TY - JOUR A1 - Ruiz-Hervias, J. A1 - Simbruner, Kai A1 - Cristobal-Beneyto, M. A1 - Perez-Gallego, D. A1 - Zencker, Uwe T1 - Failure mechanisms in unirradiated ZIRLO® cladding with radial hydrides N2 - The purpose of this paper is to investigate the relationship between hydride morphology, in particular the presence of radial hydrides (RHs), stress state and failure mechanisms associated with the ring compression test (RCT). Samples of ZIRLO®cladding were pre-hydrided and subjected to thermo-mechanical treatments to precipitate long radial hydrides. The results show that the reorientation treatment was very successful. A considerable fraction of RHs was generated, the radial hydride continuity factor being around 80 to 90% of the wall thickness. The samples with reoriented hydrides were tested using the RCT at room temperature. Macroscopic brittle failure was observed with sudden load drops for displacements around 0.5 mm, with a calculated “offset strain”between 0.5 and 1%. Crack nucleation occurs in RHs located in regions with the highest values of hoop stress. These locations are the inner diameter of cladding at the vertical plane of the sample (12 and 6 o’clock positions) and the outer diameter at the horizontal plane (3 and 9 o’clock positions). Noticeable load drops in the RCT are associated with unstable crack propagation events through the radial hydride network, the crack front reaching up to 90% of the wall thickness in some cases. The failure micro-mechanism is quasi-cleavage in the hydrides and micro-void nucleation, growth and coalescence in the Zr matrix, with ductile tearing patches connecting neighboring hydrides. The main conclusion is that radial hydride metrics is not the only parameter that determines cladding failure in the presence of RHs, but the interaction between the location and continuity of RHs and the stress normal to the hydride (the hoop stress in this case). Consequently, if a radial hydride is located at a position within the cladding where the hoop stress is small, a crack will not be initiated easily in the RCT. KW - ZIRLO® KW - Cladding Embrittlement KW - Radial Hydrides KW - Failure Mechanism KW - Ring compression test PY - 2021 DO - https://doi.org/10.1016/j.jnucmat.2020.152668 SN - 0022-3115 VL - 544 SP - 152668 PB - Elsevier B.V. AN - OPUS4-52000 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Zencker, Uwe T1 - EURAD WP 8 (SFC) - Task 3: Behaviour of nuclear fuel and cladding after discharge N2 - The European Joint Programme on Radioactive Waste Management (EURAD) deals in work package (WP) 8 with Spent Fuel Characterization (SFC). Inspired by the EURAD activities, an international Coordinated Research Project (CRP) on SFC was established by the International Atomic Energy Agency (IAEA). The EURAD WP SFC participants are collaborating as a team on the IAEA CRP on SFC. The EURAD WP SFC project is divided into four tasks. Task 3 investigates the behaviour of nuclear fuel and cladding after discharge. The aim of these activities is to understand and describe the evolution of the cladding-pellet system and its ageing under conditions of extended interim storage, transportation and emplacement in a final disposal system. During an IAEA consultancy meeting, BAM as leader of Task 3 reported on the current status of the research work. T2 - IAEA Consultancy Meeting on the Coordinated Research Project on Spent Fuel Characterization CY - Online meeting DA - 28.06.2021 KW - Nuclear Fuel KW - Cladding KW - Spent Fuel Characterization KW - Extended Interim Storage KW - Final Disposal PY - 2021 AN - OPUS4-52909 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Weber, Mike A1 - Völzke, Holger A1 - Zencker, Uwe A1 - Hauer, Katharina A1 - Herz, A. A1 - Kreienmeyer, M. T1 - Aufbau eines Aufprallfundamentes mit reproduzierbaren Eigenschaften für Baumusterprüfungen von Abfallbehältern für das Endlager Konrad N2 - Abgeleitet aus den in Teil 3 der „Systemanalyse Konrad“ definierten Lastannahmen für den „untertägigen Anlagenbereich“ müssen Verpackungen, die der Abfallbehälterklasse I (ABK I) mit dem zusätzlichen Merkmal der störfallfesten (sf) Verpackung oder der ABK II zugeordnet werden, gemäß den „Endlagerungsbedingungen, Endlager Konrad“, nach einem „…Fall aus 5 m Höhe auf eine unnachgiebige Unterlage…“ bestimmten Anforderungen genügen. Eine