Filtern
Erscheinungsjahr
Dokumenttyp
- Vortrag (24) (entfernen)
Sprache
- Englisch (24) (entfernen)
Referierte Publikation
- nein (24)
Schlagworte
- Safety (7)
- Spent Fuel (5)
- Disposal (4)
- Radioactive waste (4)
- Storage (4)
- Metal seal (3)
- Nuclear waste management (3)
- Spent fuel (3)
- Container (2)
- Extended interim storage (2)
Organisationseinheit der BAM
Eingeladener Vortrag
- nein (24)
Ongoing R&D work at BAM
(2018)
The presentation provides an update on the German nuclear waste management policy towards final disposal and related reasearch at BAM. Topics include long term investigations of metal seals, investigations of fuel cladding failure mechanisms, and the development of requirements and concepts for high level radioactive waste and spent fuel disposal containers.
Perspectives on extending interim storage of spent nuclear fuel (beyond the initial license period)
(2017)
The presentation adddresses the consequences and challenges of the German nuclear phase-out in conjunction with the restart of siting process for a high-level radioactive waste repository. Concerning spent fuel this will lead to extended interim storage periods for the dry storage casks beyond the initial licensing period of 40 years.
For extending storage periods additional safety assessments and data about the long term performance of materials, components and casks will be needed and BAM has already been lauching specific R&D projects addressing identified data gaps.
This paper describes and discusses the major challenges of spent fuel management in Germany after the phase-out of nuclear electricity generation was decided in 2011 and a new repository siting procedure was implemented in 2013. Consequences from those decisions which were legally founded by amendments of the German Atomic Energy Act (AtG) result in the need to transfer all remaining spent fuel from limited reactor operation (last reactor shutdown until the end of 2022) into casks for subsequent dry interim storage on-site. Storage licenses are generally issued site-specific considering specific dual purpose casks (DPC) and their inventories and they are generally limited to 40 years so far. But the need for extending the interim storage period in the future has become obvious. Even though, this may not be an issue to be solved already today questions about additional safety demonstrations will arise as soon as licenses need to be extended. Certainly, these questions will ask for reliable data about the long term performance and safety of structures, systems, and components, e. g. the long term performance of cask components and materials like bolted closure systems including metal seals, or fuel rod behaviour concerning cladding materials under stress and temperature conditions. In case of dual purpose casks for storage and transportation this includes aspects on how to demonstrate transportability during or after several decades of interim storage. Long term investigations often require plenty of time and therefore need to be initiated timely.