- Offshore pile foundation (5)
- Cyclic loading (4)
- Cyclic lateral load (3)
- Numerical model (3)
- Pore pressure accumulation (3)
- Assessment criteria (2)
- Bridge transition zone (2)
- Cyclic loads (2)
- Densification (2)
- Offshore foundations (2)
- Offshore wind turbines (2)
- Pfahlgründungen (2)
- Ratcheting (2)
- Tragfähigkeit (2)
- Train-track-bridge-interaction (2)
- Transition zone (2)
- Vehicle model (2)
- Acceleration (1)
- Anwachsen (1)
- Axial pile capacity (1)
- Ballast (1)
- Bearing capacitiy (1)
- Belastung (1)
- Berechnungs- und Bemessungsverfahren - Analysis and calculation (1)
- Bridge deck (1)
- Convection (1)
- Coupled numerical modelling (1)
- Cyclic axial loading (1)
- Dehnungsmessung (1)
- Driving Versuche - Experimental set-ups (1)
- Evolutionary computing (1)
- Feldversuch (1)
- Field test (1)
- Field tests (1)
- Grain migration (1)
- Granular convection (1)
- Increase (1)
- Inverse problem (1)
- Large-scale field testing (1)
- Liquefaction (1)
- Liquefaction analysis (1)
- Mast- und Turmbau - Masts and towers (1)
- Model testing (1)
- Multimodal solution (1)
- Offshore (1)
- Offshore Windkraftanlagen (1)
- Offshore foundation (1)
- Offshore structures (1)
- Offshore-Gründung (1)
- Offshore-Pfahlgründung (1)
- Pfahl (1)
- Pile ageing (1)
- Pile foundation (1)
- Pile foundations (1)
- Pile monitoring (1)
- Piles (1)
- Pore pressure build-up (1)
- Pore-pressure accumulation (1)
- Porenwasserdruckaufbau (1)
- Rammung (1)
- Sand (hydraulic) (1)
- Softening (1)
- Soil liquefaction (1)
- Stahlhochbau - Steel buildings (1)
- Stahlpfahl, gerammt (1)
- Stahlwasserbau - Steel structures for hydraulic engineering (1)
- Steel driven piles (1)
- Steel pile, driven in (1)
- System identification (1)
- Track deterioration (1)
- Track settlement (1)
- Track stability (1)
- Train-track-interaction (1)
- Windenergie (1)
- Zyklik (1)
- Zyklische (1)
- Überwachungsverfahren (1)
A mechanical structure supported by nonlinear springs subjected to an external load is considered. If all mechanical parameters of the system were known, the displacement of the system subjected to this load could be easily calculated. If not all of the parameters are known, but the load and the displacement are measured at one location, an inverse problem exists. In the presented problem the nonlinear springs are unknown and have to be determined. At first glance a problem needs to be solved, which is underdetermined due to the number of unknown variables. However, evolutionary computing can be applied to solve this inverse, nonlinear and multimodal problem. Sometimes a prior knowledge exists on certain system properties, which is difficult to implement into analytical or numerical solver. This knowledge can play a decisive role in identifying the system properties and it can be easily included as boundary condition when applying evolutionary algorithm. This article examines how and under what conditions the spring resistances can be identified. The procedure is exemplified at a mechanical system of a pile foundation.
A comprehensive numerical model for the analysis of offshore foundations under a general transient loading is presented here. The theoretical basis of the model lies on the Swansea formulation of Biot's equations of dynamic poroelasticity combined with a constitutive model that reproduces key aspects of cyclic soil behaviour in the frame of the theory of generalised plasticity. On the practical side, the adoption of appropriate finite element formulations may prevent the appearance of spurious numerical instabilities of the pore pressure field. In this respect, the use of a coupled enhanced-strain element is here proposed. On the other hand, the practicality of the presented model depends ultimately on its computational efficiency. Some practical recommendations concerning the solution strategies, the matrix storage/handling procedures and the parallel multi-processor computation are here provided. Finally, the performance of the model with a benchmark study case and its practical application to analyse the soil–structure interaction of an offshore monopile under a realistic transient storm loading are discussed.
The main degradation process at bridge transition zones due to traffic loads is the appearance of differential settlements. Abrupt stiffness changes, repeating traffic loads and relative displacements of the superstructure ends on bridges often aggravate this problem. In this contribution, a 3D finite element (FE) model extended with a boundary formulation in the frame of the scaled-boundary finite element method (SBFEM) for a transient analysis of train-track-bridge interaction is presented. This numerical model permits an assessment of bridge transition zone with respect to permanent deformations of the track. The main focus lies on the modeling strategies for the vehicle and their impact on suitable assessment criteria for bridge transition zones. For this purpose, two different modeling strategies for the vehicle, a moving load model and a multibody model, have been compared and discussed on the basis of the assessment criteria. The results indicate that the model of the vehicle has a minor effect for an assessment on the embankment, but that the assessment on the bridge may show significant differences depending on whether the inertial components of the vehicle (multibody model) are considered.