nähere Beschreibung der Prüfeinrichtung sowie die Definition detaillierter Anforderungen an das Aufprallfundament erfolgen in der „Produktkontrolle, Endlager Konrad“: „Die Prüfeinrichtung, bestehend aus einer Hebeeinrichtung und einem Fundament ist so zu gestalten, dass der Fall des Prüfmusters in jeder beliebigen Aufprallorientierung aus 5 m Höhe, gemessen von der Unterkante des Prüfmusters zum Fundament, möglich ist. Das Fundament ist aus Beton der Mindestgüte B 35 herzustellen und muss so beschaffen und verankert sein, dass keine Zerstörung in zahlreiche kleinere Bruchstücke erfolgt und keine horizontale Verschiebung des Fundamentes oder seiner Teile auftritt. Maße und Masse des Fundaments müssen so beschaffen sein, dass der Einfluss des Baugrundes unter dem Fundament auf den Aufprallwiderstand vernachlässigbar ist.“ Im Rahmen der Bauartprüfung für Behälter zur Endlagerung radioaktiver Abfälle mit zu vernachlässigender Wärmeentwicklung im Endlager Konrad wird die Bundesanstalt für Materialforschung und -prüfung (BAM) von der Bundesgesellschaft für Endlagerung (BGE) als Sachverständige hinzugezogen und ist in der Regel auch mit der Durchführung der notwendigen Fallprüfungen auf dem Testgelände Technische Sicherheit der BAM (BAM TTS) einschließlich der Bereitstellung der benötigten Prüfeinrichtungen sowie des regelkonformen Aufprallfundamentes beauftragt. Der Prozess, beginnend von der Gewährleistung einer von allen Beteiligten als gültig bewerteten Fallprüfung bis hin zur abschließenden Bewertung und Interpretation der Versuchsergebnisse erfordert dabei u.a. eine sorgfältige Planung und Fertigung der für das Endlager Konrad repräsentativen Fundamentplatte und deren Ankopplung an einen Untergrund im Sinne der „Regulations for the Safe Transport of Radioactive Material“ wie er zum Beispiel auf den beiden Fallversuchsanlagen des BAM Testgelände Technische Sicherheit (BAM TTS) zur Verfügung steht. Um diese Anforderungen zu erfüllen muss zum einen der Erhalt der Integrität der Fundamentplatte beim Fallversuch durch eine geeignete Auswahl und kraftflussgerechte Anordnung der Stabstahl-Bewehrung sowie deren Verankerung garantiert und damit eine unzulässige Energieaufnahme durch Risse sowie eine unzulässige „… Zerstörung (der Fundamentplatte) in zahlreiche kleinere Bruchstücke …“, wie in [3] gefordert, verhindert werden. Außerdem ist zu gewährleisten, dass der Beton die Anforderungen an die vorgeschriebene Mindestgüte bzw. -festigkeit zum Zeitpunkt der Fallprüfung erfüllt, die Betonfestigkeit jedoch zur Vermeidung unnötig verschärfter Prüfrandbedingungen eine zu definierende Obergrenze nicht überschreitet. Ausgehend von dem 2009 im Rahmen der KONTEC veröffentlichten Wissensstand präsentiert die BAM im vorliegenden Beitrag die wesentlichen Ergebnisse der zwischenzeitlich bei der Planung und Durchführung von zahlreichen Fallprüfungen gewonnenen Erfahrungen bzgl. Spezifikation und Fertigung der für die Fallversuche notwendigen Fundamentplatten sowie deren Anbindung an den Untergrund. Neben den immer wieder notwendigen Anstrengungen zur Gewährleistung einer im Rahmen der Definition korrekten Betondruckfestigkeit am Tag der Fallprüfung wird die Anpassung der Bewehrungsführung an verschiedene Fallpositionen diskutiert. Zur Ergänzung des gültigen Regelwerks entsteht parallel zu diesem Dokument eine Fachnotiz, in der BGE und BAM die Vorgaben und Spezifikationen zur regelwerkskonformen Herstellung und Montage von Fundamentplatten für Fallprüfungen im Rahmen der Behälterbauartprüfungsverfahren für das Endlager Konrad zusammenfassen und veröffentlichen werden. Diese Fachnotiz soll detaillierte Vorgaben und Spezifikationen zur Planung, Beauftragung, Herstellung und abschließenden Prüfung eines solchen Fundamentes und dessen Anbindung an den Untergrund enthalten. Damit soll allen beteiligten Organisationen wie Antragstellern, Sachverständigen und BGE ein langfristig verlässlicher Leitfaden im Hinblick auf die Durchführung anforderungsgerechter Fallprüfungen unter definierten und reproduzierbaren Randbedingungen im Rahmen der Bauartprüfungsverfahren für das Endlager Konrad an die Hand gegeben werden. T2 - KONTEC 2021 CY - Dresden, Germany DA - 25.08.2021 KW - Aufprallfundament KW - Endlager Konrad KW - Fallprüfung PY - 2021 SP - 1 EP - 10 CY - Dresden AN - OPUS4-53372 LA - deu AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Weber, Mike A1 - Völzke, Holger A1 - Zencker, Uwe A1 - Hauer, Katharina A1 - Herz, A. A1 - Kreienmeyer, M. T1 - Aufbau eines Aufprallfundamentes mit reproduzierbaren Eigenschaften für Baumusterprüfungen von Abfallbehältern für das Endlager Konrad N2 - Abgeleitet aus den in Teil 3 der „Systemanalyse Konrad“ [1] definierten Lastannahmen für den „untertägigen Anlagenbereich“ müssen Verpackungen, die der Abfallbehälterklasse I (ABK I) mit dem zusätzlichen Merkmal der störfallfesten (sf) Verpackung oder der ABK II zugeordnet werden, gemäß den „Endlagerungsbedingungen, Endlager Konrad“ [2], nach einem „…Fall aus 5 m Höhe auf eine unnachgiebige Unterlage…“ bestimmten Anforderungen genügen. Eine nähere Beschreibung der Prüfeinrichtung sowie die Definition detaillierter Anforderungen an das Aufprallfundament erfolgen in der „Produktkontrolle, Endlager Konrad“ [3]: „Die Prüfeinrichtung, bestehend aus einer Hebeeinrichtung und einem Fundament ist so zu gestalten, dass der Fall des Prüfmusters in jeder beliebigen Aufprallorientierung aus 5 m Höhe, gemessen von der Unterkante des Prüfmusters zum Fundament, möglich ist. Das Fundament ist aus Beton der Mindestgüte B 35 herzustellen und muss so beschaffen und verankert sein, dass keine Zerstörung in zahlreiche kleinere Bruchstücke erfolgt und keine horizontale Verschiebung des Fundamentes oder seiner Teile auftritt. Maße und Masse des Fundaments müssen so beschaffen sein, dass der Einfluss des Baugrundes unter dem Fundament auf den Aufprallwiderstand vernachlässigbar ist.“ Im Rahmen der Bauartprüfung für Behälter zur Endlagerung radioaktiver Abfälle mit zu vernachlässigender Wärmeentwicklung im Endlager Konrad wird die Bundesanstalt für Materialforschung und -prüfung (BAM) von der Bundesgesellschaft für Endlagerung (BGE) als Sachverständige hinzugezogen und ist in der Regel auch mit der Durchführung der notwendigen Fallprüfungen auf dem Testgelände Technische Sicherheit der BAM (BAM TTS) einschließlich der Bereitstellung der benötigten Prüfeinrichtungen sowie des regelkonformen Aufprallfundamentes beauftragt. Der Prozess, beginnend von der Gewährleistung einer von allen Beteiligten als gültig bewerteten Fallprüfung bis hin zur abschließenden Bewertung und Interpretation der Versuchsergebnisse erfordert dabei u.a. eine sorgfältige Planung und Fertigung der für das Endlager Konrad repräsentativen Fundamentplatte und deren Ankopplung an einen Untergrund im Sinne der „Regulations for the Safe Transport of Radioactive Material“ [4], [5] wie er zum Beispiel auf den beiden Fallversuchsanlagen des BAM Testgelände Technische Sicherheit (BAM TTS) zur Verfügung steht. Um diese Anforderungen zu erfüllen muss zum einen der Erhalt der Integrität der Fundamentplatte beim Fallversuch durch eine geeignete Auswahl und kraftflussgerechte Anordnung der Stabstahl-Bewehrung sowie deren Verankerung garantiert und damit eine unzulässige Energieaufnahme durch Risse sowie eine unzulässige „… Zerstörung (der Fundamentplatte) in zahlreiche kleinere Bruchstücke …“, wie in [3] gefordert, verhindert werden. Außerdem ist zu gewährleisten, dass der Beton die Anforderungen an die vorgeschriebene Mindestgüte bzw. -festigkeit zum Zeitpunkt der Fallprüfung erfüllt, die Betonfestigkeit jedoch zur Vermeidung unnötig verschärfter Prüfrandbedingungen eine zu definierende Obergrenze nicht überschreitet. Ausgehend von dem 2009 im Rahmen der KONTEC veröffentlichten Wissensstand [6] präsentiert die BAM im vorliegenden Beitrag die wesentlichen Ergebnisse der zwischenzeitlich bei der Planung und Durchführung von zahlreichen Fallprüfungen gewonnenen Erfahrungen bzgl. Spezifikation und Fertigung der für die Fallversuche notwendigen Fundamentplatten sowie deren Anbindung an den Untergrund. Neben den immer wieder notwendigen Anstrengungen zur Gewährleistung einer im Rahmen der Definition korrekten Betondruckfestigkeit am Tag der Fallprüfung wird die Anpassung der Bewehrungsführung an verschiedene Fallpositionen diskutiert. Zur Ergänzung des gültigen Regelwerks entsteht parallel zu diesem Dokument eine Fachnotiz, in der BGE und BAM die Vorgaben und Spezifikationen zur regelwerkskonformen Herstellung und Montage von Fundamentplatten für Fallprüfungen im Rahmen der Behälterbauartprüfungsverfahren für das Endlager Konrad zusammenfassen und