Filtern
Dokumenttyp
Sprache
- Englisch (3)
Referierte Publikation
- ja (3) (entfernen)
Schlagworte
- Interim storage (3) (entfernen)
Dry cask storage of spent fuel and high active waste front reprocessing is licensed and established in Germany for up to 40years so far. About 10years ago, the strategy has been shifted from centralized storage using facilities in Ahaus and Gorleben to cit-site storage facilities in Order to avoid immediate cask shipping from nuclear power plants. At present, several hundred casks are stored safeiy and without any major problem. BAM is highly involved in cask specific safety evaluations within the scope of licensing procedures as well as of quality assurance procedures during cask fabrication, loading and storage.
A major prerequisite for any cask storage license is a valid transport Type B license. Subsequently, cask transportability has to be ensured at any point during the entire storage period. So far, this requirement is met by continuous maintenance of the Type B license. Anyhow, IAEA Type B regulations do not consider permanently loaded storage casks that have the sole purpose of being finally shipped öfter decades of storage inducing ageing effects. No transport safety demonstration has to be performed on aged cask components.
Since the decision by the German government to face out nuclear electricity generation the total amount of spent nuclear fuel and high level wastes from reprocessing is limited and well determined. In addition the siting and licensing procedure to establish a final repository has been ruled by a new law in the mid of 2013 and further delays are very likely until a deep geological repository may start its operation.
In the meantime dry interim storage in dual purpose casks being permanently certified for interim storage as well as transportation is the established technical solution. Several on-site as well former centralized facilities are operated successfully for many years but storage licenses are generally limited to 40 years and future lifetime extensions are predictable. Permanent aging management for storage facilities and casks is necessary to demonstrate compliance with safety requirements and furthermore to gain relevant data and information about the technical conditions of the facilities and their components for future lifetime extensions.
For that reason procedures and measures are currently improved and the approach is explained in this paper. In addition, the current status and latest experiences concerning periodic safety inspections and aging management measures are discussed.
The safety assessment of casks for radioactive material at interim storage facilities or in final repositories includes the investigation of possible handling accidents if clearly defined test conditions are not available from the regulations. Specific handling accidents usually are the drop of a cask onto the transport vehicle or the floor as well as the collision with the wall of the storage building or another cask. For such load cases an experimental demonstration of cask safety would be difficult. Therefore, numerical analyses of the entire load scenario are preferred. The lessons learnt from dynamic finite element analyses of accident scenarios with thick-walled cubical containers or cylindrical casks are presented. The dependency of calculation results on initial and boundary conditions, material models, and contact conditions is discussed. Parameter sets used should be verified by numerical simulation of experimentally investigated similar test scenarios. On the other hand, decisions have to be made whether a parameter or property is modeled in a realistic or conservative manner. For example, a very small variation of the initial impact angle of a container can cause significantly different stresses and strains. In sophisticated cases an investigation of simpler limit load scenarios could be advantageous instead of analyzing a very complicated load scenario.