TY - CONF A1 - Auersch, Lutz T1 - Damage detection by flexibility functions and quasi-static moving load tests N2 - The contribution shows measurement examples of cars, floors, foundations, railway tracks, a footbridge, and a railbridge. Vibrations may include modes and waves. Namely in soil-structure interaction, modes are damped, shifted and prevented so that alternatives for the modal analysis are necessary: The approximation of the whole spectrum (flexibility function) and of the whole train passage (moving-load response). T2 - Symposium Emerging Trends in Bridge Damage Detection, Localization and Quantification CY - Luxembourg, Luxembourg DA - 05.05.2023 KW - Flexibility KW - Movin load test KW - Frequency response function KW - Cars KW - Floors KW - Foundations KW - Railway tracks KW - Footbridge KW - Railbridge KW - Damage detection PY - 2023 AN - OPUS4-57951 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Auersch, Lutz T1 - Train-induced ground vibrations – The emission and transmission from tunnel and surface lines N2 - Train-induced ground vibrations are quite different for tunnel and surface lines. The excitation of the track and ground vibration by the vehicle-track-soil interaction maybe influenced by the stiffer track support of the tunnel invert. The excited waves are propagating on a different path compared to the surface line. The wave propagation in the interior of the soil is calculated by a wavenumber integral in a similar way as the propagation along the surface and a general reduction of < 0.5 has been found. An additional reduction has been found because of the missing Rayleigh wave. The different excitation of tunnel lines is analysed theoretically by the combined finite-element boundary-element method and some results about the influencing tunnel and soil parameters will be shown. Measurements have been made at the Mühlberg-Tunnel in Germany. The vibrations of the train, the track and the soil have been measured simultaneously at the tunnel and a nearby surface line. Spectra will be shown for different train speeds between 60 and 160 km/h. A clear reduction effect for the tunnel line compared to the surface line has been observed in a specific (train-speed-dependent) frequency range. This agrees well with the observations of other research institutes. The mid-frequency tunnel-surface reduction seems to be a consequence of the stiffer track structure which leads to a wider distribution of the axle loads. Therefore, the axle impulses due to the train passage are longer and have a lower frequency content. This will have an effect on the ground vibrations at some distance which are present in case of an irregular transmission path through a ballast and soil with varying stiffness. A similar reduction effect can also be found for other track forms where the axle impulses are distributed on a longer track segment, for example slab tracks, tracks with under ballast plates, under ballast mats or under sleeper pads. T2 - 29th International Congress on Sound and Vibration (ICSV29) CY - Prague, Czech Republic DA - 09.07.2023 KW - Ground vibration KW - Railway tunnel KW - Layered soil KW - Surface-tunnel reduction KW - Measurements PY - 2023 AN - OPUS4-57956 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Auersch, Lutz T1 - Impacts between different drop masses and different targets in different scales N2 - The Federal Institute of Material Research and Testing has performed many impact tests from very small laboratory tests to very big “free-field” tests with heavy containers on stiff foundations. The first measurements have been done on a big foundation where it should be guaranteed that the foundation is rigid and the container is tested properly. Later on, a smaller drop test facility has been built on the ground inside an existing building. It had to be controlled by prediction and measurements that the drop test will not damage the building. Tests from different heights on soft, medium, and stiff targets have been done to find out rules which allow to identify acceptable and unacceptable drop tests. Later on, the biggest drop test facility has been built for masses up to 200 t. It was necessary for the design of the foundation to estimate the forces which oc-cur during the drop tests. In addititon, the acceptable tests should be selected and controlled by measurements where the impact duration is important. Dif-ferent sensors, accelerometers, accelerometers with mechanical