veröffentlichen werden. Diese Fachnotiz soll detaillierte Vorgaben und Spezifikationen zur Planung, Beauftragung, Herstellung und abschließenden Prüfung eines solchen Fundamentes und dessen Anbindung an den Untergrund enthalten. Damit soll allen beteiligten Organisationen wie Antragstellern, Sachverständigen und BGE ein langfristig verlässlicher Leitfaden im Hinblick auf die Durchführung anforderungsgerechter Fallprüfungen unter definierten und reproduzierbaren Randbedingungen im Rahmen der Bauartprüfungsverfahren für das Endlager Konrad an die Hand gegeben werden. T2 - KONTEC 2021 CY - Dresden, Germany DA - 25.08.2021 KW - Endlager Konrad KW - Fallprüfung KW - Aufprallfundament PY - 2021 AN - OPUS4-53374 LA - deu AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Simbruner, Kai A1 - Billone, M. C. A1 - Zencker, Uwe A1 - Liu, Y. Y. A1 - Völzke, Holger T1 - Brittle Failure Analysis of High-Burnup PWR Fuel Cladding Alloys N2 - The general aim of this research is the development of methods for predicting mechanical behavior and identification of limiting conditions to prevent brittle failure of high-burnup (HBU) pressure water reactor (PWR) fuel cladding alloys. A finite element (FE) model of the ring compression test (RCT) was created to analyze the failure behavior of zirconium-based alloys with radial hydrides during the RCT. An elastic-plastic material model describes the zirconium alloy. The stress-strain curve needed for the elastic-plastic material model was derived by inverse finite element analyses. Cohesive zone modeling is used to reproduce sudden load drops during RCT loading. Based on the failure mechanism in non-irradiated ZIRLO® claddings, a micro-mechanical model was developed that distinguishes between brittle failure along hydrides and ductile failure of the zirconium matrix. Two different cohesive laws representing these types of failure are present in the same cohesive interface. The key differences between these constitutive laws are the cohesive strength, the stress at which damage initiates, and the cohesive energy, which is the damage energy dissipated by the cohesive zone. Statistically generated matrix-hydride distributions were mapped onto the cohesive elements and simulations with focus on the first load drop were performed. Computational results are in good agreement with the RCT results conducted on high-burnup M5® samples. It could be shown that crack initiation and propagation strongly depend on the specific configuration of hydrides and matrix material in the fracture area. T2 - 26th International Conference on Structural Mechanics in Reactor Technology - SMiRT 26 CY - Potsdam, Germany DA - 10.07.2022 KW - Cladding Embrittlement KW - Cohesive Zone Modelling KW - Spent Nuclear Fuel KW - Ring Compression Test PY - 2022 SP - 1 EP - 10 AN - OPUS4-55434 LA - deu AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Zencker, Uwe A1 - Gaddampally, Mohan Reddy A1 - Völzke, Holger T1 - Fracture Mechanics Analysis of Spent Fuel Claddings during Long-Term Dry Interim Storage N2 - The prevention of brittle fracture of spent fuel claddings during long-term dry interim storage is based on experimental investigations, numerical analyses and assessment methods for predicting the mechanical behavior and determining limiting conditions. The ring compression test (RCT) is an established experimental method for characterizing cladding material. Test results for various high-burnup pressure water reactor zirconium-based fuel cladding alloys (e.g., ZIRLO®, M5®) are publicly available. To reduce the effort associated with irradiated samples in hot cells, it is helpful to perform studies on unirradiated surrogate cladding material. Based on such experimental data, load-displacement curves were numerically analyzed for selected cladding materials. In the presence of radial hydrides, a sample may suddenly fail by fracture even at small deformations. Noticeable load drops in the RCT occur associated to unstable crack propagation through the radial hydride network. The failure mechanism is quasi-cleavage in the hydrides and micro-void nucleation, growth, and coalescence in the zirconium matrix, with ductile tearing patches connecting neighboring hydrides. The failure process was simulated by cohesive zones controlled by the fracture energy and the cohesive