Das Suchergebnis hat sich seit Ihrer Suchanfrage verändert. Eventuell werden Dokumente in anderer Reihenfolge angezeigt.
  • Treffer 25 von 218
Zurück zur Trefferliste

The “Zero Leakgae” approach for landfill lining and capping systems

  • An approach to achieve “zero leakage” is discussed with respect to the experience in Germany, where strict regulations for landfill lining and capping systems have been developed and issued because of large environmental problems related to landfills that accumulated in the 1970’s and 1980’s. Using a thick, high quality HDPE geomembrane (GMB), which is installed free of residual waves and wrinkles in intimate contact with a compacted clay liner (CCL) or geosynthetic clay liner (GCL) of very low permeability, by a qualified, experienced, well equipped and properly third-party controlled installer and which are protected by heavy protection layers designed with respect to long-term performance of the GMB, may result in a liner or capping system of practically no leakage. This is demonstrated by analyzing results of measurements obtained from permanently installed leak detection systems in combination with HDPE GMBs. The survey is based on 32 German landfills with 1,276,500 m² ofAn approach to achieve “zero leakage” is discussed with respect to the experience in Germany, where strict regulations for landfill lining and capping systems have been developed and issued because of large environmental problems related to landfills that accumulated in the 1970’s and 1980’s. Using a thick, high quality HDPE geomembrane (GMB), which is installed free of residual waves and wrinkles in intimate contact with a compacted clay liner (CCL) or geosynthetic clay liner (GCL) of very low permeability, by a qualified, experienced, well equipped and properly third-party controlled installer and which are protected by heavy protection layers designed with respect to long-term performance of the GMB, may result in a liner or capping system of practically no leakage. This is demonstrated by analyzing results of measurements obtained from permanently installed leak detection systems in combination with HDPE GMBs. The survey is based on 32 German landfills with 1,276,500 m² of installed HDPE GMB.zeige mehrzeige weniger

Volltext Dateien herunterladen

  • Woehlecke_The Zero Leakgae Approach.pdf
    eng

Metadaten exportieren

Weitere Dienste

Teilen auf Twitter Suche bei Google Scholar Anzahl der Zugriffe auf dieses Dokument
Metadaten
Autor*innen:Andreas Wöhlecke
Koautor*innen:Werner Wolfgang Müller, C. Tarnowski, H. Zanzinger
Dokumenttyp:Vortrag
Veröffentlichungsform:Präsentation
Sprache:Englisch
Jahr der Erstveröffentlichung:2016
DDC-Klassifikation:Technik, Medizin, angewandte Wissenschaften / Ingenieurwissenschaften / Sanitär- und Kommunaltechnik; Umwelttechnik
Freie Schlagwörter:Deponieabdichtungen; Einbau; Kunststoffdichtungsbahnen; Schweißen
Geomembrane; Installation; Landfill sealing; Welding
Veranstaltung:GeoAmericas 2016 - 3rd Pan-American Conference on Geosynthtics
Veranstaltungsort:Miami Beach, Fl, USA
Beginndatum der Veranstaltung:10.04.2016
Enddatum der Veranstaltung:13.04.2016
Verfügbarkeit des Dokuments:Datei im Netzwerk der BAM verfügbar ("Closed Access")
Datum der Freischaltung:16.06.2016
Referierte Publikation:Nein
Eingeladener Vortrag:Nein
Einverstanden
Diese Webseite verwendet technisch erforderliche Session-Cookies. Durch die weitere Nutzung der Webseite stimmen Sie diesem zu. Unsere Datenschutzerklärung finden Sie hier.