Filtern
Dokumenttyp
- Zeitschriftenartikel (3) (entfernen)
Sprache
- Englisch (3)
Referierte Publikation
- ja (3)
Schlagworte
- Structural reliability (3) (entfernen)
Organisationseinheit der BAM
Predictive information and maintenance optimization for deteriorating structures is concerned with scheduling (a) the collection of information by inspection and monitoring and (b) maintenance actions such as repair, replacement, and retrofitting based on updated predictions of the future condition of the structural system. In this article, we consider the problem of jointly identifying—at the beginning of the service life—the optimal inspection time and repair strategy for a generic welded joint in a generic offshore wind turbine structure subject to fatigue. The optimization is performed based on different types of decision analyses including value of information analyses to quantify the expected service life cost encompassing inspection, repair, and fatigue damage for all relevant combinations of inspection time, repair method, and repair time. Based on the analysis of the expected service life cost, the optimal inspection time, repair method, and repair time are identified. Possible repair methods for a welded joint in an offshore environment include welding and grinding, for which detailed models are formulated and utilized to update the joint’s fatigue performance. The decision analyses reveal that an inspection should be scheduled approximately at mid-service life of the welded joint. A repair should be performed in the same year after an indication and measurement of a fatigue crack given an optimal inspection scheduling. This article concludes with a discussion on the results obtained from the decision and value of information analyses.
An efficient approach to reliability analysis of deteriorating structural systems is presented, which considers stochastic dependence among element deterioration. Information on a deteriorating structure obtained through inspection or monitoring is included in the reliability assessment through Bayesian updating of the system deterioration model. The updated system reliability is then obtained through coupling the updated deterioration model with a probabilistic structural model. The underlying high-dimensional structural reliability problems are solved using subset simulation, which is an efficient and robust sampling-based algorithm suitable for such analyses. The approach is demonstrated in two case studies considering a steel frame structure and a Daniels system subjected to high-cycle fatigue.
Inspection and maintenance of concrete bridges is a major cost factor in transportation infrastructure, and there is significant potential for using information gained during inspection to update predictive models of the performance and reliability of such structures. In this context, this paper presents an approach for assessing and updating the reliability of prestressed concrete bridges subjected to chloride-induced reinforcement corrosion. The system deterioration state is determined based on a Dynamic Bayesian Network (DBN) model that considers the spatial variability of the corrosion process. The overall system reliability is computed by means of a probabilistic structural model coupled with the deterioration model. Inspection data are included in the system reliability calculation through Bayesian updating on the basis of the DBN model. As proof of concept, a software prototype is developed to implement the method presented here. The software prototype is applied to a typical highway bridge and the influence of inspection information on the system deterioration state and the structural reliability is quantified taking into account the spatial correlation of the corrosion process. This work is a step towards developing a software tool that can be used by engineering practitioners to perform reliability assessments of ageing concrete bridges and update their reliability with inspection and monitoring data.