strength. A modeling approach is presented in which the radial hydride morphology is taken into account. Based on the developed fracture mechanics approach with cohesive zone modeling, not only the deformation behavior but also the failure behavior of irradiated as well as unirradiated claddings with radial hydrides under RCT loading conditions can be adequately described. T2 - 20th International Symposium on the Packaging and Transportation of Radioactive Materials (PATRAM 2022) CY - Juan-les-Pins, France DA - 11.06.2023 KW - Extended Interim Storage KW - Nuclear Fuel Cladding KW - Numerical Failure Analysis KW - Ring Compression Test KW - Spent Fuel Characterization PY - 2023 SP - 1 EP - 8 AN - OPUS4-59146 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Zencker, Uwe T1 - Fracture Mechanics Analysis of Spent Fuel Claddings during Long-Term Dry Interim Storage N2 - The prevention of brittle fracture of spent fuel claddings during long-term dry interim storage is based on experimental investigations, numerical analyses and assessment methods for predicting the mechanical behavior and determining limiting conditions. The ring compression test (RCT) is an established experimental method for characterizing cladding material. Test results for various high-burnup pressure water reactor zirconium-based fuel cladding alloys (e.g., ZIRLO®, M5®) are publicly available. To reduce the effort associated with irradiated samples in hot cells, it is helpful to perform studies on unirradiated surrogate cladding material. Based on such experimental data, load-displacement curves were numerically analyzed for selected cladding materials. In the presence of radial hydrides, a sample may suddenly fail by fracture even at small deformations. Noticeable load drops in the RCT occur associated to unstable crack propagation through the radial hydride network. The failure mechanism is quasi-cleavage in the hydrides and micro-void nucleation, growth, and coalescence in the zirconium matrix, with ductile tearing patches connecting neighboring hydrides. The failure process was simulated by cohesive zones controlled by the fracture energy and the cohesive strength. A modeling approach is presented in which the radial hydride morphology is taken into account. Based on the developed fracture mechanics approach with cohesive zone modeling, not only the deformation behavior but also the failure behavior of irradiated as well as unirradiated claddings with radial hydrides under RCT loading conditions can be adequately described. T2 - 20th International Symposium on the Packaging and Transportation of Radioactive Materials (PATRAM 2022) CY - Juan-les-Pins, France DA - 11.06.2023 KW - Extended Interim Storage KW - Nuclear Fuel Cladding KW - Numerical Failure Analysis KW - Ring Compression Test KW - Spent Fuel Characterization PY - 2023 AN - OPUS4-59147 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Zencker, Uwe T1 - EURAD WP 8 Task 3 Overview: Behaviour of nuclear fuel and cladding after discharge N2 - Task 3 of Work package 8 (Spent Fuel Characterization) of the European Joint Programme on Radioactive Waste Management (EURAD) investigates the behaviour of nuclear fuel and cladding after discharge. The aim of the work is to understand and describe the be-haviour of spent nuclear fuel (SNF), irradiated cladding, fuel/cladding chemical interaction (FCCI) and ageing under conditions of extended interim storage, transportation and em-placement in a final disposal system. BAM contributes to the project as partner and leads Task 3. The presentation gives an overview of the project status, main achievements in experimental work and modelling studies, deviations from the plan, delays and challenges ahead. T2 - EURAD Work Package 8 (SFC) Annual Meeting CY - Wettingen, Switzerland DA - 31.10.2023 KW - Nuclear fuel KW - Cladding KW - Discharge PY - 2023 AN - OPUS4-59148 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - RPRT A1 - Caruso, Stefano A1 - Vlassopoulos, Efstathios A1 - Dagan, Ron A1 - Fiorito, Luca A1 - Herm, Michel A1 - Jansson, Peter A1 - Kromar, Marjan A1 - Király, Márton A1 - Leppanen, Jaakko A1 - Feria Marquez, Francisco A1 - Metz, Volker A1 - Papaioannou, Dimitrios A1 - Herranz, Luis Enrique A1 - Rochman, Dimitri A1 - Schillebeeckx, Peter A1 - Seidl, Marcus A1 - Hernandez Solis, Augusto