filters, geo-phones (velocity transducers), strain gauges, and pressure cells have been ap-plied for these tasks. Signal transformations and model calculations have been used to check and understand the dynamic measurements. The simplest law is the conservation of the momentum which is a good approximation if the impact is short. If the soil under the foundation has an influence on the deceleration of the container, the maximum foundation velocity is lower than the simple esti-mation. T2 - 10th International Conference on Experimental Vibration Analysis for Civil Engineering Structures CY - Milano, Italy DA - 30.08.2023 KW - Drop test KW - Vibration measurements KW - Container loading KW - Foundation load PY - 2023 AN - OPUS4-58504 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Auersch, Lutz A1 - Song, Jiaojiao T1 - Analysis of intact and damaged (floating) slab tracks by finite-element boundary-element models and by measurements N2 - The damage detection and repair control have become important tasks for slab tracks. Different intact and damaged slab tracks have been investigated theoretically and experimentally for train passages and hammer impacts. The following damages have been considered: The loss of contact between the sleeper and the track slab, between the track slab and the base slab, and between the base slab and the base layer. At first, a slab track with a gap between the track slab and the base layer has been calculated by the combined finite-element boundary-element method which correctly incorporates the behaviour of the infinite soil. The basic results are the track displacements of the rail, the track slab, and the base layer along the track which are caused by a single axle load. These solutions are properly superposed for to get the complete train load. The influence of track and soil parameters and of the track damage has been analysed. For the intact track, the compliance of the soil is dominant whereas the track bending stiffness becomes more important for the damaged track. By comparing the calculated results with the measurements, the length of the gap could be quantified. A slab track with a loose sleeper (without contact to the supporting track slab) was analysed by the transfer function between the displacements and the hammer force (receptance functions) where a resonance appeared in case of the damage. Differences between the different track elements confirmed the detection of the damage. A floating slab track with a thin rubber layer has been investigated for a possible gap between the base slab and the base layer. The behaviour of the intact track has been calculated by a wavenumber-domain method, and the same behaviour has been found in the measurements at several track sections, indicating that there is no damage. Finally, a floating slab track with steel springs and viscous fluid dampers has been measured in the Tongji laboratory. The modes of the floating track slab and the transfer function with corresponding resonances have been calculated and successfully compared with results from wheelset drop tests. T2 - 3rd International Conference of Rail Transportation CY - Shanghai, China DA - 07.08.2024 KW - Slab tracks KW - Damage KW - Vibration measurements KW - Finite-element boundary-element method PY - 2024 AN - OPUS4-61227 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Baeßler, Matthias T1 - Maßgeblicher Einfluss geotechnischer Interaktionsprobleme auf den Tragwerksentwurf: Zwei spezielle Fallbeispiele N2 - Geotechnische Interaktionsprobleme können den Entwurf eines Tragwerks maßgeblich beeinflussen. Anhand zweier Fallbeispiele - dem Schotteroberbau auf Brücken im HGV und der Installation großer Monopiles - werden aktuelle Fälle aus dem Forschungsrepertoire der BAM vorgestellt. T2 - Geotechnische Seminarreihe am IBF des KIT CY - Karlsruhe, Germany DA - 23.01.2025 KW - Schotter auf Brücken im Hochgeschwindigkeitsverkehr KW - Pfahlfussbeulen KW - Beschleunigungsgrenzwert KW - Rammung KW - Monopiles PY - 2025 AN - OPUS4-62451 LA - deu AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Baeßler, Matthias T1 - OWEC repowering from a structural engineering and research perspective N2 - A significant number of new wind farms has to be installed and, at the same time, existing wind farms reaching the end of their planned life need to be reused efficiently to ensure that the ambitous goals for deploying offshore wind are met. Some relevant reuse alternatives for offshore wind