Das Suchergebnis hat sich seit Ihrer Suchanfrage verändert. Eventuell werden Dokumente in anderer Reihenfolge angezeigt.
  • Treffer 1 von 20
Zurück zur Trefferliste

Storage facilities at Sayda Bay

  • Within the framework of the G8 partnership, the German Ministry of Economics and Technology has been realizing a 300 EUR million project of the storage of decommissioned Russian nuclear submarines based on a German-Russian agreement. The main parts of the project are the construction of the long-term storage facility as well as a radioactive waste storage facility at Sayda Bay. Long-term interim storage facility for this particular case has a period of about 70 years. The Energiewerke Nord GmbH (EWN) under the technical controlling of BAM carried out the project management. Foremost in this presentation is the finalization of the long-term storage facility for nuclear submarine compartments and the planning and realization of the radioactive waste storage building with special emphases of the parts carried out by BAM. Because BAM staff cannot stay permanently on site, a random inspection of different topics was the bases for the activities of BAM. The key aspects of activities are theWithin the framework of the G8 partnership, the German Ministry of Economics and Technology has been realizing a 300 EUR million project of the storage of decommissioned Russian nuclear submarines based on a German-Russian agreement. The main parts of the project are the construction of the long-term storage facility as well as a radioactive waste storage facility at Sayda Bay. Long-term interim storage facility for this particular case has a period of about 70 years. The Energiewerke Nord GmbH (EWN) under the technical controlling of BAM carried out the project management. Foremost in this presentation is the finalization of the long-term storage facility for nuclear submarine compartments and the planning and realization of the radioactive waste storage building with special emphases of the parts carried out by BAM. Because BAM staff cannot stay permanently on site, a random inspection of different topics was the bases for the activities of BAM. The key aspects of activities are the long-term storage of the nuclear compartments, maintenance building, the decommissioning of the compartments and the transportation of the very heavy weight compartments (1600 metric tons). Details relating of the progress of the construction work as well as information about technical recommendations will also be briefly illustrated. Within this scope, problems and difficulties during the construction of the storage facility as well as logistical challenges including transportation of the reactor compartments will also be discussed.zeige mehrzeige weniger

Volltext Dateien herunterladen

  • STORAGE FACILITIES AT SAYDA BAY.pdf
    eng

Metadaten exportieren

Weitere Dienste

Teilen auf Twitter Suche bei Google Scholar Anzahl der Zugriffe auf dieses Dokument
Metadaten
Autor*innen:Anton Erhard, Volker Noack, Holger Völzke
Dokumenttyp:Beitrag zu einem Tagungsband
Veröffentlichungsform:Graue Literatur
Sprache:Englisch
Titel des übergeordneten Werkes (Englisch):52nd INMM Annual meeting (Proceedings)
Jahr der Erstveröffentlichung:2011
Herausgeber (Institution):Institute of Nuclear Materials Management (INMM)
Erste Seite:1
Letzte Seite:7
Freie Schlagwörter:Nuclear reactor compartments; Storage facility
Veranstaltung:52nd INMM Annual meeting
Veranstaltungsort:Palm Desert, CA, USA
Beginndatum der Veranstaltung:17.07.2011
Enddatum der Veranstaltung:21.07.2011
Verfügbarkeit des Dokuments:Datei im Netzwerk der BAM verfügbar ("Closed Access")
Datum der Freischaltung:19.02.2016
Referierte Publikation:Nein
Einverstanden
Diese Webseite verwendet technisch erforderliche Session-Cookies. Durch die weitere Nutzung der Webseite stimmen Sie diesem zu. Unsere Datenschutzerklärung finden Sie hier.