The CCS technique involves the compression of emission gasses in deep geological layers. To guarantee the safety of the site, CO2-corrosion of the injection pipe steels has to be given special attention when engineering CCS-sites. To get to know the corrosion behaviour samples of the heat treated steel 1.72252CrMo4, used for casing, and the stainless injection-pipe steel 1.4034 X46Cr13 were kept at T=60 °C and ambient pressure as well as p=100 bar for 700 h - 8000 h in a CC 2-saturated synthetic aquifer environment similar to possible geological on-shore CCS-sites in the northern German Basin. The isothermal corrosion behaviour obtained by mass gain of the steels in the gas phase, the liquid phase and the intermediate phase gives surface corrosion rates around 0.1 to 0.8 mm/year at ambient pressure and much lower about 0.02 to 0.2 mm/year at 100 bar where the CO 2 is in its supercritical state. Severe pit corrosion with pit heights around 4.5 mm are only located on the 42CrMo4 steel. Main phase of the continuous complicated multi-layered carbonate/oxide structure is siderite FeCO 3 in both types of steel.
Dealing with first corrosion screening experiments to predict the reliability and safety of Germanys first Carbon Capture and Storage site in the northern Bassin of Germany, northwest of the Capital Berlin, laboratory experiments have been established to simulate the particular conditions at T=60 °C, highly saline aquifer water similar to 'Stuttgart Aquifer', but only at ambient pressure. With mounting 2 independent full 2-grade titanium autoclave systems (running up to 250 bar and 300 °C) pressures up to p=100 bar are possible. In 2010 a specific corrosion chamber of 2-grade titanium working up to 100 °C, flowing aqui fer water with different gas mixtures was designed to fit to a high cycle fatigue testing machine. Long term fatigue experiments simulating fatigue crack growth under corrosive environments will soon start. These experiments may not only help engineering a CCS site, but results can be used to improve the maintenance of geothermal energy production sites, especially moved parts such as pumps and shafts.
In geothermal power plants the materials used in pumps are loaded cyclically and
exposed constantly to the highly corrosive hot thermal water. The lifetime reduction
of AISI 420C (X46Cr13, 1.4034) is demonstrated in in-situ-laboratory experiments
(T=60 °C, geothermal brine: Stuttgart Aquifer flow rate: 9 l/h, CO2). S-N plots,
micrographic-, phase-, fractographic- and surface analysis were applied to obtain
sustainable information on the corrosion fatigue behavior. Maximum number of
cycles (here 12.5 x 106 cycles to failure) is reached at σa =173 MPa. No typical
fatigue strength exists and passive corrosion fatigue may be identified as failure
cause.
During the compression of emission gasses into deep geological layers (Carbon Dioxide Capture and Storage, CCS) CO2-corrosion will become a relevant safety issue. The reliability of the steels used at a geological onshore CCS-site in the Northern German Bassin 42CrMo4 (1.7225, AISI 4140) used for casing, and the injection pipe steels X46Cr13 (1.4034, AISI 420 C), X20Cr13 (1.4021, AISI 420 J) as well as X35CrMo17 (1.4122) is demonstrated in laboratory experiments. Samples were kept in a synthetic aquifer environment at T = 60 °C. This corrosive environment is then saturated with technical CO2 at a flow rate of 3 l/h. Microstructures were characterized by X-ray diffraction, light microscopy, scanning electron microscopy, and energy dispersive X-ray analysis, after a series of heat treatments (700 h to 2 years). The non-linear isothermal surface corrosion behaviour of the steels reveals surface corrosion rates around 0.10.8 mm/year, when obtained by mass gain. Severe pit corrosion (pit heights ca. 4.5 mm) are only located on the injection pipe steels. Main phases of the continuous scales are siderite FeCO3 and goethite α-FeOOH. The formation of the non-protective layer is likely to form via a
transient Fe(OH)2-phase.
Crack growth tests have been performed at 950 °C with Single Edge Notch specimens of the Ni-based single crystal superalloy PWA1483. In particular, several orientations and frequencies have been investigated, thus allowing the assessment of the influence of these parameters on the crack growth rate. In addition, oxidation experiments have been carried out to characterize the kinetics of the outer oxide scale growth at the same temperature.
On the other side, crack growth has been simulated with the Finite Element program ABAQUS in real test conditions by the node release technique. The nodes are released according to the measured crack growth rate.
The simulation results are compared with the test results on the basis of the computed Crack Tip Opening Displacement (CTOD). For this purpose, the crack is propagated until a stabilized value of the CTOD is obtained. This is usually the case when the crack has crossed the initial plastic zone. The procedure provides an evaluation of the effects of cycle frequency, crystal orientation, plasticity and oxide induced crack closure.
The oxidation behaviour of single crystal PWA 1483 at 950 °C was investigated by means of XRD, SEM and EDS. The parabolic oxidation behaviour, as defined by mass gain and the respective oxide layer thicknesses, is characterized by a parabolic rate constant of about 4 × 10-6 mg²/(cm4 × s) and the formation of a multi-layered oxide scale. An outer scale contains a Ti-bearing thin film composed of TiO2 and NiTiO3 but mostly Cr in Cr2O3 and (Ni/Co)Cr2O4 besides NiTaO4. This outer scale is connected to a discontinuous layer of Al2O3 and an area of γ?'-depletion within the base material.
In corrosive environments such as CCS bore holes or geothermal power plants the materials loaded cyclically are also exposed constantly to the highly corrosive hot thermal water. The lifetime reduction of (X46Cr13, AISI 420C) is demonstrated in in-situ-laboratory experiments (T=60 °C, geothermal brine: Stuttgart Aquifer flow rate: 9 Nl/h, CO2). S-N plots, micrographic-, phase-, fractographic- and surface analysis were applied to obtain sustainable information on the corrosion fatigue behavior. Maximum number of cycles (here 12.5 x 106 cycles to failure) is reached at σa =173 MPa. No typical fatigue strength exists and passive corrosion fatigue is most likely failure cause.
CO2-corrosion of injection pipe steels is a relevant safety issue when emission gasses are compressed in deep geological layers (CCS). The reliability of the steels used at the geological onshore CCS-site at Ketzin, Germany, is demonstrated in laboratory experiments under an equivalent corrosive environment (T=60 °C,p=1-60 bar, aquifer water, CO2-flow rate of 3 l/h, 700 h8000 h heat treatment). Corrosion kinetics and microstructures were characterized using samples of the heat treated steel 1.7225 (AISI 4140, 42CrMo4) used for casing, and samples of the martensitic stainless injection-pipe steel 1.4034 (AISI 420, X46Cr13).
When emission gasses are compressed into deep geological layers (CCS) CO2-corrosion of injection pipe steels is a relevant safety issue. The reliability of the steels used at the geological onshore CCS-site at Ketzin, Germany, is demonstrated in 2 years laboratory experiments under an equivalent corrosive environment at ambient pressure (T=60 °C, aquifer water, CO2-flow rate of 3 l/h). Corrosion kinetics and microstructures were characterized using samples of the heat treated steel 42CrMo4 (casing), and samples of the martensitic stainless steel X46Cr13 (injection).