One of the main unsolved issues of under-ground storages for, e.g., CO2, H2, and natural gas is the comprehensive surveillance of these areas with reasonable effort and costs. Conventional sensors (e.g., soil air probes or borehole probes), however, can only be used for punctual or locally limited measurements; further their application can cause structural influences (invasive application).
In this paper, we describe in detail the setup of a CO2 injection soil test field. This test field will be used to enhance and validate an innovative ap-proach for distributed subsurface monitoring of gas storage areas. To the author’s knowledge, this is the first time that, for this purpose, a test field is built in an application relevant scale.
Berlin Main Station is the largest multi-level station in Europe. Its daily passenger number amounts to over 300.000. Structures built for such a large number of people require a high-level safety standard. The station was built on the inner city site of the historic Lehrter Bahnhof. The conditions for building and start of operation were challenging by several reasons. The typical sandy ground with a high level of groundwater makes the permanent static stability of such a complex structure difficult. Several completed, ongoing, and planned construction activities in the immediate vicinity of the station influence the ground settlement of the whole area. On basis of the structural design an impact prediction was calculated, which expected certain vertical displacements particularly between the single columns of the outer concrete bridges of the building. These columns support the glass roof construction, which only allows a defined limit of displacement. In order to avoid damage, a concept for monitoring and adjusting potentially occurring displacements was developed for installation at the outer bridges of the station.