Filtern
Dokumenttyp
Sprache
- Englisch (2)
Schlagworte
- Analysis (1)
- Arch bridges (1)
- Berlin Congress Hall (1)
- Cast iron (1)
- Materials parameters (1)
- Partial collapse (1)
- Reconstruction (1)
- Rehabilitytion (1)
- Stress corrosion cracking (1)
The Berlin Congress Hall was a gift of the United States of America to Germany for the Berlin World Exhibition in 1957. The elegantly double-curved roof was made from an advanced prestressed concrete construction. The construction followed the design by the American architect Hugh Stubbins with special structural modifications to comply with German construction rules. No early indications for failure initiation were detected before a sudden partial collapse. On May 21st, 1980, the Southern external roof overhang collapsed. In December 1980, Jörg Schlaich and his co-authors published a summarizing expert opinion about structural causes of failure. The present paper mainly introduces results of cause analysis made at the Federal Institute for Materials Research and Testing (BAM), mandated by the Public Prosecutor at the Berlin District Court to specify the causes of the sudden failure. This paper refers to BAM-publications about analyses that were performed under this mandate and published – most of them in German language – within the first years after failure. The expert's opinions comprise structural considerations materials investigations, metallographic analyses and corrosion. Nowadays experts have learnt from the failure and built a slightly modified roof in the original shape at the 750th birthday of the city of Berlin and re-opened the former Berlin Congress Hall to the public on May 9th, 1987. The Hall is now serving as the House of the Cultures of the World, following the initial intention of the hall.
Cast iron arch bridges were built in the late 18th and early 19th century across Europe. After the famous Iron Bridge in the Ironbridge Gorge in Coalbrookdale in England, being now part of the UNESCO world heritage, many cast iron bridges followed and substituted timber bridges. A series of cast iron bridges has been built in central Europe, in Laasan, Breslau, (now Wrocław), in Berlin, Potsdam, Bad Muskau and Schwerin. The paper gives an overview about the current state of some remaining cast iron arch bridges, typical damage cases, material properties and rehabilitation. Most of the old cast iron arch bridges serve as pedestrian bridges. Some of these bridges have been strengthened to increase the traffic load. Different rehabilitation measures as substitution of parts of the bridges and strengthening using Carbon Reinforced Polymers (CFRP) are discussed.