Dry cask storage of spent fuel and high active waste front reprocessing is licensed and established in Germany for up to 40years so far. About 10years ago, the strategy has been shifted from centralized storage using facilities in Ahaus and Gorleben to cit-site storage facilities in Order to avoid immediate cask shipping from nuclear power plants. At present, several hundred casks are stored safeiy and without any major problem. BAM is highly involved in cask specific safety evaluations within the scope of licensing procedures as well as of quality assurance procedures during cask fabrication, loading and storage.
A major prerequisite for any cask storage license is a valid transport Type B license. Subsequently, cask transportability has to be ensured at any point during the entire storage period. So far, this requirement is met by continuous maintenance of the Type B license. Anyhow, IAEA Type B regulations do not consider permanently loaded storage casks that have the sole purpose of being finally shipped öfter decades of storage inducing ageing effects. No transport safety demonstration has to be performed on aged cask components.
Validation of numerical simulation models for transport and storage casks using drop test results
(2012)
The safety assessment of new designs for transport and storage casks for radioactive materials is a challenging task accomplished using different methods such as prototype tests, model tests, calculations and analogy reflections. At BAM (Federal Institute for Materials Research and Testing), the test procedures for the mechanical IAEA (International Atomic Energy Agency) test conditions often start with preliminary finite element (FE) calculations mostly with a small-scale cask model for verification of the proposed test cask instrumentation and test plan. On that basis the extensive test cask instrumentation is applied and checked. After that, a series of drop tests consisting of different test sequences is performed.
Following the drop tests, numerical post-analyses are carried out. These analyses offer the possibility of a detailed calculation and assessment of stresses and strains in the entire test cask construction. The calculation results have to be carefully compared with the measurement data over the impact history to find out all relevant parameters for a realistic simulation of the impact scenario. The desired ideal boundary test conditions often cannot be met exactly during the drop tests. Therefore, the numerical post-analyses are carried out by using the real boundary conditions of the drop tests. The objective is to find a validated model, where the results of the numerical simulations satisfactorily meet the experimental results.
Under test conditions according to the IAEA transport regulations, casks are usually equipped with impact limiters and dropped onto a so-called unyielding target. In general, it is difficult to verify a complex FE model by using results from only one drop test because of the complex impact process and the complex structure of such packages. After each drop test, numerical post-analyses should be carried out. Only if all drop tests were simulated successfully by using the same FE model under different test conditions, it is possible to obtain a validated numerical model for further investigations. In this case the results of the numerical simulations meet satisfactorily the experimental results. In this paper a study is presented, where the influence of different components on the cask loading is investigated systematically.