farms are lifetime extension, repowering utilizing existing substructures and full replacement. In this presentation - starting from experience gained from extending the lifetime of the of the U1 metro viaduct in Berlin - we discuss end-of-life decision making in offshore wind. We focus particularly on issues concerning substructures and highlight existing challenges and opprtunities in research and development. T2 - RWE RePowering Event CY - Wilhelmshaven, Germany DA - 10.10.2023 KW - Offshore wind KW - End-of-life decision making KW - Repowering KW - Substructures PY - 2023 AN - OPUS4-58632 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Baeßler, Matthias T1 - Recap: Main Results of the BUMP Study and Relevance for VERBATIM N2 - Zusammenfassung des Forschungsprojekts BUMP hinsichtlich der Relevanz für das Projekt VERBATIM N2 - BUMP had been a theoretical prestudy on open issues for the pile tip buckling of large monopiles. The presentation summarizes the main results and considers the impact for the ongoing VERBATIM project. VERBATIM is set up as a mainly experimental verification project for pile buckling. T2 - Kick-Off Projekt VERBATIM CY - BAM, Berlin, Germany DA - 23.01.2020 KW - Buckling piles circular shells PY - 2020 AN - OPUS4-50515 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Baeßler, Matthias T1 - Dynamisches Verhalten und Überwachung des Großen Fallturms der BAM in Horstwalde N2 - Falltürme sind Bauwerke, die als Versuchsanlagen sehr speziellen, impulsartigen Belastungen ausgesetzt sind. Am Fallturm auf dem Testgelände Technische Sicherheit (TTS) der BAM wurde bei Routineinspektionen eine Abnahme der strukturellen Integrität in Form von Vorspannungsverlusten in den Bolzen der Stahlverbindungen festgestellt. Um ein Verständnis für die zugrundeliegenden Trag- und Schädigungsmechanismen zu erlangen, wurde ein umfassendes Structural Health Monitoring (SHM) System geplant und am Bauwerk installiert unter Nutzung von digitalen Bauwerksmodellen. Für die Auslegung des Überwachungssystems, insbesondere aber zur Unterstützung der Untersuchung des Schädigungsprozesses, wurden Finite-Elemente-Modelle erstellt. Um sicherzustellen, dass die FE-Modelle das reale Tragwerksverhalten mit ausreichender Genauigkeit abbilden, mussten sie jedoch in Bezug auf die gemessenen Antworten des Tragwerks kalibriert werden. Der vorliegende Beitrag beschreibt experimentelle und numerische Untersuchungen zur Identifizierung des strukturellen Systems des Stahlrohrgitterturms in Vorbereitung einer Überwachungskampagne. Die Auswertung von gemessenen Schwingungen unter ambienter Anregung ermöglichte die Identifizierung der Eigenfrequenzen mehrerer globaler Schwingungsmoden des Fallturms. Zur Modellvalidierung wurde zunächst eine Sensitivitätsanalyse durchgeführt, um die Parameter mit dem größten Einfluss zu ermitteln. Anschließend wurde ein evolutionärer Algorithmus (EA) zur Optimierung nach dem Prinzip der Minimierung der Differenzen zwischen gemessenen und simulierten charakteristischen Antworten eingesetzt. Das aktualisierte Modell wurde schließlich an der dynamischen Reaktion der Turmstruktur infolge einer realen Falltest-induzierten Stoßbelastung validiert. Die Ergebnisse zeigten eine gute Übereinstimmung zwischen numerischen und experimentellen Ergebnissen. N2 - Drop test towers are structures subjected to very specific dynamic loadings. At the drop test tower at the Test Site Technical Safety (TTS) of BAM routine inspections revealed a decline of structural integrity in form of loss of pretension in bolts of structural steel connections. To get an understanding about the underlying damage mechanisms as well as to assure the structural safety in operation, a multifaceted Structural Health Monitoring (SHM) system was planned and installed at the structure with the help of digital models. For planning the monitoring system but especially for supporting the investigation of the damaging process finite element models are deployed. Though, to ensure the capability of the FE model to reproduce the real structural behavior in sufficient accuracy, it needs to be calibrated in respect to measured responses of the structure. The present contribution describes experimental and numerical investigations to identify the structural system of the steel tube lattice tower in preparation of the monitoring campaign. An ambient vibration test allowed the identification of the natural frequencies of several global vibrational modes of