In diesem Artikel wird ein 3D FE-Modell für den Brückenübergangsbereich vorgestellt, das eine Bewertung hinsichtlich des Langzeitverhaltens ermöglicht und an dem Optimierungsmaßnahmen diskutiert werden können. Bestandteile des numerischen Modells sind das Fahrzeug-Fahrwegmodell mit Brückenstruktur und eine Randformulierung mit der SBFEM. Die hier diskutierten Optimierungsmaßnahmen fokussieren sich auf eine reine Anpassung der Fahrwegsteifigkeit durch elastische Elemente auf der Brückenstruktur.
Ermittlung von Beanspruchung und Verformungen von Pfahlgründungen - Messverfahren und Applikation
(2014)
Vor dem Hintergrund einer angestrebten größeren Unabhängigkeit der Energieversorgung von fossilen Energieträgern hat die Windenergie in den letzten Dekaden zunehmend an Bedeutung gewonnen. Dabei wird insbesondere die Energiegewinnung offshore in der Deutschen Nordsee, auf Grund dort vorhandener stetiger Winde und sinkender Akzeptanz von Windkraftanlagen an Land, forciert. Im Hinblick auf die Gründung dieser Anlagen wird technisches Neuland betreten.
Angesichts von Wassertiefen bis über 25 m erhalten aufgelöste Gründungsstrukturen wie Tripod und Jacket oft den Vorzug vor Monopiles. Letztere waren wegen der geringen Produktions- und Installationskosten, der bisher am häufigsten angewandte Gründungstyp in flacheren Gewässern.
Monopile- und Mehrpfahlgründung unterscheiden sich wesentlich im Abtrag der Belastung durch Beanspruchungen aus Wind und Wellen in den umgebenden Baugrund. Während beim Monopile die zyklischen Momente über laterale Bettung abgetragen werden, entstehen an den Mehrpfahlgründungen axiale Zug- und Druckbelastungspaare in gegenüberliegenden Pfählen. Die zyklischen Belastungen von Monopiles sind demnach hauptsächlich in lateraler Richtung zu erwarten, während für Mehrpfahlgründungen die zyklische Belastung einen überwiegend axialen Charakter aufweist. Die zyklischen axialen Lasten in den Pfählen der Mehrpfahlgründungen können die axialen Tragfähigkeiten insbesondere am Pfahlmantel reduzieren und damit evtl, zu einem Versagen der Gründung führen.
The bridge design for railway bridges is far more dependent on the interaction with the traffic and the carriageway than for road bridges. This is especially true for the specific demands of the track in highspeed railways. Both maintenance and safety of the track have to be considered. The most relevant sections for the design criteria can be located at the bridge transition zones. Based on experimental investigations it is shown that bridge joint displacements, changes in stiffness and uplifting of the sleeper are causes for an increased degradation and loss in strength of the ballasted track. With respect to high speed vibrations of the bridge deck can have an even more decisive impact. Bridge deck vibrations can lead to destabilization of the bailast. In a numerical study the behavior of the track at the bridge is illustrated.
Offshore-Pfähle in Mehrpfahlgründungsstrukturen wie Jacket-Gründungen müssen nach der Rammung überwiegend zyklisch axialen Belastungen widerstehen. Die Abmessungen der Pfähle werden sowohl von der inneren Tragfähigkeit und dem Ermüdungsverhalten des Stahlquerschnittes als auch von der äußeren Tragfähigkeit und der Pfahl-Boden-Interaktion bestimmt. Aufgrund der großen Zahl von Pfahlgründungen, die für aktuelle und zukünftige Windparkprojekte benötigt werden, besteht ein dringender Bedarf, die Dimensionierung und die damit verbundenen Kosten des Einzelpfahles zu optimieren. Bezüglich der Pfahltragfähigkeit sind wichtige aktuelle Forschungsthemen eine mögliche Traglaststeigerung durch Anwachsen und die geeignete Abschätzung der zyklischen Degradation. Zur Untersuchung beider Effekte wurde eine großmaßstäbliche Versuchsanlage auf dem Testgelände BAM TTS in Horstwalde nahe Berlin errichtet. Auf diesem Versuchsfeld können große Stahlrohrammpfähle zyklisch druck- und zugbelastet werden. Zudem kann die Untersuchung von Alterungseffekten durch zeitlichen Versatz zwischen den Messkampagnen untersucht werden. Erste Ergebnisse zeigen einen Anstieg der Pfahltragfähigkeit bis zu ca. 60 % nach einer Standzeit von ca. 18 Monaten. Für die Degradation der Tragfähigkeit der zyklisch belasteten Pfähle zeigen die ersten vorläufigen Ergebnisse ein zum Teil unerwartetes Verhalten. Zusätzliche Untersuchungen werden derzeit zur weiteren Abklärung durchgeführt.
