Grouted joint for integral composite frame bridges suitable for hot dip galvanizing
- Due to the corrosion resistance of carbon steel, bridge constructions are currently protected against corrosion by applied coating systems. These coating systems need to be renewed after approximately 25 50 years. Galvanized constructions without any welding areas at the construction site could be prepared as grouted joints and can be used without any renewing for about 100 years.
Autor*innen: | M. Mensinger, O. Fischer, F. Oberhaidinger, L. Stimmelmayer, Gino EbellORCiD, Martin BabutzkaORCiD |
---|---|
Dokumenttyp: | Vortrag |
Veröffentlichungsform: | Präsentation |
Sprache: | Englisch |
Jahr der Erstveröffentlichung: | 2022 |
Organisationseinheit der BAM: | 7 Bauwerkssicherheit |
7 Bauwerkssicherheit / 7.6 Korrosion und Korrosionsschutz | |
DDC-Klassifikation: | Technik, Medizin, angewandte Wissenschaften / Ingenieurwissenschaften / Ingenieurbau |
Freie Schlagwörter: | Bridge; Corrosion; Galvanized steel |
Themenfelder/Aktivitätsfelder der BAM: | Infrastruktur |
Veranstaltung: | Intergalva 2022 |
Veranstaltungsort: | Rome, Italy |
Beginndatum der Veranstaltung: | 20.06.2022 |
Enddatum der Veranstaltung: | 22.06.2022 |
Verfügbarkeit des Dokuments: | Datei im Netzwerk der BAM verfügbar ("Closed Access") |
Datum der Freischaltung: | 23.06.2022 |
Referierte Publikation: | Nein |
Eingeladener Vortrag: | Nein |