Filtern
Dokumenttyp
- Beitrag zu einem Tagungsband (6)
- Zeitschriftenartikel (3)
- Corrigendum (1)
- Forschungsbericht (1)
Schlagworte
- Deterioration (2)
- Fatigue (2)
- Inspection (2)
- Structural reliability (2)
- Value of information (2)
- Bayesian analysis (1)
- Bayesian updating of measurement uncertainties (1)
- Berechnung (1)
- Brücke (1)
- Daniels systems (1)
- Dauerhaftigkeit (1)
- Decision theory (1)
- Deutschland (1)
- Echtzeit (1)
- Forschungsbericht (1)
- Fracture mechanics (1)
- Inspection planning (1)
- Integrity management (1)
- Kontinuierlich (1)
- Kontrolle (1)
- Levelized cost of energy (1)
- Messung (1)
- Monitoring (1)
- Predictive maintenance (1)
- Prognose (1)
- Prüfverfahren (1)
- Rechenmodell (1)
- Reconstruction of stress resultants (1)
- Reliability (1)
- Sachschaden (1)
- Sensitivity analysis (1)
- Service life performance (1)
- Strain measurements (1)
- Structural integrity management (1)
- Structural performance (1)
- Subset simulation (1)
- Tragfähigkeit (1)
- Wahrscheinlichkeit (1)
- Wind turbine support structure (1)
- Zustandsbewertung (1)
Organisationseinheit der BAM
Der vorliegende Bericht beschreibt Konzepte für eine intelligente Brücke auf der Grundlage einer zuverlässigkeitsbasierten Zustandsbewertung unter Berücksichtigung von Bauwerksinformationen, welche aus Prüfungen, Inspektionen und Überwachung gewonnen werden. Das Brückensystem wird durch ein Modell beschrieben, welches den zentralen Teil des Konzeptes darstellt. Das Modell wird in Schädigungsmodelle und ein Tragwerkssystem-Modell unterteilt. Dieses Modell wird a-priori durch die Eingangsdaten (welche etwa die Geometrie, die Materialien und die Verwendung der Brücke beschreiben) charakterisiert. Aus diesen ergeben sich dann auch die Ausgangsmodelle. Um die signifikanten Streuungen und Unsicherheiten adäquat abzubilden sind diese Modelle probabilistisch. Das Modell liefert eine sich kontinuierlich ändernde probabilistische Zustandsbewertung. Die Zustandsbewertung gibt eine Aussage über den Zustand und die Zuverlässigkeit des Brückensystems und seiner Bauteile und dient als Grundlage für die Planung und die Optimierung von Maßnahmen. Die Verwendung von Resultaten aus Inspektionen, Prüfungen und Überwachungen erfolgt durch eine Aktualisierung der Modellparameter. Die Aktualisierung beruht auf der Methode der Bayes'schen Aktualisierung und wird auf der Grundlage der entwickelten Klassifizierung der Bauwerksinformationen mit entsprechenden Methoden durchgeführt. Dieses Verfahren erlaubt es, alle Informationen in konsistenter Weise in ein einziges Modell einfließen zu lassen. Dabei wird die Genauigkeit und Aussagekraft der gewonnenen Daten und Beobachtungen explizit berücksichtigt. Durch die Aktualisierung der Modellparameter unter Berücksichtigung von Systemeffekten wird die Zustandsbewertung der Bauteile und des Brückensystems aktualisiert. Das ermöglicht die Planung und die Optimierung von Maßnahmen unter Berücksichtigung der Bauwerksinformationen. Auf diese Weise wird die intelligente Brücke mit Inspektionen und Überwachungen zu einem adaptiven System, welches sich Veränderungen anpassen kann.---------------------------------------------------------------------------------------------------------------------------------------------------------------------------This report describes concepts for an intelligent bridge on the basis of a reliability-based condition assessment utilizing inspection and monitoring data. The central part of the concept is a model describing the bridge system. The overall bridge model is comprised of deterioration models and a mechanical system model of the structure. The model is a-priori characterized by the input data (such as the geometry, the materials, and the utilization of the bridge). Significant uncertainties in the deterioration modeling as well as the load conditions motivate a probabilistic modeling. The model enables a continuously updated probabilistic condition assessment. It provides information about the condition and the reliability of the bridge system and its components and serves as a basis for the planning and the optimization of maintenance actions. Inspection, measurement, and monitoring information are included by updating the model parameters. Bayesian updating is utilized for the updating of the model parameters and is performed on the basis of the developed classification of structural information and the corresponding procedures. These methodologies allow to consistently incorporate all available information into the model and the prediction. Thereby, the precision and the validity of the data and observations are explicitly accounted for. The condition assessment of the bridge system and its components is updated by updating the model parameters, and maintenance actions can be planned and optimized taking into account all available information in a rational and consistent manner. In this way, the intelligent bridge with inspections, measurements, and monitoring information becomes an adaptive system, which has the ability to adjust to changes.