the drop test tower. For model updating first a sensitivity analysis is applied to identify the most influencing parameter. In succession a genetic algorithm was applied for optimization in the sense of minimization of the difference between measured and simulated characteristic responses. The updated model is finally validated on the dynamic response of the tower structure to a real drop test induced impact loading. The results showed a good agreement between numerical and experimental results though the robustness of the simulation should be improved by more sophisticated numerical modelling. T2 - 7. VDI-Fachtagung Baudynamik CY - Würzburg, Germany DA - 27.04.2022 KW - Großer Fallturm Horstwalde KW - Structural Health Monitoring KW - Belastungsversuch KW - Modalanalyse KW - Schwingungsdynamik KW - Finite Elemente Simulation PY - 2022 AN - OPUS4-55470 LA - deu AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Baeßler, Matthias T1 - Anwendungsszenarien und Referenzanwendungen sensorbasiertes Monitoring N2 - Präsentiert wird eine Kategorisierung von Anwendungsszenarien für sensorbasiertes Monitoring und die Planung für die Referenzbauwerke mit SHM-Anwendungen. Im Rahmen des Forschungsvorhabens Aistec Pro werden Anwendungsszenarien für sensorbasiertes Monitoring kategorisiert und in Referenzanwendungen umgesetzt. Der Vortrag gibt einen Überblick über die abgeschlossene Planung. T2 - Jahrestreffen Verbund Aistec-Pro CY - Bonn, Germany DA - 17.09.2025 KW - SHM KW - Monitoring KW - Brückensicherheit KW - Aistec Pro PY - 2025 AN - OPUS4-64124 LA - deu AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Baeßler, Matthias T1 - Numerical Modelling of Local Pile Deformations and Buckling incorporating the Pile-Soil-Interaction N2 - Pile Tip Buckling and Buckling of embedded piles both depend very much on the pile-soil-interaction and its modelling. The presentation gives an overview about current problems and research activities in the light of the development of numerical models. T2 - WESC Wind Energy Science Conference CY - Hannover, Germany DA - 25.05.2021 KW - Offshore Wind Energy Converter KW - Pile Foundation KW - Monopile Buckling KW - Pile Tip Buckling PY - 2021 AN - OPUS4-53033 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Baeßler, Matthias T1 - Introduction to the Workshop Life Time Extension N2 - The article introduces the topic of life time extension for offshore wind turbines. On the one hand, analogies are drawn with the topic of old steel bridges. On the other hand, potential regulatory issues and minimum requirements are discussed. T2 - Workshop Offshore Wind CY - Berlin, Germany DA - 26.02.2025 KW - Life Time Extension KW - Offshore Wind PY - 2025 AN - OPUS4-62640 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Baeßler, Matthias T1 - Large Monopiles: Experimental and numerical investigation of monopile tip buckling during installation as well as of local pile buckling under operational conditions N2 - The research project Verification of Buckling Assessment and Behaviour in Large Monopiles (VERBATIM) focuses on challenges arising due to the ongoing increase of dimensions of monopiles as foundation for offshore wind turbines. This project is focused on two main topics: - Monopile tip buckling during pile installation - Local buckling of embedded piles during operation It is known from previous investigations and experiences in practice that large deformations of a monopile tip during offshore installation works can occur. These large deformations initiated at the tip of the monopile are commonly referred to as “pile tip buckling”. Own research focuses on optimising monopile dimensions to reduce the cost of monopile foundations for offshore wind turbines while preventing pile tip buckling. Buckling of embedded cylindrical shells for offshore structures is a common engineering task. Structures can be analysed using standard software and have been done so in recent studies e.g., Gottschalk. However, the trend towards larger monopile and optimised structures has led to a fundamental need for better and verified models. A main challenge is the submodelling of the structure-soil-interaction. Developing such complex models is one main goal of the VERBATIM project. For both main topics model tests were performed at the laboratories of BAM and TU Berlin. These experimental results were used to verify related numerical models and simulations. T2 - WindEurope CY - Copenhagen, Denmark DA - 25.04.2023 