A1 - Stankovskiy, Alexey A1 - Alvarez Velarde, Francisco A1 - Verwerft, Marc A1 - Rodriguez Villagra, Nieves A1 - Zencker, Uwe A1 - Žerovnik, Gasper T1 - EURAD - Work Package 8 - Deliverable 8.1 - State-of-the-art report N2 - A state-of-the-art (SOTA) review on characterisation of spent nuclear fuel (SNF) properties in terms of source term and inventory assessment (neutron, gamma-ray emission, decay heat, radionuclide inventory, elemental content) and in terms of out-of-core fuel performance (cladding performance and fuel integrity in view of the safety criteria for SNF interim storage, transport and canister packaging) using several numerical and experimental approaches and methodologies is presented. This SOTA report is a result of the spent fuel characterisation (SFC) work package as part of the European Joint Programme on Radioactive Waste Management (EURAD), which offers an overview of the status of knowledge in the field of SNF characterisation and assessment during the pre-disposal phase. The document aims to focus on the current safety-significant gaps and related challenges, providing a direct link to the goals of the mandated actors of EURAD. The report is expected to be used by all EURAD colleagues in their national programmes as a key resource for knowledge management programmes and to contribute to demonstrating and documenting the state-of-the-art. KW - Radioactive waste management KW - Spent fuel characterisation KW - Extended interim storage KW - Predisposal PY - 2022 UR - https://www.ejp-eurad.eu/publications/eurad-d81-state-art-report SP - 1 EP - 112 PB - Agence Nationale pour la Gestion des Déchets Radioactifs (ANDRA) CY - Châtenay-Malabry AN - OPUS4-59154 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Weber, Mike A1 - Völzke, Holger A1 - Zencker, Uwe A1 - Herz, A. A1 - Kreienmeyer, M. T1 - Design of a Drop Test Target with Reproducible Properties for Konrad Prototype Testing N2 - Beginning in 1976 the former iron ore mine Konrad was geologically investigated concerning its suitability as a location for a German final repository for low and intermediate level waste. After a comprehensive licensing procedure it was approved and is now being prepared and equipped for the planned start of storage in 2027. At the end of the 1980s, the requirements for waste containers for storage in this repository were defined for the first time on the basis of an incident analysis of the on-site handling procedures, beginning with the unloading of the packages after the arrival at the site up to the final positioning in the underground storage galleries. A 5-meter drop onto the rock ground of the mine was identified as the covering case for high mechanical requirements (ABK II container class). In contrast to the 9-meter drop according to the IAEA Regulations for the Safe Transport of Radioactive Material, the 5-meter drop is performed onto a hard but not essentially unyielding target. The container is typically not protected by an impact limiter. The requirements for a potential test facility are described in the regulations for the Konrad repository. The mechanical strength of the target is defined as a concrete strength equivalent to the identified properties of the rock ground of the mine. Since 1991 BAM has consistently used precast reinforced concrete slabs as target for drop tests in the framework of licensing procedures as well as in research projects. While the original design fulfilled the requirement for the integrity of the concrete slab in most cases, it failed when drop tests onto an edge of a container were performed. A redesigned concrete slab developed in a research project and suggested as a reference target in 2009 has been successfully used in Konrad licensing procedures since then. The paper gives a brief overview of the historical development and it describes BAM’s efforts and approaches to continuously guarantee a concrete slab of defined quality and to provide a test setup for valid drop tests from the applicants and the authorities view. T2 - PATRAM 2022, 20th International Symposium on the Packaging and Transportation of Radioactive Materials CY - Juan-les-Pins, France DA - 11.06.2023 KW - Target KW - Drop test KW - Final repository Konrad PY - 2023 SP - 1 EP - 11 AN - OPUS4-58563 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER -