parameters of the numerical model can only be achieved through a comparison of simulation results with corresponding test results. Therefore, it is necessary to measure the dynamic behaviour of all components of the wind turbines simultaneously. This is true not only for the design verification, but also for monitoring the OWECs in operation. The potential of integrated systems for monitoring-based maintenance optimisation should thus be used.
Structural health monitoring of wind turbine blades by strain measurement and vibration analysis
(2011)
Wind turbine blades have to withstand a high number of load cycles in mostly hard weather conditions over 20 years. In a research project BAM and several partners have designed, evaluated and tested a condition monitoring system for all parts of a wind turbine. At a rotorblade with a length of 58 m fibre bragg grating sensors were applied for in-service strain measurement. Additionally a complex test rig was designed to enable real biaxial loading conditions at a representative test rotor blade to simulate the mechanical loading conditions in the lab. In this test blade with a length of 8 m also fibre bragg grating sensors were implemented to determine their influences for the structure and the condition monitoring system. Vibration measurements were carried out at different test phases. The results were compared with finite element strain and modal analysis.
The concept and technical details of the implementation of the developed integrated monitoring system within the IMO-WIND project are presented. The tasks of the components of the system and its requirements are described. Selected results from the continuous monitoring during operation of the plant M5000_2 regarding the task design verification and dynamic structural analysis are given.
This paper describes a structural reliability analysis utilizing monitoring data in the ultimate limit state with consideration of the uncertainties of the monitoring procedure. For this purpose the uncertainties of the monitoring data are modeled utilizing a new framework for the determination of measurement uncertainties. The approach is based on a process equation and Statistical models of observations for the derivation of a posterior measurement uncertainty by Bayesian updating. This facilitates the quantification of a measurement uncertainty using all available data of the measurement process. For the reliability analysis in the ultimate limit state, monitoring data can be utilized as a loading model Information and as proof loading, i.e. resistance model Information. Both approaches are discussed with generic examples and it is shown that the modeling of monitoring data in a reliability analysis can result in a reduction of uncertainties and as a consequence in the reduction of the probability of failure. Furthermore, the proof loading concept is developed further to account for the uncertain characteristic of proof loading due to the measurement uncertainties which is consistent with the framework for the determination of measurement uncertainties. These approaches and findings can be utilized for the assessment of structures for life cycle extension and the design of monitoring Systems.
To ensure a high operational reliability of offshore wind turbines (OWEC) with economically acceptable repair and maintenance efforts, comprehensive diagnosis and supervision concepts are required. Automatic monitoring Systems will be an essential part of such concepts. Because of the fact, that during Operation there will be static and dynamic interaction between the components ‘structure’, ‘machinery’ and ‘blades’ it is necessary to develop the monitoring techniques in an overall concept. These monitoring Systems are supposed to be applied for the design and testing as well as for the Operation and maintenance phases. The knowledge of the dynamic behavior of wind turbines is important both for the design and for a safe Operation. The available monitoring data from a period of three years, allow first conclusions on the long-term Operation of such Systems in terms of quality requirements to the instrumentation to the structure and the rotor blades
This paper establishes the model basis regarding the ultimate limit state consisting of structural, loading, and probabilistic models of the support structure of offshore wind energy converters together with a sensitivity study. The model basis is part of a risk based assessment and monitoring framework and will be applied for establishing the 'as designed and constructed' reliability as prior information for the assessment and as a basis for designing a monitoring system. The model basis is derived considering the constitutive physical equations and the methodology of solving these which then in combination with the ultimate limit state requirements leads to the specific constitutive relations. As a result finite element models based on shell elements incorporating a structural and a loading model are introduced and described in detail. Applying these models the ultimate capacity of the support structure and the tripod structure are determined with a geometrically and materially nonlinear finite element analysis. The observed failure mechanisms are the basis for the definition of the ultimate limit state responses. A probabilistic model accounting for the uncertainties involved is derived on the basis of literature review and measurement data from a prototype Multibrid M5000 support structure. In combination with the developed structural and loading models, sensitivity analyses in regard to the responses are performed to enhance the understanding and to refine the developed models. To this end, as the developed models necessitate substantial numerical efforts for the probabilistic response analysis predetermined designs of numerical experiments are applied for the calculation of the sensitivities using the Spearman rank correlation coefficient. With this quantification of the sensitivity of the random variables on the responses including nonlinearity the refinement of the model is performed on a quantitative basis.