KW - Monopiles KW - Tip Buckling KW - Pile Buckling KW - Foundations KW - Offshore KW - Windenergy PY - 2023 AN - OPUS4-57405 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Baeßler, Matthias T1 - On the Reassessment of Bridge Superstructure Vibrations for High-Speed Traffic N2 - The acceleration thresholds of bridge superstructures remain criti-cal for designing and reassessing railway bridges on high-speed lines, with ballasted track systems historically limited to 3.5 m/s² vertical accelerations due to destabilization risks. As part of the European InBridge4EU project, this study addresses methodological uncertainties in linking vertical bridge vibrations to lateral track creep—a key focus area for modernizing assess-ment protocols. A comparative analysis of two acceleration postprocessing methods (peak identification vs. fatigue-derived rainflow counting) as part of a recently proposed framework was conducted using an example bridge and train combination. Results demonstrate that rainflow counting yields more conservative creep estimates with the bulk of cumulative vibration-induced creep attributable to accelerations exceeding 3 m/s². However, discretizing acceleration ranges into 1 m/s² bins introduced significant errors compared to continuous cycle data, highlighting sensitivity to analysis parameters. These findings underscore the complexity of reconciling laboratory-derived harmonic vibration models with real-world bridge dynamics, where non-uni-form acceleration patterns dominate. The research directly informs ongoing efforts to refine standardized criteria for ballasted track stability, particularly through the InBridge4EU project's systematic re-evaluation of vibration lim-its and their engineering implications. By quantifying discrepancies between computational approaches, this work advances the development of robust protocols for predicting track degradation under high-speed operational loads. T2 - 11th International Conference on Experimental Vibration Analysis for Civil Enginering Structures (EVACES 2025) CY - Porto, Portugal DA - 02.07.2025 KW - Infrastructure KW - Railway bridges KW - Ballasted track KW - Railway bridge dynamics KW - Rainflow counting PY - 2025 AN - OPUS4-63658 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Baeßler, Matthias T1 - Review of Ballasted Track Destabilization on Shake Table Tests N2 - Shake table tests have been used for a long time to understand the densification and fluidization of granular materials. While purely vertical shaking is quite unlikely to be found in vibration analysis when it comes to granular materials as soils, it has been found that the vertical vibration of railway bridge support structures can affect the fabric of the ballasted track on top. Starting from the experience at French railway lines with destabilizing track conditions on short bridges in high speed lines in the 1990s, various shake table test configurations have been used to investigate the destabiliza-tion of ballast at high acceleration levels. This article describes the effects of the variously investigated dynamic excitations of railway bridges on the bal-lasted track itself. T2 - 11th International Conference on Experimental Vibration Analysis for Civil Enginering Structures (EVACES 2025) CY - Porto, Portugal DA - 02.07.2025 KW - Railway bridge dynamics KW - Acceleration limit KW - Ballast destabilization KW - Shake table tests PY - 2025 AN - OPUS4-63659 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Baeßler, Matthias T1 - On potentials and challenges of physics-informed SHM for civil engineering structures N2 - Physics-informed structural health monitoring, which incorporates realistic physical models of material behavior, structural response, damage mechanisms, and aging processes, offers a promising framework to enhance monitoring capabilities and inform operation and maintenance planning. Nevertheless, the technical challenges and model requirements associated with this approach are highly context-dependent and can vary significantly across different applications. The presentation focusses on two case studies that highlight challenges and progress in Physics informed SHM. T2 - SHMII-13 CY - Graz, Austria DA - 01.09.2025 KW - SHM KW - Physics informed KW - Hydrogen Stress Corrosion Cracking PY - 2025 AN - OPUS4-64326 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Baeßler, Matthias A1 - Aubram, Daniel T1 - Vorstellung OWA VERBATIM N2 - Das Risiko von