Filtern
Erscheinungsjahr
Dokumenttyp
- Beitrag zu einem Tagungsband (32) (entfernen)
Schlagworte
- Concrete (5)
- Non-destructive testing (5)
- Inspection (3)
- Bluetooth (2)
- Concrete bridges (2)
- Debonding (2)
- Ground penetration radar (2)
- Moisture (2)
- Monitoring (2)
- Non-Destructive Testing (2)
Organisationseinheit der BAM
Condition assessment of old railway bridges, a scientific cooperation between Berlin and Wroclaw
(2009)
Two years ago, the East Prussian and the Low-Silesian Railway lines celebrated their 160th anniversaries. The history of both first railway connections in the Eastern railway network development in the whole region in the 19th century is presented together with information about the railway between Berlin and Wroclaw. Special attention is paid to the railway bridges built in this period. The first large iron bridges and typical masonry arch structures are presented. Special attention is paid to masonry arches. The condition appraisal of existing masonry arches requires new developed technical methodologies, effective tools and procedures for the description of the bridges current state and function. Their current technical condition as well as service-ability is described.
In 1882, the East-West suburban train viaduct was built through Berlin as part of the public traffic solution in the late 19th Century. Today, the only left over iron arch bridge is a pair of two arches Crossing the Spree river in the middle of Berlin. Before dismantling the former parallel two original pairs of iron arches and rebuilding new arches for the high-speed railway line through Berlin in 1997, BAM was involved in an extensive test program of the heritage iron arch structure. Especially the estimation of accumulated damage in critical details and the verification of the old material properties at early stage was important information to the bridge owners. The testing program included two strain and displacement measurement campaigns, non-destructive testing, materials testing and microscale metallographic analysis of critical details. The measured strain cycles were significant lower in number and size than expected. Most of the cycles were compression stress cycles only. The work was planned in Cooperation with the Berlin consultancy Professor Hilbers that was responsible for the design and calculation of the reconstruction measures. Additionally, after calculation of the possible reuse of the old arches, we compared measured data from strain measurements with the results from calculation.
The measured data and the calculated data show a good qualitative correlation.