Wind turbines on offshore sites (OWECs) are subjected to combined loads from wind and waves. These dynamic loads, with a frequency content within the range of the natural frequencies of the structures, cause fatigue-effective stresses in the substructures of wind turbines. Therefore, the examination of natural frequencies is an important part within the design process of wind turbines. The quality of the numerical models for such calculations is of great importance, since the certification guidelines permit only small uncertainties in modal analysis results. The accuracy of the parameters of the numerical model can only be achieved through a comparison of simulation results with corresponding test results. Therefore, it is necessary to measure the dynamic behaviour of all components of the wind turbines simultaneously. This is true not only for the design verification, but also for monitoring the OWECs in operation. The potential of integrated systems for monitoring-based maintenance optimisation should thus be used.
To ensure a high operational reliability of offshore wind turbines (OWEC) with economically acceptable repair and maintenance efforts, comprehensive diagnosis and supervision concepts are required. Automatic monitoring Systems will be an essential part of such concepts. Because of the fact, that during Operation there will be static and dynamic interaction between the components ‘structure’, ‘machinery’ and ‘blades’ it is necessary to develop the monitoring techniques in an overall concept. These monitoring Systems are supposed to be applied for the design and testing as well as for the Operation and maintenance phases. The knowledge of the dynamic behavior of wind turbines is important both for the design and for a safe Operation. The available monitoring data from a period of three years, allow first conclusions on the long-term Operation of such Systems in terms of quality requirements to the instrumentation to the structure and the rotor blades
The concept and technical details of the implementation of the developed integrated monitoring system within the IMO-WIND project are presented. The tasks of the components of the system and its requirements are described. Selected results from the continuous monitoring during operation of the plant M5000_2 regarding the task design verification and dynamic structural analysis are given.