A novel method for risk-based optimization of inspection and repair strategies for deteriorating structural systems has recently been proposed. The method defines heuristics at the system level to reduce the number of possible strategies. For each defined strategy, it computes the updated system failure probability conditional on simulated inspection and repair histories, and evaluates the associated costs and risk. The expected total service life costs and risk for a strategy are finally determined using Monte Carlo simulation. The optimal strategy minimizes the expected total service life costs and risk. We intend to adopt this approach to optimize inspection, monitoring and repair activities for offshore wind park support structures. As a first step, we simulate – in analogy to an offshore wind park – the service life performance of an inspected group of jacket-type frames. The performance is quantified in terms of the group’s system failure probability conditional on simulated inspection and repair histories. The underlying system model accounts for the structural redundancy of the frames and the interdependence among their failure events due to similar loading conditions. The model also captures stochastic dependence among the deterioration states of the frames. As part of the simulation process the a-priori unknown outcome of any planned inspection is generated conditional on the outcome of all previous inspections.
The fatigue deterioration modeling for welded steel structures subjected to high cycle fatigue is presented in the current document. The aim of this paper is to formulate approaches based on actual Research results for the phases fatigue crack initiation, fatigue propagation and fatigue failure. The physical characteristics of the approaches are discussed in combination with the associated uncertainties and the probabilistic modeling of this time variant reliability problem. The fatigue deterioration modeling documented here serve as a basis for a reliability-based approach to inspection planning.
A reliability-based approach to inspection planning for welded steel structures subjected to high cycle fatigue is presented in the current document. Inspections are an effective means to control the Progress of fatigue deterioration and the presented approach allows to determine the minimum required inspection effort so that the considered structure complies with the given risk acceptance criteria in terms of target reliability throughout its service life.
Inspections are an efficient means of enhancing the reliability of redundant structural Systems subjected to fatigue. To investigate the effect of such inspections, we represent the deterioration state of a Daniels System by means of a probabilistic fatigue crack growth model of all elements, which considers stochastic dependence among element fatigue behavior. We include inspection results in the calculation of the System collapse probability through Bayesian updating of the System deterioration state. Based on this approach, we calculate the collapse probability of a deteriorating Daniels System conditional on different inspection strategies in terms of inspection coverage and inspection times. The acceptability of an inspection strategy is verified by comparing the calculated collapse probabilities with maximum acceptable System failure probabilities. This study is a Step towards identifying optimal inspection strategies for redundant structural Systems subjected to fatigue.
The Influence of brittle Daniels system characteristics on the value of load monitoring information
(2016)
This paper addresses the influence of deteriorating brittle Daniels system characteristics on the value of structural health monitoring (SHM). The value of SHM is quantified as the difference between the life cycle benefits with and without SHM. A value of SHM analysis is performed within the framework of the Bayesian pre-posterior decision theory and requires (1) structural performance modelling and prediction, (2) structural integrity management models, (3) the (pre-posterior) modelling of SHM and (4) the coupling of SHM and the structural performance models. The pre-posterior decision theoretical framework facilitates that the value of SHM can be quantified before the SHM system is quantified and before data are acquired. The results of this study support decisions to select structural systems for which the SHM strategy load monitoring is optimal.
