Filtern
Dokumenttyp
- Beitrag zu einem Tagungsband (4) (entfernen)
Referierte Publikation
- nein (4)
Schlagworte
- Monitoring (4) (entfernen)
Organisationseinheit der BAM
- 7 Bauwerkssicherheit (4) (entfernen)
Multi-sensory monitoring and ultrasound for quality assurance at underground sealing structures
(2023)
Within the safety concepts of underground disposal sites of nuclear waste, engineered barriers play an important role. As these sealing structures have high demands concerning integrity, we aim at advancing the available construction materials, monitoring, and inspection techniques within the project SealWasteSafe. A specifically developed alkali-activated material is compared to classical salt concrete. A comprehensive multi-sensory monitoring scheme is used at 150-340 l specimens to monitor setting and hardening of both materials. All sensors are demonstrated to resist the highly alkaline environments. Besides cabled and wireless temperature and humidity of the materials, strain variations using fibre optic sensors and acoustic emissions are recorded over periods of at least 28 days, partly for more than eight months. After hardening of the specimens, further nondestructive evaluations using ultrasonic echo and thermographic measurements are conducted.
Preliminary results proof the suitability of the tested sensors and clearly highlight differences between the tested materials. Particularly, the newly developed alkali-activated material shows lower acoustic emission activity indicating less cracking activity. Additionally, unique ultrasonic methods will enable better images of potential internal objects and cracks at in-situ sealing structures. A largescale ultrasonic system is optimised to reliably detect objects at a depth exceeding 9 m while still obtaining a good resolution. Modelling studies show the potential of further increasing the distance between individual transducer arrays. Additionally, a new ultrasonic borehole probe using phased arrays allowing for beam focussing is constructed and tested. Laboratory measurements at a halfcylindrical concrete specimen coincide well with the previous modelling. In total, the presented safe materials, detailed monitoring approaches and ultrasonic quality assurance methods will help to obtain safe sealing structures within salt as a host rock. The concepts can partly be transferred to sealing structures in alternative host rocks and will also be valuable for non-nuclear waste repositories.
Die B1 Brücke am Altstädter Bahnhof in Brandenburg an der Havel wurde im Dezember 2019 aufgrund von während einer turnusmäßigen Inspektion entdeckten Rissen und Hohlstellen entlang der vorgespannten Längsträger gesperrt und im Mai 2021 abgebrochen. In der Zwischenzeit wurde die Brücke detailliert überwacht. Vor dem Abriss wurden zudem umfangreiche Untersuchungen zur Bestandsaufnahme und Schadensanalyse sowie Tests moderner Sensorik vorgenommen. Dabei konnte sowohl die richtige, zuvor nicht sicher bekannte Anzahl von Spanngliedern in den Querträgern sicher ermittelt werden als auch durch moderne Varianten der Schwingungsmessungen und der faseroptischen Sensorik zusätzliche Kenntnisse püber das Bauwerksverhalten ermittelt werden . In dem Beitrag werden die Verfahren mit ihren Möglichkeiten und Grenzen vorgestellt, die Ergebnissee an der Brücke in Brandenburg erläutert und zukünftige Einsatzmöglichkeiten diskutiert.
The reliability of deteriorating structures at time t is quantified by the probability that failure occurs within the period leading up to time t. This probability is often referred to as cumulative failure probability and is equal to the cumulative distribution function of the time to failure. In structural reliability, an estimate of the cumulative failure probability is obtained based on probabilistic Engineering models of the deterioration processes and structural performance. Information on the condition and the loading contained in inspection and monitoring data can be included in the probability estimate through Bayesian updating. Conditioning the
probability of failure on the inspection or monitoring outcomes available at time t (e.g. detections or no detection of damages) can lead to a reduction in that probability.
Such a drop in the cumulative failure probability might seem counterintuitive since the cumulative failure probability is a non-decreasing function of time. In this paper, we illustrate—with the help of a numerical example—that such a drop is possible because the cumulative probability before and after the updating is not based on the same information, hence not on the same probabilistic model.
The corrosion of steel in reinforced concrete structures is one of the main threats to their durability. Based on the scientific achievements of the past decades the knowledge about the deterioration mechanisms and possible repair strategies for corrosion induced damages have found their way into practice.
It is common sense, that a detailed assessment of the structure is the foundation for a successful repair measure. In addition to the “traditional” singular on-site-procedures such as measurement of concrete cover, carbonation depth, half-cell potentials and chloride contents the monitoring of corrosion related parameters has gained in importance over the past few years.
The advantages of a corrosion monitoring are obvious. In new buildings, structural elements which cannot be assessed after completion (e.g. tunnel segments), or members with electrically isolating coatings can be monitored by means of integrated sensors providing an insight into the development of crucial parameters such as electrochemical potentials, corrosion currents and the electrical resistivity of the concrete. A less known but very beneficial field of application is the use of corrosion monitoring as an integral part of a repair measure based on principles such as the cathodic protection of steel in concrete (CP) or increasing the electrical resistivity of the concrete (IR). By implementing a corrosion monitoring system, it is possible to survey the time dependent effect of the repair measure on the corrosion process which may lead to a confirmation of successful repair measure or to a modification of the repair strategy.
As the principle of cathodic protection for steel in concrete is a recognized repair measure today, the number of applications increases steadily and thus increasing the relevance for corrosion monitoring. Nevertheless, no standards or guidelines concerning the corrosion monitoring are available in Germany today, making it difficult to implement corrosion monitoring in common practice.
With this in mind an international task group formed to develop the specification B12 “Corrosion Monitoring of Reinforced and Prestressed Concrete Structures” published by the German Society for Non-Destructive Testing, DGZfP, spring 2018.
This paper will present the new specification B12 by highlighting the basic measurement principles and illustrating the potentials of corrosion monitoring for new and existing concrete structures by means of case studies.