TY - CONF A1 - Thiele, Marc A1 - Makris, Ralf ED - Aign, J. T1 - Reinforcement bar and reinforcement bar splicing systems under impact loading – Experimental tests and test specification N2 - Reinforced concrete is a widely used material for power generation structures, where load scenarios like impact loadings need to be considered. In this context mechanical splicing systems for the connection of reinforcement bars are of specific interest and impact resistance for the splicing systems has to be verified. High speed tensile tests need to be performed on splicing systems for reinforcement bars to confirm the capability of the coupler to resist impact loading. Furthermore, the ability of the reinforcement steel to dissipate energy by ductile behaviour with pronounced plastic strains should be confirmed by these tests. During the last decades comprehensive experiences were developed at BAM performing high speed tensile tests on reinforcement bars as well as on several splicing systems. For the lack of available standards defining these tests in detail an appropriate test procedure was developed and continuously optimized during this period at BAM. The test procedure is partially based on testing principles adapted from available standards. The main intention behind this test procedure is to perform high-speed tensile tests with a specific constant strain rate generated at the specimen. Furthermore, main objective was to establish a procedure to guarantee the comparability of test results for different diameter of reinforcement as well as for different types of couplers. Besides the pure execution of the high-speed tensile tests, the test specification also declares how to evaluate the measurements and the test results. Finally, some typical results will be presented in this contribution. T2 - SMIRT 26 CY - Potsdam, Germany DA - 10.07.2022 KW - Impact KW - Coupler systems KW - High-speed KW - Reinforcement PY - 2022 SP - 1 EP - 10 AN - OPUS4-55422 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - GEN A1 - Thiele, Marc A1 - Makris, Ralf T1 - Specification for high-speed tensile tests on reinforcement bar coupler systems N2 - This document presents the specification for the execution and evaluation of high-speed tensile tests on reinforcement bar coupler systems. This specification was developed at BAM - Bundesanstalt für Materialforschung und -prüfung (Federal Institute for Materials Research and Testing, Germany) - following test principles from related international standards. The present document represents the latest status of the test specification. It is noted that until 2010 the test procedure was characterised on a test velocity based on L0. In an improved test conception and after intensive investigations in cooperation with industry partners, this procedure has been updated to consider instead a test velocity based on Lr, since this warrants more comparable and meaningful results. KW - Test specification KW - Coupler systems KW - High-speed KW - Tensile test KW - Reinforcement PY - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:kobv:b43-525075 SP - 1 EP - 29 PB - Bundesanstalt für Materialforschung und -prüfung (BAM) CY - Berlin ET - V01 AN - OPUS4-52507 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER -