Filtern
Erscheinungsjahr
Dokumenttyp
- Beitrag zu einem Sammelband (23)
- Beitrag zu einem Tagungsband (23)
- Vortrag (21)
- Zeitschriftenartikel (2)
- Buchkapitel (2)
- Forschungsbericht (2)
- Sonstiges (1)
- Posterpräsentation (1)
Sprache
- Englisch (75) (entfernen)
Referierte Publikation
- nein (75) (entfernen)
Schlagworte
- Non-destructive testing (9)
- Monitoring (7)
- Condition assessment (5)
- NDT (5)
- Nondestructive testing (5)
- Active thermography (4)
- Inspection (4)
- Non-Destructive Testing (4)
- Ontology (4)
- Bridge (3)
Organisationseinheit der BAM
Eingeladener Vortrag
- nein (21)
The active approach for non-destructive-testing in Civil Engineering (NDT-CE) with infraredthermography (IR), developed at the Federal Institute for Materials Research and Testing (BAM), is described in part one of this contribution. The active IR-approach is based on the principles of impulse- (IT) and pulse-phase-thermography (PPT). The concept is a direct result of a research project at the BAM in cooperation with the Technical University of Berlin (TUB) and was funded by the Deutsche Forschungsgemeinschaft (DFG). In the second part results of the new thermography-scanning system (thermo-scanner) of BAM on debonding of multi-layered structures, especially carbon fibre reinforced plates (CFRP) on concrete are presented. Both, the thermo-scanner developed at BAM, and the investigations carried out, are part of the
EU-Project Sustainable Bridges. In the third part of the paper the characteristic frequency of the optimum phase-contrast as a means for the characterization of defects depth in CE by means of PPT is introduced. A new quantitative approach is tested and discussed on concrete structures with defects of polystyrene and gas concrete.
Berlin Main Station is the largest multi-level station in Europe. Its daily passenger number amounts to over 300.000. Structures built for such a large number of people require a high-level safety standard. The station was built on the inner city site of the historic Lehrter Bahnhof. The conditions for building and start of operation were challenging by several reasons. The typical sandy ground with a high level of groundwater makes the permanent static stability of such a complex structure difficult. Several completed, ongoing, and planned construction activities in the immediate vicinity of the station influence the ground settlement of the whole area. On basis of the structural design an impact prediction was calculated, which expected certain vertical displacements particularly between the single columns of the outer concrete bridges of the building. These columns support the glass roof construction, which only allows a defined limit of displacement. In order to avoid damage, a concept for monitoring and adjusting potentially occurring displacements was developed for installation at the outer bridges of the station.
Condition assessment of old railway bridges, a scientific cooperation between Berlin and Wroclaw
(2009)
Two years ago, the East Prussian and the Low-Silesian Railway lines celebrated their 160th anniversaries. The history of both first railway connections in the Eastern railway network development in the whole region in the 19th century is presented together with information about the railway between Berlin and Wroclaw. Special attention is paid to the railway bridges built in this period. The first large iron bridges and typical masonry arch structures are presented. Special attention is paid to masonry arches. The condition appraisal of existing masonry arches requires new developed technical methodologies, effective tools and procedures for the description of the bridges current state and function. Their current technical condition as well as service-ability is described.