Electrochemical potential mapping according to guideline B3 of DGZfP (German Society for Nondestructive Testing) is a recognized technique for the localization of corroding reinforcing steels. In reinforced concrete structures the measured potentials are not necessarily directly linked to the corrosion likelihood of the reinforcing steel. The measured values may be significantly affected, different from, e.g., stress measurement, by different influences on the potential formation at the phase boundary metal/concrete itself as well as the acquisition procedure. Due to the complexity of influencing factors there is a risk that the results are misinterpreted. Therefore, in a training concept firstly the theoretical basics of the test method should be imparted. Then, frequently occurring practical situations of various influencing factors will be made accessible to the participants by a model object specially designed for this purpose. The aim is to impart profound knowledge concerning the characteristics of potential mapping for detecting corrosion of reinforcing steel in order to apply this technique in practice as reliable and economical test method.
Chloride contents at the steel–mortar interface that initiate steel corrosion were determined for carbon steel in alkali‐activated fly ash mortar for three different exposure conditions: exposure to 1 M NaCl solution; leaching in deionized water and then exposure to 1 M NaCl solution; and leaching in deionized water, aging in air at 20°C and natural CO2 concentration, and then exposure to 1 M NaCl solution. For comparison, a Portland cement mortar, exposed to 1 M NaCl solution, was studied. The median values of the corrosion‐initiating chloride contents (average over the full length of the rebar) in the alkali‐activated fly ash mortar varied between 0.35 and 1.05 wt% Cl with respect to binder, consistently lower than what was obtained for the Portland cement mortar, but with no clear trend regarding the exposure conditions. For most of the alkali‐activated fly ash mortar specimens, preferential corrosion at the connection between the working electrode and the external measurement setup was observed, while preferential corrosion did not occur for the Portland cement mortar. Scanning electron microscopy and auxiliary experiments in synthetic solutions indicated that this behavior was caused by inhomogeneities at the steel–mortar interface in the alkali‐activated mortar, likely due to its peculiar rheological properties in the fresh state.
Während das Instandsetzungsprinzip W bei carbonatisierungsinduzierter Korrosion seit vielen Jahren als Standardverfahren etabliert ist, wird seine Anwendbarkeit bei chloridinduzierter Korrosion (W-Cl) in der Fachwelt bis heute kontrovers diskutiert. Zwar ergeben sich aus seiner Anwendung gegenüber anderen Instandsetzungsverfahren auf den ersten Blick u. U. deutliche wirtschaftliche Vorteile, allerdings besteht bei diesem Verfahren ein deutlich höheres Risiko, dass das Instandsetzungsziel nicht erreicht wird.
Im vorliegenden Beitrag werden die technischen Grundlagen des Instandsetzungsprinzips W-Cl sowie der aktuelle Kenntnisstand - sowohl für den gerissenen als auch für den ungerissenen Beton - dargestellt und baurechtliche Konsequenzen, die sich aus dem erhöhten Ausführungsrisiko ergeben, diskutiert.
Korrosionsmonitoring als Element zum Nachweis des Instandsetzungserfolgs bei Anwendung des Prinzips W-Cl wird vorgestellt.
Anhand von Anwendungsbeispielen werden sowohl die Risiken, die mit dem Verfahren verbunden sind, als auch das Potenzial bei erfolgreicher Anwendung veranschaulicht.