TY - CONF A1 - Rabe, Frederik A1 - Löhnert, Andrea A1 - Knaust, Christian A1 - Thöns, Sebastian T1 - Numerical quantification of fire smoke toxicity in tunnels N2 - Vehicle fires in tunnels can have catastrophic consequences for the road users, the property and traffic inffastructure. To support an evacuation planning, this study simulates the fire smoke toxicity and the smoke layer of a vehicle fire in a full-size test tunnel. The three dimensional prediction of the fire smoke toxicity in the test tunnel is realized by implementing the Fractional Effective Dose and the Fractional Summation concept in a CFD environment. The developed model facilitates to calculate fire scenarios for various types of tunnels and to quantify the hazard e.g. during an evacuation scenario. T2 - ISAVFT 15 - 15th International symposium on aerodynamics, ventilation and fire in tunnels CY - Barcelona, Spain DA - 18.09.2013 KW - Toxicity KW - Fire KW - Smoke KW - Tunnel KW - FED KW - Fractional effective dose PY - 2013 SN - 978-1-85598-137-9 SP - 203 EP - 215 AN - OPUS4-29719 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Berchtold, Florian A1 - Thöns, Sebastian A1 - Knaust, Christian A1 - Rogge, Andreas T1 - Review of road tunnel risk assessment - common aspects? N2 - Safety measures like tunnel emergency Ventilation Systems cause high financial costs. Hence, safety measures have to be chosen with the focus on the expected reduction of the consequences like fatalities or damage on structures and in conjunction with the investments. Since 2004, the European directive EU 2004/54/EC proposes therefore the application of risk assessments. Because the EU directive provides only few legal requirements on risk assessments, the methodologies developed on this basis have large differences. After one decade of intensive research, the comparative study now highlights common aspects and differences of several methodologies. T2 - 6th International symposium on tunnel safety and security CY - Marseille, France DA - 12.03.2014 KW - Tunnel KW - System KW - Risk assessment KW - Fire KW - Safety KW - Comparative study PY - 2014 SP - 669 EP - 670 AN - OPUS4-31256 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER -