Filtern
Erscheinungsjahr
- 2019 (6) (entfernen)
Dokumenttyp
Sprache
- Englisch (6)
Schlagworte
- SHM information (2)
- Value of information (2)
- Blade (1)
- Damage detection (1)
- Fatigue safety (1)
- Icing conditions (1)
- Monitoring information (1)
- Offshore wind turbines (1)
- Orthotropic steel bridge deck (1)
- Posterior utilities (1)
Organisationseinheit der BAM
Fatigue safety verification of existing bridges that uses ‘‘re-calculation’’ based on codes, usually results in insufficient fatigue safety, triggering invasive interventions. Instead of “re-calculation”, Structural Health Monitoring (SHM) should be used for the assessment of the existing bridges. Monitoring systems provide data that can reduce uncertainties associated with the fatigue loading process and the structural resistance. The objective of this paper is to quantify the value of the SHM system implemented in a 60-years-old road viaduct to investigate its fatigue safety, through modeling of the fundamental decisions of performing monitoring in conjunction with its expected utility. The quantification of the conditional value of information is based on the decision tree analysis that considers the structural reliability, various decision scenarios as well as the cost-benefit assessments. This leads to a quantitative decision basis for the owner about how much time and money can be saved while the viaduct fulfills its function reliably and respects the safety requirements. The originality of this paper stands in the application of the value of information theory to an existing viaduct considering the fatigue failure of the system based on the monitoring data and the cost-benefit of monitoring method.
Quantification of the posterior utilities of SHM campaigns on an orthotropic steel bridge deck
(2019)
This paper contains a quantification and decision theoretical optimization of the posterior utilities for several options for monitoring campaigns on the particular case of fatigue life predictions of an orthotropic steel deck. The monitoring campaigns are defined by varying monitoring durations and phases. The decision analysis is performed with real data from the Structural Health Monitoring (SHM) of the Great Belt Bridge (Denmark) which, among others, consist of measured strains, pavement temperatures and traffic intensities. The fatigue loading prediction model is based on regression models linking daily averaged pavement temperatures, daily aggregated heavy-traffic Counts and derived S-N fatigue damages, all of them derived from the outcomes of different monitoring campaigns. A probabilistic methodology is utilized to calculate the fatigue reliability profiles of selected instrumented welded joints. The posterior utilities of SHM campaigns are then quantified by considering the structural fatigue reliability, various monitoring campaigns and the corresponding cost-benefit models. The decisions of identifying the optimal monitoring campaign and of extending the service life or not in conjunction with monitoring results are modelled. The optimal monitoring campaign is identified - retrospectively - by maximizing the expected benefits and minimize risks in dependency of the monitoring duration and the monitoring associated costs. The results, despite relying on a number of simplistic assumptions, pave the way towards the use of pre-posterior decision support to optimise the design of monitoring campaigns for similar bridges, with an overall goal to proof the cost efficiency of SHM approaches to civil infrastructure management.
Applications of Structural Health Monitoring (SHM) for the design and analysis of Offshore Wind Turbine (OWT) structures has gained much attention within the past few years. Being exposed to repeated cyclic wind and wave loads, OWTs are dynamically sensitive structures and can benefit from monitoring systems to predict time-dependent deterioration. This study focuses on the quantification of the value of SHM information on the maintenance of OWT structures, with emphasis on fatigue of welded joint. By utilizing the decision tree, structural reliability, SHM data, as well as the cost-benefit assessments, a value of information (VoI) analysis can be done to model the fundamental decision of whether the service life of an OWT foundation can be extended beyond the initial design life. The application is demonstrated on a butt weld of a monopile support structure of a 3 MW offshore wind turbine with a hub height of approximately 71m where the prior probability analysis is modelled as a probabilistic fatigue damage model based on S-N approach and designed wind data. The posterior probability of failure of welded joints is updated using the three-year measured oceanographic and one-year strain data. The expected value of SHM information can be found as the difference between the maximum utility obtained in posterior analysis with SHM information and the maximum utility obtained using only prior information. This work can provide insights on how much benefits can be achieved through SHM information, with practical relevance on reliability-based design optimization and fatigue life extension of OWT structures.
