Following the long tradition of the Federal Institute for Materials Research and Testing (BAM) since Adolf Martens has created first routines in failure analysis (Ruske, 1971), BAM has been frequently called-in by the Berlin Traffic Association (BVG) to carry out root-cause analyses of the Berlin suburban train line (Frahm, 1902), reported in Helmerich and Herter (1999), Helmerich (2000), Nega and Winkler (1998), Helmerich et al. (2002) and Herter et al. (2002). This was also the case in the 1990s, when BVG-inspectors found cracks in hanging, barrel-like shaped ballast plates of the Berlin underground steel viaducts during regularly scheduled inspections. Cracks were located parallel to the riveted connection between the ballast plates and the upper chord of the viaduct cross girder steel profiles. For safety reasons, the operator BVG immediately stopped the cracks by means of drilling stop holes at the crack tips. As intermediate measures, longitudinal steel profiles were spanned below the rail axes between the cross girders affected to stabilize the track in longitudinal direction. The inspection period was shortened from years to few weeks. BAM was mandated to measure strains under regular train traffic to analyze the cause of the cracks. Strains were measured in identical connections as the damaged details, which did not suffer from cracks at the time of the measurement. The traffic-induced strain cycles and thus the resulting strain differences in the questionable cross sections were higher than expected and resulted in stresses of max. 85.8 MPa. Calculations showed that the credible remaining fatigue life for this particular structural detail was exceeded after 68 years according to nowadays standards. Extensive discussions, further field and laboratory tests followed to develop a rehabilitation plan for retrofitting the structure with minimum interference of the traffic. Finally, a method with minimum intervention to the structure was elaborated by a consortium of the operator BVG, BAM and producers based on further laboratory and field tests at BAM. Now, the viaduct is saved for the future.
Assessment of existing steel structures - A guideline for estimation of the remaining fatigue life
(2007)
In many countries and regions, traffic infrastructure projects suffer from low funding. The budget is tight for new infrastructure building and, thus, the importance of inspection, maintenance and assessment of the existing traffic infrastructure increases. A new fatigue assessment guideline for the estimation of the remaining fatigue life of steel bridges has been written by technical committee 6 of the European Convention of Constructional Steelwork (ECCS). It will be a useful tool for the complementation of bridge management systems, used commonly for condition assessment.
Design specifications and rules are harmonised throughout Europe. They are under constant development, but there is still a lack of forwarding and concentrating experiences as well as developing rules for the fatigue assessment on existing steel structures. This paper presents a guideline with a proposed fatigue assessment procedure for existing steel structures embedded in information about old materials and non-destructive testing methods for the evaluation of details (ECCS 2004, Assessment of existing steel structures). Particular attention is paid on remedial measures which are proposed for weak details and damages caused by fatigue. The developed fatigue assessment procedure can be applied to existing steel structures under cyclic loading in general, but the guideline concentrates on the existing traffic infrastructure made from old steel, because of the public importance. The proposed procedure summarizes, regroups and arranges the knowledge in the field of assessment on existing steel to be applied by practicing engineers. The procedure is a milestone in knowledge transfer from a state of scientific knowledge to state-of-the-art.
For almost 15 years, carbon fibre-reinforced polymer (CFRP) plates and sheets have been used for strengthening and repair of civil engineering structures. CFRP plates were applied to upgrade structures for change in use or increasing traffic load. CFRP laminates have also been used to repair deteriorated structures such as multi-storey parking or bridges. The execution quality and condition of the strengthening measure in terms of bond integrity were neither monitored nor tested systematically. Inspectors eventually applied simple hammer knocking during regular main inspection for subjective noise distinction as a measure for eventual insufficient bond. This paper presents the feasibility and the limitations of low-frequency transversal ultrasonic waves with dry-coupling point-contact sensors for inspection and defect detection between CFRP laminate and concrete surfaces. The German Centre of Competence in Civil Engineering (DIBt) has initiated a national research project [Helmerich et al. (2012). Condition analysis of bonded CFRP-applications on concrete structures by means of non-destructive testing [in German: Zustandsuntersuchung von CFK-Klebeverstärkungen an Betonbauteilen mittels zerstörungsfreier Prüfung (ZfP)]. Final, internal project report], carried out at the Federal Institute for Materials Research and Testing (BAM), Germany. The aim of the project was to present a potential non-destructive testing method for bond defect detection as a measure for the durability of the strengthening system more than 10 years after application.
The European infrastructure asset has developed historically and is characterized by nation-specific construction processes. Inspection, condition assessment, and maintenance procedures differ from country to country. Because of historical and political circumstances, national infrastructure assets are maintained at different levels, too. Since the budget for maintaining the bridge infrastructure less and less meets the demands of a growing bridge stock, bridge inspection, maintenance, and life-cycle considerations gain higher importance. The need exists to develop effective diagnosis tools for early detection of construction faults, defects, and deterioration processes during inspection, to keep the bridge infrastructure at an acceptable level, from structural safety and economic viewpoints. An overview on the latest research projects and integrated bridge management systems in Europe is given. The potentials of nondestructive testing (NDT) are presented, with special focus on technical advances of NDT applications to reinforced concrete (RC) and posttensioned concrete bridges. Although NDT is not regularly integrated in these processes, the application brings valuable information on the current condition of the inner structure in called-in special inspections. NDT-automation and the application of imaging echo methods, combined with advanced data processing, produce a surprising level of information about the inner structure of massive RC slabs up to a depth of about 60 cm. Detected inhomogeneity and scatterers of acoustic or electromagnetic waves can be visualized in vertical or horizontal slices through the structure or animations. The fusion of different three-dimensional data sets of processed data improves the interpretability and accuracy of the results.
Complex special inspection of an old masonry arch bridge according to the Guideline on Inspection and Condition Assessment of Railway Bridges and numerical analysis of the structure are presented. The guideline summarises recommendations for the step-by-step investigation of railway bridges applying enhanced methods developed during the EU-funded project Sustainable Bridges. For the investigation of the arch barrel, the ballast parameters and the inner structure of the backfill behind the arch barrel a number of various advanced non-destructive and minor-destructive testing methods were applied. Deformation of the structure during load tests was measured using three independent measuring systems: laser vibrometer, LVDT and microwave radar. Results of calculations performed with 2D and 3D models based on FEM are compared with the field load tests. Sensitivity of the ultimate load of the structure to investigated parameters is studied in FE model. Some general conclusions according to methods of testing and modelling of masonry arch bridges are presented and discussed.