Pfahlfussbeulen ist ein wesentlicher Grund für hohe Pfahlwandstärken bei Monopiles. Das Projekt VERBATIM - Verifikation des Beulnachweises und –verhaltens großer Monopiles zielte darauf ab, Beulphänomene zu untersuchen, die sich sowohl auf die plastischen Verformungen der Pfahlspitze während der Installation als auch auf das Beulen des eingebetteten Pfahls in der Nähe des Seebodens beziehen. Auf der Basis aufwändiger Versuche wurden numerische Modelle entwickelt und validiert. Dies ermöglicht ein besseres Verständnis des Beulverhaltens, um die Wanddicke zu reduzieren, was Kosteneinsparungen bei der Stahlmenge sowie die Entwicklung sicherer und optimierter Strukturen erlaubt. Die bisherigen Designverfahren konnten die erfolgreiche Installation der Monopiles gewährleisten. Da die Größe von Monopiles jedoch stetig zunimmt, wird die Entwicklung verbesserter Designverfahren für sichere und kostengünstige Fundamente immer wichtiger. Der Rückenwind-Vortrag gibt eine Übersicht zu den durchgeführten Untersuchungen und Ergebnissen T2 - Rückenwind Aktuelles aus der Windenergieforschung (PTJ) CY - Online meeting DA - 21.06.2024 KW - Offshore Windenergy Pile Buckling PY - 2024 AN - OPUS4-60349 LA - deu AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Baeßler, Matthias A1 - Balscheit, Hagen A1 - Schepers, Winfried A1 - Victor, Albrecht A1 - Daryaei, Reza A1 - Bianco, Marcelo A1 - Starost, Christina T1 - Close-out Webinar OWA VERBATIM N2 - The risk of pile base buckling is a major reason for high pile wall thicknesses in monopiles. The VERBATIM project - Verification of the buckling detection and behaviour of large monopiles - aimed to investigate buckling phenomena related to both the plastic deformation of the pile tip during installation and the buckling of the embedded pile near the seabed. Numerical models were developed and validated on the basis of extensive tests. This enables a better understanding of the buckling behaviour in order to reduce the wall thickness, which allows cost savings in the amount of steel and the development of safer and optimised structures. The previous design procedures were able to ensure the successful installation of the monopiles. However, as the size of monopiles continues to increase, the development of improved design methods for safe and cost-effective foundations is becoming increasingly important. The presentation provides an overview of the investigations carried out and the results. T2 - Webinar Carbon Trust Offshore Wind Accelerator CY - Online meeting DA - 22.05.2024 KW - Offshore Windenergy Pile Buckling PY - 2024 AN - OPUS4-60348 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Baeßler, Matthias A1 - Cuéllar, Pablo A1 - Schepers, Winfried T1 - VERBATIM: Project Introduction and Large Scale Experiments N2 - The presentation summarizes the scope of the joint project VERBATIM on buckling of large Monopiles. The presented work from the authors focusses on the experimental field tests of large predented piles during driving and a numerical investigation on the observed buckling behaviour. T2 - Colloquium „Buckling of Offshore Wind Energy Structures“ CY - Berlin, Germany DA - 14.02.2024 KW - Buckling KW - Offshore KW - Wind Energy Structures KW - Monopiles KW - Pile-Tip-Buckling PY - 2024 AN - OPUS4-59535 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Baeßler, Matthias A1 - Eichner, Lukas A1 - Weise, Sigurd T1 - Digital building management for OWEC-structures N2 - The presentation summarizes the data management and Digital modeling processes in the recurring inspection of wind turbines as developed in DiMoWind-Inspect. T2 - Windforce 2024 CY - Bremerhaven, Germany DA - 10.06.2024 KW - DiMoWind RDS-PP Maintenance Digital Twin Offshore Wind Energy PY - 2024 AN - OPUS4-60351 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Baeßler, Matthias A1 - Haake, Gerrit T1 - ReNEW - Entscheidungstools für die Nutzungsverlängerung und das Repowering von Windenergieanlagen N2 - Der Vortrag gibt einen Überblick über gängige Nachnutzungskonzepte, die im Rahmen des Forschungsvorhabens ReNEW untersucht werden. Hierzu wir eine probabilistisches Entscheidungsmodell eingeführt. Die Möglichkeiten von Bauwerksertüchtigungen werden erörtert. T2 - RAVE ROWD Workshop 2024 CY - Hannover, Germany DA - 10.12.2024 KW - Windenergieanlagen KW - Bauwerksertüchtigung KW - Offshore-Windparks KW - Repowering PY - 2024 AN - OPUS4-62237 LA - deu AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER -