Filtern
Erscheinungsjahr
Dokumenttyp
Sprache
- Englisch (17)
Schlagworte
- Sewage sludge (17) (entfernen)
Municipal sewage sludge is a carrier of nutrients most important phosphorus (P) but also contains organic pollutants and heavy metals. A two steps thermal treatment is suggested based on 1. mono-incineration of sewage sludge under destruction of organic pollutants and 2. thermochemical treatment of the resulting ashes to remove heavy metals and increase P-bioavailability. The targeted products are marketable P-fertilisers. The thermochemical treatment was investigated in a gas tight lab-scale rotary furnace. Seven sewage sludge ashes of different origin and composition and one residue from gasification of sewage sludge were mixed with a chlorine donor (e.g. MgCl2) and thermochemically treated under systematic variation of operational parameters. The distributions of the heavy metals between solid and gas phase were determined. The heavy metals concentrations of the treated ashes met the legislative limits in most cases. The products from thermochemical treatment are suited raw materials for P-fertiliser production. Relevant process parameters such as temperature, type and concentration of Cl-donor and retention time were optimised for the thermochemical treatment step.
Wastewater contains a diverse array of organic and inorganic compounds and its complex composition strongly depends on the location and the connected dischargers. However, municipal wastewater as a carrier of feces and urine generally contains considerable amounts of the main nutrients nitrogen and phosphorus. The latter is in the focus of the discussions about the recovery potential of wastewater due to the relatively high mass flows of phosphorus in wastewater and the finite nature and decreasing quality of phosphate rock reserves. But due to the presence of the whole periodic table of elements, wastewater might contain further valuable components of interest for recovery including those defined as critical raw materials by the European Commission. Phosphorus and most of the other critical raw materials are fixed in the sewage sludge and after incineration in the sewage sludge ash (SSA). This is accompanied by high concentration factors from wastewater via sludge to ash. However, the mass fractions of the majority of elements in sewage sludge are comparable to those of the earth crust, indicating no relative enrichment. Nevertheless, enrichment factors of 100 or higher are given for phosphorus, copper, zinc, cadmium, silver, tin, lead and the platinum group elements indicating an anthropogenic input. An economic value of sewage sludge was estimated to $460,-/t calculated on the basis of the respective market prices for high purity elements – a theoretical value. A German survey of sewage sludge ashes showed that the mass fractions and the mass flows of most of the elements present in SSA are probably too low for an economic recovery. In most cases the mass flows are rather small compared to the imports and the chemical forms are not suitable for recovery. An exception is phosphorus that is present in high mass fractions up to 13% and that bears a high substitution potential. If the application of P-recovery technologies lead to a further concentration of valuable elements e.g. as by-products in side streams of the process, it would probably make also the recovery of other elements of economic interest.
Complete survey of German sewage sludge ashes - phosphorous and technology metal recovery potential
(2014)
Sewage sludge ashes (SSA) are a possible source for recovery of phosphorous (P) and technology metals. Phosphorous is essential for all animate beings. So far, its sole external source is rock phosphate, which is a finite resource. The EU import dependency on P from regions with high domestic demands or political instabilities is almost complete. Furthermore, rock phosphate often contains high amounts of heavy metals like Cd and U that might lead to health and environmetal hazards. P recovered from SSA might diminish these problems. We analyzed SSA from German mono incineration facilities in terms of their elemental composition and respective recovery potential. More than 97% of the emerging SSA is monitored, enabling the determination of complete mass flows of the ashes and their components. Results indicate a P recovery potential of 19,000 t/a (more than 12% of the annual P demands for fertilizer production). The concentrations of Cd and U in SSA are significantly lower than in rock phosphate and thus might help to reduce possible envrionmental and health hazards.
Phosphorus (P) recovery is obligatory for all sewage sludges with more than 20 g P/kg dry matter (DM) from 2029 in Germany. Nine wastewater treatment plants (WWTPs) were chosen to investigate variations of phosphorus contents and other parameters in sewage sludge over the year. Monthly sewage sludge samples from each WWTP were analyzed for phosphorus and other matrix elements (C, N, H, Ca, Fe, Al, etc.), for several trace elements (As, Cr, Mo, Ni, Pb, Sn) and loss of ignition. Among the nine WWTPs, there are four which have phosphorus contents both above and below the recovery limit of 20 g/kg DM along the year. Considering the average phosphorus content over the year, only one of them is below the limit. Compared to other matrix elements and parameters, phosphorus fuctuations are low with an average of 7% over all nine WWTPs. In total, only hydrogen and carbon are more constant in the sludge.
In several WWTPs with chemical phosphorus elimination, phosphorus fuctuations showed similar courses like iron and/or aluminum. WWTPs with chamber flter presses rather showed dilution efects of calcium dosage. As result of this study, monthly phosphorus measurement is highly recommended to determine whether a WWTP is below the
20 g/kg DM limit.
Phosphorus recycling from sewage sludge will be obligatory in Germany from 2029. Phosphorus content determination in sewage sludge is crucial to assess the prescribed recycling rates. Currently, German law regards sample preparation using aqua regia digestion in a microwave or under reflux conditions as well as instrumental phosphorus determination by ICP-OES, ICP-MS, or photometric determination with ammonium molybdate as equivalent. However, it is questionable whether these methods are indeed equivalent regarding phosphorus quantification in sludges near the limit of 20 g/kg for mandatory recycling. To answer this question, 15 sewage sludges of 11 different wastewater treatment plants were investigated with all permitted method (digestion and measurement) combinations. Moreover, one sewage sludge was also examined in an interlaboratory comparison (ILC) with 28 participants. This study shows that the above-mentioned methods differ in some cases significantly but across all method combinations and sludges, phosphorus recovery was between 80 and 121% after normalization to the grand mean (average of 15 sludges between 85 and 111%). The ILC and the examination of 15 sludges produced largely similar results. There is a tendency to higher phosphorus recovery after microwave digestion compared to reflux digestion and ICP-OES measurements determine higher phosphorus contents than ICP-MS and photometric phosphorus determination. As a result, the authors recommend ICP-OES determination of phosphorus in sewage sludge after microwave digestion.
Future nutrient recovery from sewage sludge regarding three different scenarios - German case study
(2022)
Agricultural sewage sludge utilization becomes less important in Germany. In 2017, new fertilizer and waste laws caused the agricultural sewage sludge utilization to collapse by more than a quarter. From 2029, German wastewater treatment plants (WWTPs) must recover phosphorus (P) from sewage sludge if it contains more than 2 wt % P. Agricultural utilization will be prohibited for large WWTPs >100,000 population equivalents (pe) from 2029 and >50,000 pe from 2032. In Germany, each federal state must annually report amounts and quality of agriculturally utilized sewage sludge which was 16% of the total disposal in 2019. The reports of 10 states were evaluated for 2016 and 2017 representing approx. 60% of the total agriculturally used sludge volume. In 2016, 60% of the WWTPs’ sludges exceeded the recovery limit of 2 wt % P which is 70% of the amount of sludge and 85% of the phosphorus load. Other nutrients are not affected by the recovery obligation. However, many P recovery processes recover other nutrients, too. Considering three different scenarios for future German sewage sludge disposal shows that 70–77% of the P load in sewage sludge will probably be recovered in the future. At the same time, this applies for about 0–16% nitrogen, 36–52% of calcium, 31–53% of potassium, and 40–52% of magnesium. However, these recovered nutrients loads can substitute only 1% or less of the commercial fertilizer demand except from phosphorus which is up to 43% of the demand.