Im Rahmen mehrerer vom Bundesumweltministerium geförderter Forschungsvorhaben untersucht die BAM Bundesanstalt für Materialforschung und -prüfung zusammen mit Partnern aus Industrie und Wissenschaft das Tragverhalten von zyklisch lateral und axial belasteten Rammpfählen für Offshore-Windkraftanlagen. Neben Modellversuchen im Labor werden hierbei auch Großversuche durchgeführt. In diesem Beitrag wird das neu erstellte Testfeld der BAM zur Prüfung von Pfählen in Horstwalde vorgestellt. In den laufenden Großversuchen werden Parameter wie Tragfähigkeitsminderung infolge zyklisch-axialer Lasten im Druck- und Zugbereich sowie die Zunahme von Tragfähigkeiten durch sogenannte Anwachseffekte untersucht. Bezüglich der zyklischen Belastungen werden insbesondere als unsicher anzunehmende Wertepaare in den derzeit verwendeten Interaktionsdiagrammen betrachtet, wobei hier das Hauptaugenmerk aber nicht nur auf dem Versagen des Pfahls, sondern auch auf der Ermittlung der Resttragfähigkeit nach definierten Zyklenzahlen liegt. Im Beitrag werden erste Ergebnisse zu den Anwachseffekten präsentiert und mit Ergebnissen aus der Literatur verglichen. Des Weiteren werden das Versuchsprogramm zu den zyklisch axial belasteten Pfählen vorgestellt und erste Ergebnisse gezeigt. In einem Ausblick werden weitere Ziele des Forschungsvorhabens beschrieben. Hierzu gehören die Validierung und Kalibrierung eines existierenden Modells zur Ermittlung der Tragfähigkeit unter zyklischer Belastung auf der Grundlage aktueller Messdaten am Pfahl.-----------------------------------------------------------------------------------------------
Large-scale tests on driven piles for the investigation of pile capacity under cyclic loading and ageing effects. The cyclic behaviour of axially and laterally loaded piles for the foundation of offshore wind turbines is being investigated by the Federal Institute for Materials Research and Testing (BAM) in the frame of several research projects funded by the German Federal Ministry for the Environment and carried out in cooperation with industrial and academic partners. To this end, physical model tests in reduced scale as well as large scale field tests are being performed. This paper presents the new pile testing facility in the BAM's testing site at Horstwalde. The large-scale tests being performed there are aiming at the pile capacity degradation due to cyclic axial loading (both in tension and compression) as well as at the investigation of the capacity gains due to ageing effects (pile setup). Concerning the cyclic loading, the investigations have been mainly focused on special load combinations where there is little experience and where current interaction diagrams are loosely defined. However, the aim of the tests was not the cyclic failure, but rather the assessment of the post-cyclic capacity after the application of a pre-defined number of load cycles. Here, the testing program is summarised and some key results from the first testing campaign are discussed. The paper also presents some preliminary results concerning the capacity gains through ageing and compares them to previous experience from the literature. Finally, the paper gives an outlook on further goals of the current research projects, including the validation and calibration of a design model for the cyclic capacity of piles based on measured data from real piles.
Offshore piles have to withstand predominantly cyclic axial loads when they are installed in multi-pile configurations, as in jacket foundations. The dimensions of the pile are governed by both the internal capacity and the fatigue behaviour of the steel cross-section as well as by its external capacity in the pile-soil interaction. Owing to the large numbers of piled foundations required for current and future offshore wind farms, there is an urgent need to optimize the dimensions and related costs of single piles. With regard to the pile capacity, two major topics of research are the determination of possible capacity gains due to pile ageing effects and proper consideration of cyclic degradation. In order to investigate both effects, a large-scale testing facility has been constructed at the BAM TTS site in Horstwalde near Berlin. This open-air facility allows large tubular driven piles to be loaded cyclically in both tension and compression while studying the ageing effects by introducing delays between the testing campaigns. First results already show a moderate increase in pile capacity over time. Concerning the anticipated capacity degradation of cyclically loaded piles, preliminary results show an unexpected behaviour. Additional tests are currently being conducted for further clarification.