An efficient approach to reliability analysis of deteriorating structural systems is presented, which considers stochastic dependence among element deterioration. Information on a deteriorating structure obtained through inspection or monitoring is included in the reliability assessment through Bayesian updating of the system deterioration model. The updated system reliability is then obtained through coupling the updated deterioration model with a probabilistic structural model. The underlying high-dimensional structural reliability problems are solved using subset simulation, which is an efficient and robust sampling-based algorithm suitable for such analyses. The approach is demonstrated in two case studies considering a steel frame structure and a Daniels system subjected to high-cycle fatigue.
Predictive information and maintenance optimization for deteriorating structures is concerned with scheduling (a) the collection of information by inspection and monitoring and (b) maintenance actions such as repair, replacement, and retrofitting based on updated predictions of the future condition of the structural system. In this article, we consider the problem of jointly identifying—at the beginning of the service life—the optimal inspection time and repair strategy for a generic welded joint in a generic offshore wind turbine structure subject to fatigue. The optimization is performed based on different types of decision analyses including value of information analyses to quantify the expected service life cost encompassing inspection, repair, and fatigue damage for all relevant combinations of inspection time, repair method, and repair time. Based on the analysis of the expected service life cost, the optimal inspection time, repair method, and repair time are identified. Possible repair methods for a welded joint in an offshore environment include welding and grinding, for which detailed models are formulated and utilized to update the joint’s fatigue performance. The decision analyses reveal that an inspection should be scheduled approximately at mid-service life of the welded joint. A repair should be performed in the same year after an indication and measurement of a fatigue crack given an optimal inspection scheduling. This article concludes with a discussion on the results obtained from the decision and value of information analyses.
Support structures of offshore wind turbines are subject to cyclic stresses generated by different time-variant random loadings such as wind, waves, and currents in combinationwith the excitation by the rotor. In the design phase, the cyclic demand on wind turbine support structure is calculated and forecasted with semi or fully probabilistic engineering models. In some cases, additional cyclic stresses may be induced by construction deviations, unbalanced rotor masses and structural dynamic phenomena such as, for example, the Sommerfeld effect. Both, the significant uncertainties in the design and a validation of absence of unforeseen adverse dynamic phenomena necessitate the employment of measurement Systems on the support structures. The quality of the measurements of the cyclic demand on the support structures depends on (a) the precision of the measurement System consisting of sensors, amplifier and data normalization and (b) algorithms for analyzing and converting data to structural health information. This paper presents the probabilistic modelling and analysis of uncertainties in strain measurements performed for the purposes of reconstructing stress resultants in wind turbine towers.
It is shown how the uncertainties in the strain measurements affect the uncertainty in the individual components of the reconstructed forces and moments. The analysis identifies the components of the vector of stress resultants that can be reconstructed with sufficient precision.
The levelized cost of energy (LCoE) is an important measure to quantify the macro-economic efficiency of an offshore wind farm and to enable a quantitative comparison with other types of energy production. The costs of the structural integrity management - which is required to ensure an adequate lifetime reliability of the turbine support structures - are part of the operational expenditures of an offshore wind farm. An optimization of the structural integrity management may reduce the operational expenditures and consequently the LCoE. However, the effect of the structural integrity management on the LCoE is hardly known. To investigate this effect, this paper presents a sensitivity analysis of the LCoE of a generic offshore wind farm. The probabilistic models of the parameters influencing the LCoE are based on a literature study including an explicit model for the structural integrity management.
The analysis reveals that LCoE may potentially be reduced if an optimization of the structural integrity management enables a service life extension.