The fatigue deterioration modeling for welded steel structures subjected to high cycle fatigue is presented in the current document. The aim of this paper is to formulate approaches based on actual Research results for the phases fatigue crack initiation, fatigue propagation and fatigue failure. The physical characteristics of the approaches are discussed in combination with the associated uncertainties and the probabilistic modeling of this time variant reliability problem. The fatigue deterioration modeling documented here serve as a basis for a reliability-based approach to inspection planning.
A reliability-based approach to inspection planning for welded steel structures subjected to high cycle fatigue is presented in the current document. Inspections are an effective means to control the Progress of fatigue deterioration and the presented approach allows to determine the minimum required inspection effort so that the considered structure complies with the given risk acceptance criteria in terms of target reliability throughout its service life.
Fatigue and serviceability limit state model basis for assessment of offshore wind energy converters
(2012)
This paper develops the models for the structural performance of the loading and probabilistic characterization for the fatigue and the serviceability limit states for the support structure of offshore wind energy converters. These models and a sensitivity study are part of a risk based assessment and monitoring framework and will be applied for establishing the 'as designed and constructed' reliability as prior information for the assessment and the design of monitoring systems. The constitutive physical equations are introduced in combination with the fatigue and serviceability limit state requirements as the starting point for the development of the structural performance and loading models. With these models introduced in detail, several modeling aspects for both limit states are analyzed. This includes analyses of the influence on the hot spot stresses by applying a contact formulation for the pile guide brace connection and the application of a finite element formulation using solid elements. Further, the comparison of the natural frequencies of a discrete rotor model with a continuous rotor model is documented. To account for uncertainties associated with the structural and loading models, a probabilistic model is derived on the basis of literature review and measurement data from a prototype Multibrid M5000 support structure. The sensitivity study is based on the calculation of a nonlinear coefficient of correlation in conjunction with predetermined designs of experiments. This is conducted by a systematic analysis of the influence of the random variables on limit state responses and hence on the structural reliability. Integrating the analyses and sensitivity studies of the fatigue and serviceability limit state models developed in this paper as well as the ultimate limit state models in Thöns et al. ('Ultimate Limit State Model Basis for Assessment of Offshore Wind Energy Converters,' ASME J. Offshore Mech. Arct. Eng.), the model basis for the assessment is completed. The process of establishing and analyzing such a model basis contributes to a detailed understanding of the deterministic and probabilistic characteristics of the structure and provides valuable insights in regard to the significance of available data.
Structural Health Monitoring (SHM) systems are designed for assisting owners and operators with information and forecasts concerning the fitness for purpose of structures and building systems. The benefit associated with the implementation of SHM may in some cases be intuitively anticipated or proven by past experiences but in general there appears to be no rational or systematic approach for assessing the value of SHM systems a-priory to their implementation. The present paper addresses the assessment of the value of SHM with basis in structural risk assessments and the Bayesian pre-posterior decision analysis. The quantification of the value of SHM builds upon the quantification of the value of information (VoI) or rather the benefit of monitoring. The suggested approach involves a probabilistic representation of the loads and environmental conditions acting on structures as well as their responses and performances over their life-cycle. In addition, the quality of monitoring and the performance of possible remedial actions triggered by monitoring results are modeled probabilistically.The consequences accounted for, in principle include all consequences associated with the performance of the structure over its life-cycle as well as the costs associated with monitoring and possible remedial actions. The suggested approach is illustrated through two case studies concerning the monitoring of welded details in steel structures subjected to fatigue loading. The case studies address the effect of the uncertainty associated with the performance of SHM on the value of SHM. Moreover, in order to illustrate the potential of the application of approach for monitoring of structural systems an optimal strategy for SHM is determined for a system comprised of three welded details.
Inspections are an efficient means of enhancing the reliability of redundant structural Systems subjected to fatigue. To investigate the effect of such inspections, we represent the deterioration state of a Daniels System by means of a probabilistic fatigue crack growth model of all elements, which considers stochastic dependence among element fatigue behavior. We include inspection results in the calculation of the System collapse probability through Bayesian updating of the System deterioration state. Based on this approach, we calculate the collapse probability of a deteriorating Daniels System conditional on different inspection strategies in terms of inspection coverage and inspection times. The acceptability of an inspection strategy is verified by comparing the calculated collapse probabilities with maximum acceptable System failure probabilities. This study is a Step towards identifying optimal inspection strategies for redundant structural Systems subjected to fatigue.