Early stage elastic wave velocity of concrete piles
- The low-strain pile integrity testing method is used for quality control of new piles as well as length and integrity check for old piles. If no other methods for calibration are available, the accuracy and reliability of the techniques depend on a good estimation of the elastic wave velocity. In practice it is assumed that piles can be tested 7 days after casting and that the velocity is almost constant in all piles of one kind in a construction project. Recent measurements at the BAM test site in Horstwalde, Germany, showed that the 7 day criterion is not generally applicable.
Autor*innen: | Ernst NiederleithingerORCiD, Alexander Taffe |
---|---|
Dokumenttyp: | Zeitschriftenartikel |
Veröffentlichungsform: | Verlagsliteratur |
Sprache: | Englisch |
Titel des übergeordneten Werkes (Englisch): | Cement & concrete composites |
Jahr der Erstveröffentlichung: | 2006 |
Verlag: | Elsevier |
Verlagsort: | Barking, Essex |
Jahrgang/Band: | 28 |
Ausgabe/Heft: | 4 |
Erste Seite: | 317 |
Letzte Seite: | 320 |
Freie Schlagwörter: | Concrete piles; Foundation; Non-destructive testing; Pile integrity testing |
DOI: | 10.1016/j.cemconcomp.2006.02.013 |
ISSN: | 0958-9465 |
ISSN: | 1873-393X |
Verfügbarkeit des Dokuments: | Physisches Exemplar in der Bibliothek der BAM vorhanden ("Hardcopy Access") |
Bibliotheksstandort: | Sonderstandort: Publica-Schrank |
Datum der Freischaltung: | 19.02.2016 |
Referierte Publikation: | Ja |
Datum der Eintragung als referierte Publikation: | 06.12.2006 |