Filtern
Dokumenttyp
Sprache
- Englisch (3)
Schlagworte
- Fatigue (1)
- Monitoring strategy (1)
- Orthotropic steel bridge deck (1)
- Orthotropic steel deck (1)
- Posterior utilities (1)
- Quantification (1)
- SHM (1)
- SHM information (1)
- Steel bridge deck (1)
- Structural health monitoring (1)
Organisationseinheit der BAM
Quantification of the posterior utilities of SHM campaigns on an orthotropic steel bridge deck
(2019)
This paper contains a quantification and decision theoretical optimization of the posterior utilities for several options for monitoring campaigns on the particular case of fatigue life predictions of an orthotropic steel deck. The monitoring campaigns are defined by varying monitoring durations and phases. The decision analysis is performed with real data from the Structural Health Monitoring (SHM) of the Great Belt Bridge (Denmark) which, among others, consist of measured strains, pavement temperatures and traffic intensities. The fatigue loading prediction model is based on regression models linking daily averaged pavement temperatures, daily aggregated heavy-traffic Counts and derived S-N fatigue damages, all of them derived from the outcomes of different monitoring campaigns. A probabilistic methodology is utilized to calculate the fatigue reliability profiles of selected instrumented welded joints. The posterior utilities of SHM campaigns are then quantified by considering the structural fatigue reliability, various monitoring campaigns and the corresponding cost-benefit models. The decisions of identifying the optimal monitoring campaign and of extending the service life or not in conjunction with monitoring results are modelled. The optimal monitoring campaign is identified - retrospectively - by maximizing the expected benefits and minimize risks in dependency of the monitoring duration and the monitoring associated costs. The results, despite relying on a number of simplistic assumptions, pave the way towards the use of pre-posterior decision support to optimise the design of monitoring campaigns for similar bridges, with an overall goal to proof the cost efficiency of SHM approaches to civil infrastructure management.
Optimization of the duration of Structural Health Monitoring (SHM) campaigns is rarely performed.
This article provides a utility-based solution to posteriorly determine: i) optimal monitoring Durations and ii) the extension of the service life of the welds on a steel bridge deck. The approach is Illustrated with a case study focusing on remaining fatigue life estimation of the welds on the orthotropic steel deck of the Great Belt Bridge, in Denmark. The identification of the optimal monitoring duration and the decision about extending the service life of the welds are modelled by maximizing the expected benefits and minimizing the structural risks. The results are a parametric analysis, mainly on the effect of the target probability, benefit, cost of failure, cost of rehabilitation, cost of monitoring and Discount rate on the posterior utilities of monitoring strategies and the choice of service life considering the risk variability and the costs and benefits models. The results show that the decision on short-term monitoring, i.e., 1 week every six months, is overall the most valued SHM strategy. In addition, it is found that the target probability is the most sensitive parameter affecting the optimal SHM Durations and service life extension of the welds.
Quantification of the posterior utilities of SHM campaigns on an orthotropic steel bridge deck
(2019)
This paper contains a quantification and decision theoretical optimization of the posterior utilities for several options for monitoring campaigns on the particular case of fatigue life predictions of an orthotropic steel deck. The monitoring campaigns are defined by varying monitoring durations and phases. The decision analysis is performed with real data from the Structural Health Monitoring (SHM) of the Great Belt Bridge (Denmark) which, among others, consist of measured strains, pavement temperatures and traffic intensities. The fatigue loading prediction model is based on regression models linking daily averaged pavement temperatures, daily aggregated heavy-traffic Counts and derived S-N fatigue damages, all of them derived from the outcomes of different monitoring campaigns. A probabilistic methodology is utilized to calculate the fatigue reliability profiles of selected instrumented welded joints. The posterior utilities of SHM campaigns are then quantified by considering the structural fatigue reliability, various monitoring campaigns and the corresponding cost-benefit models. The decisions of identifying the optimal monitoring campaign and of extending the service life or not in conjunction with monitoring results are modelled. The optimal monitoring campaign is identified - retrospectively - by maximizing the expected benefits and minimize risks in dependency of the monitoring duration and the monitoring associated costs. The results, despite relying on a number of simplistic assumptions, pave the way towards the use of pre-posterior decision support to optimise the design of monitoring campaigns for similar bridges, with an overall goal to proof the cost efficiency of SHM approaches to civil infrastructure management.