The presentation is divided in two parts, each evaluates a different aspect of safety.
It starts with the analysis of consequences resulting from worst case ruptures of gas cylinders. The number of harmed persons and fatalities dependent from the pressure-volume product and the kind of stored gas. In parallel, there is a national accepted rule for accepted failure rates depending from this pV-product created by BAM. When combining both aspects it become clear that the pressure-volume product can be used as a good indicator for consequences. At a level of about 120 MPa m3 the maximum consequence starts to become catastrophic character. This shows the reason why the representatives of DIN insisted in limiting relevant pV-limits for tubes and cylinders to 1 Mio. bar litres.
The second part gives a raff overview on the parameters influencing the acceptance rates of borderline basic populations. This is added by some slides giving an idea for the improvement of the minimum burst requirement and finally completed by a proposal for improved acceptance criteria for the burst test.
The basic idea is: an increased pV-product of tubes has the be reflected by an increased safety level.
The presentation explains the intended way of BAM in tackling the safety issues in the project TAHYA.
The way how the term “safety” is used in TAHYA leads to the need for a more risk-based understanding of safety. Based on this, the Monte Carlo simulation is used to show where the weak points of current regulations are. Thus, a concept for optimization of relevant regulations, codes and standards will be elaborated during the project. For this purpose, it is helpful to improve the currently operated tool for Monte Carlo simulation, which will need additional data for monitoring the outcome. Strength data, that will be determined by BAM and the other partners during the already agreed test program can be used for this purpose without additional effort.