A method to determine the structural and damage detection system influencing parameters is proposed based on the value of information analysis. The value of information analysis utilizes the Bayesian pre-posterior decision theory to quantify the value of SHM for the structural integrity management during service life. First the influencing parameters of the structural system such as deterioration type and rate are introduced for the performance of the prior probabilistic system model. Then the damage detection system performance influencing parameters including number of sensors, sensor locations, measurement noise and the Type I error are investigated. The pre-posterior probabilistic model is computed utilizing the Bayes’ theorem to update the prior system model with the damage indication information. Finally, the value of information is quantified as the difference between the maximum utility obtained in pre-posterior and prior analysis based on the decision tree analysis, comprising structural probabilistic models, consequences as well as benefit and costs analysis associated with and without monitoring. With the developed approach, a case study on a statically determinate Pratt truss bridge girder is carried out to validate the method. The analysis shows that the higher the deterioration rate is, the more it is beneficial to do SHM. Furthermore, it shows that more sensors do not necessarily lead to a higher value of information; only specific sensor locations near the highest utilized components lead to a high value of information; measurement noise and the Type I error should be controlled and as small as possible. An optimal sensor employment with highest value of information is found. Moreover, it is found that the proposed method can be a powerful tool to develop optimal service life maintenance strategies - before implementation - for similar bridges and to optimize the damage detection system settings and sensor configuration for minimum expected costs and risks.
Quantification of the posterior utilities of SHM campaigns on an orthotropic steel bridge deck
(2019)
This paper contains a quantification and decision theoretical optimization of the posterior utilities for several options for monitoring campaigns on the particular case of fatigue life predictions of an orthotropic steel deck. The monitoring campaigns are defined by varying monitoring durations and phases. The decision analysis is performed with real data from the Structural Health Monitoring (SHM) of the Great Belt Bridge (Denmark) which, among others, consist of measured strains, pavement temperatures and traffic intensities. The fatigue loading prediction model is based on regression models linking daily averaged pavement temperatures, daily aggregated heavy-traffic Counts and derived S-N fatigue damages, all of them derived from the outcomes of different monitoring campaigns. A probabilistic methodology is utilized to calculate the fatigue reliability profiles of selected instrumented welded joints. The posterior utilities of SHM campaigns are then quantified by considering the structural fatigue reliability, various monitoring campaigns and the corresponding cost-benefit models. The decisions of identifying the optimal monitoring campaign and of extending the service life or not in conjunction with monitoring results are modelled. The optimal monitoring campaign is identified - retrospectively - by maximizing the expected benefits and minimize risks in dependency of the monitoring duration and the monitoring associated costs. The results, despite relying on a number of simplistic assumptions, pave the way towards the use of pre-posterior decision support to optimise the design of monitoring campaigns for similar bridges, with an overall goal to proof the cost efficiency of SHM approaches to civil infrastructure management.
Risk Assessment and Value of Action Analysis for Icing Conditions of Wind Turbines Close to Highways
(2019)
The paper presents research results from the Marie Skłodowska-Curie Innovative Training Network INFRASTAR in the field of reliability approaches for decision-making for wind turbines and bridges. This paper addresses the application of Bayesian decision analysis for installation of heating systems in wind turbine blades in cases where an ice detection system is already installed in order to allow wind turbines to be placed close to highways. Generally, application of ice detection and heating systems for wind turbines is very relevant in cases where the wind turbines are planned to be placed close to urban areas and highways, where risks need to be considered due to icing events, which may lead to consequences including human fatality, functional disruptions, and/or economic losses. The risk of people being killed in a car passing on highways near a wind turbine due to blades parts or ice pieces being thrown away in cases of overicing is considered in this paper. The probability of being killed per kilometer and per year is considered for three cases: blade parts thrown away as a result of a partial or total failure of a blade, ice thrown away in two cases, i.e., of stopped wind turbines and of wind turbines in operation. Risks due to blade parts being thrown away cannot be avoided, since low strengths of material, maintenance or manufacturing errors, mechanical or electrical failures may result in failure of a blade or blade part. The blade (parts) thrown away from wind turbines in operation imply possible consequences/fatalities for people near the wind turbines, including in areas close to highways.
Similar consequences are relevant for ice being thrown away from wind turbine blades during icing situations. In this paper, we examine the question as to whether it is valuable to put a heating System on the blades in addition to ice detection systems. This is especially interesting in countries with limited space for placing wind turbines; in addition, it is considered if higher power production can be obtained due to less downtime if a heating system is installed.