TY - CONF A1 - Rohrmann, Rolf A1 - Said, Samir A1 - Schmid, Wolfgang A1 - Thöns, Sebastian A1 - Bicker, S. A1 - Rücker, Werner ED - De Roeck, G. ED - Degrande, G. ED - Lombaert, G. ED - Müller, G. T1 - Results from monitoring and assessment of offshore wind turbines N2 - To ensure a high operational reliability of offshore wind turbines (OWEC) with economically acceptable repair and maintenance efforts, comprehensive diagnosis and supervision concepts are required. Automatic monitoring Systems will be an essential part of such concepts. Because of the fact, that during Operation there will be static and dynamic interaction between the components ‘structure’, ‘machinery’ and ‘blades’ it is necessary to develop the monitoring techniques in an overall concept. These monitoring Systems are supposed to be applied for the design and testing as well as for the Operation and maintenance phases. The knowledge of the dynamic behavior of wind turbines is important both for the design and for a safe Operation. The available monitoring data from a period of three years, allow first conclusions on the long-term Operation of such Systems in terms of quality requirements to the instrumentation to the structure and the rotor blades T2 - EURODYN 2011 - 8th International conference on structural dynamics CY - Leuven, Belgium DA - 04.07.2011 KW - Integrated monitoring system KW - Offshore wind turbines KW - Structural assessment KW - Limit values KW - Measurement hardware KW - Data management KW - Embedded FBG sensors KW - Data analysis KW - Damage detection KW - Rotor blades PY - 2011 SN - 978-90-760-1931-4 IS - MS25 SP - 3450 EP - 3456 AN - OPUS4-24293 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Rohrmann, Rolf A1 - Thöns, Sebastian A1 - Rücker, Werner A1 - Bicker, S. A1 - Said, Samir A1 - Schmid, Wolfgang T1 - Structural investigations and monitoring results on a prototype of offshore wind turbines of multibrid M5000 series N2 - The concept and technical details of the implementation of the developed integrated monitoring system within the IMO-WIND project are presented. The tasks of the components of the system and its requirements are described. Selected results from the continuous monitoring during operation of the plant M5000_2 regarding the task design verification and dynamic structural analysis are given. T2 - DEWEK 2010 - 10th German wind energy conference CY - Bremen, Germany DA - 2010-11-17 KW - Integrated monitoring system KW - Offshore wind turbines KW - Design verification KW - Structural assessment KW - Limit values KW - Load transfer KW - Data management KW - Dynamic analysis KW - Rotor blades KW - Embedded sensors PY - 2011 IS - S03 SP - 1 EP - 5 PB - DEWI GmbH AN - OPUS4-23712 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER -