TY - CONF A1 - Rohrmann, Rolf A1 - Rücker, Werner A1 - Thöns, Sebastian T1 - Integrated Monitoring Systems for Offshore Wind Turbines T2 - 6th International Workshop on Structural Health Monitoring CY - Stanford, USA DA - 2007-09-11 KW - Integrated Monitoring System KW - Damage Identification KW - Load Monitoring KW - Wind turbines PY - 2007 SP - 1 EP - 8 AN - OPUS4-16280 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - GEN A1 - Thöns, Sebastian A1 - Faber, M.H. A1 - Rücker, Werner A1 - Rohrmann, Rolf ED - Martorell, S. ED - et al., T1 - Assessment and monitoring of reliability and robustness of offshore wind energy converters T2 - ESREL 2008 CY - Valencia, Spain DA - 2008-09-22 KW - Structural reliability KW - Robustness KW - Monitoring KW - Risk KW - Wind energy converter PY - 2008 SN - 978-0-415-48513-5 SP - 1567 EP - 1572 PB - Taylor & Francis CY - London, UK AN - OPUS4-18565 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Schneider, Ronald A1 - Thöns, Sebastian A1 - Rücker, Werner A1 - Straub, D. ED - Deodatis, G. ED - Ellingwood, B.R. ED - Frangopol, D.M. T1 - Effect of different inspections strategies on the reliability of Daniels systems subjected to fatigue N2 - Inspections are an efficient means of enhancing the reliability of redundant structural Systems subjected to fatigue. To investigate the effect of such inspections, we represent the deterioration state of a Daniels System by means of a probabilistic fatigue crack growth model of all elements, which considers stochastic dependence among element fatigue behavior. We include inspection results in the calculation of the System collapse probability through Bayesian updating of the System deterioration state. Based on this approach, we calculate the collapse probability of a deteriorating Daniels System conditional on different inspection strategies in terms of inspection coverage and inspection times. The acceptability of an inspection strategy is verified by comparing the calculated collapse probabilities with maximum acceptable System failure probabilities. This study is a Step towards identifying optimal inspection strategies for redundant structural Systems subjected to fatigue. T2 - 11th International conference on structural safety and reliability - Safety, reliability, risk and life-cycle performance of structures and infrastructures CY - New York, USA DA - 16.06.2013 PY - 2013 SN - 978-1-138-00086-5 SN - 978-1-315-88488-2 SP - 1 EP - 8 PB - CRC Press CY - Leiden, The Netherlands AN - OPUS4-28984 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CHAP A1 - Thöns, Sebastian A1 - Faber, M.H. A1 - Rücker, Werner T1 - Life cycle cost optimized monitoring systems for offshore wind turbine structures N2 - Monitoring information should be utilized to support optimal decisions. In this sense monitoring systems should be designed such as to optimize expected Life Cycle Costs. PY - 2013 SN - 978-3-200-03179-1 IS - Chapter 4 SP - 75 EP - 90 CY - Vienna, Austria AN - OPUS4-29103 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Rücker, Werner A1 - Thöns, Sebastian A1 - Said, Samir A1 - Schmid, Wolfgang ED - Zingoni, A. T1 - SHM strategies, application and measurements on tripod offshore wind energy converters within the German offshore park Alpha Ventus N2 - Prototypes of wind turbines of the megawatt dass are to be built and tested until 2008 within a German offshore wind energy test field in the North Sea (ALPHA VENTUS). To ensure a high operational reliability of offshore wind turbines with economically acceptable repair and maintenance efforts, comprehensive diagnosis and supervision concepts are required. Automatic monitoring Systems will be an essential part of such concepts. Because of the fact, that during Operation there will be static and dynamic interaction between the components ‘structure’, ‘machinery’ and ‘blades’ it is necessary to develop the monitoring techniques in an overall concept. These monitoring Systems are supposed to be applied for the design and testing as well as for the Operation and maintenance phases. In the paper the developed approaches for the measurement of actions and the condition monitoring of all components of an offshore wind energy plant will be shown. T2 - Research and applications in structural engineering, mechanics and computation - 5th International conference on structural engineering, mechanics and computation CY - Cape Town, South Africa DA - 02.09.2013 PY - 2013 SN - 978-1-138-00061-2 SN - 978-1-315-85078-8 SP - 977 EP - 982 PB - CRC Press AN - OPUS4-29104 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - GEN A1 - Rohrmann, Rolf A1 - Rücker, Werner A1 - Thöns, Sebastian A1 - Said, Samir A1 - Schmid, Wolfgang T1 - Ergebnisse der Dauerüberwachung an einem Prototypen von Offshore-Windenergieanlagen T2 - 3. VDI-Fachtagung - Baudynamik CY - Kassel, Deutschland DA - 2009-05-14 KW - Integrated Monitoring System KW - Offshore wind turbines KW - Assessment KW - Damage identification KW - Load monitoring PY - 2009 SN - 978-3-18-092063-4 SN - 0083-5560 VL - 2063 SP - 455 EP - 466 PB - VDI-Verl. CY - Düsseldorf AN - OPUS4-19795 LA - deu AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - RPRT A1 - Fischer, J. A1 - Straub, D. A1 - Schneider, Ronald A1 - Thöns, Sebastian A1 - Rücker, Werner T1 - Intelligente Brücke - Zuverlässigkeitsbasierte Bewertung von Brückenbauwerken unter Berücksichtigung von Inspektions- und Überwachungsergebnissen N2 - Der vorliegende Bericht beschreibt Konzepte für eine intelligente Brücke auf der Grundlage einer zuverlässigkeitsbasierten Zustandsbewertung unter Berücksichtigung von Bauwerksinformationen, welche aus Prüfungen, Inspektionen und Überwachung gewonnen werden. Das Brückensystem wird durch ein Modell beschrieben, welches den zentralen Teil des Konzeptes darstellt. Das Modell wird in Schädigungsmodelle und ein Tragwerkssystem-Modell unterteilt. Dieses Modell wird a-priori durch die Eingangsdaten (welche etwa die Geometrie, die Materialien und die Verwendung der Brücke beschreiben) charakterisiert. Aus diesen ergeben sich dann auch die Ausgangsmodelle. Um die signifikanten Streuungen und Unsicherheiten adäquat abzubilden sind diese Modelle probabilistisch. Das Modell liefert eine sich kontinuierlich ändernde probabilistische Zustandsbewertung. Die Zustandsbewertung gibt eine Aussage über den Zustand und die Zuverlässigkeit des Brückensystems und seiner Bauteile und dient als Grundlage für die Planung und die Optimierung von Maßnahmen. Die Verwendung von Resultaten aus Inspektionen, Prüfungen und Überwachungen erfolgt durch eine Aktualisierung der Modellparameter. Die Aktualisierung beruht auf der Methode der Bayes'schen Aktualisierung und wird auf der Grundlage der entwickelten Klassifizierung der Bauwerksinformationen mit entsprechenden Methoden durchgeführt. Dieses Verfahren erlaubt es, alle Informationen in konsistenter Weise in ein einziges Modell einfließen zu lassen. Dabei wird die Genauigkeit und Aussagekraft der gewonnenen Daten und Beobachtungen explizit berücksichtigt. Durch die Aktualisierung der Modellparameter unter Berücksichtigung von Systemeffekten wird die Zustandsbewertung der Bauteile und des Brückensystems aktualisiert. Das ermöglicht die Planung und die Optimierung von Maßnahmen unter Berücksichtigung der Bauwerksinformationen. Auf diese Weise wird die intelligente Brücke mit Inspektionen und Überwachungen zu einem adaptiven System, welches sich Veränderungen anpassen kann.---------------------------------------------------------------------------------------------------------------------------------------------------------------------------This report describes concepts for an intelligent bridge on the basis of a reliability-based condition assessment utilizing inspection and monitoring data. The central part of the concept is a model describing the bridge system. The overall bridge model is comprised of deterioration models and a mechanical system model of the structure. The model is a-priori characterized by the input data (such as the geometry, the materials, and the utilization of the bridge). Significant uncertainties in the deterioration modeling as well as the load conditions motivate a probabilistic modeling. The model enables a continuously updated probabilistic condition assessment. It provides information about the condition and the reliability of the bridge system and its components and serves as a basis for the planning and the optimization of maintenance actions. Inspection, measurement, and monitoring information are included by updating the model parameters. Bayesian updating is utilized for the updating of the model parameters and is performed on the basis of the developed classification of structural information and the corresponding procedures. These methodologies allow to consistently incorporate all available information into the model and the prediction. Thereby, the precision and the validity of the data and observations are explicitly accounted for. The condition assessment of the bridge system and its components is updated by updating the model parameters, and maintenance actions can be planned and optimized taking into account all available information in a rational and consistent manner. In this way, the intelligent bridge with inspections, measurements, and monitoring information becomes an adaptive system, which has the ability to adjust to changes. KW - Berechnung KW - Brücke KW - Dauerhaftigkeit KW - Deutschland KW - Echtzeit KW - Forschungsbericht KW - Kontinuierlich KW - Kontrolle KW - Messung KW - Prognose KW - Prüfverfahren KW - Rechenmodell KW - Sachschaden KW - Tragfähigkeit KW - Wahrscheinlichkeit KW - Zustandsbewertung PY - 2014 UR - http://bast.opus.hbz-nrw.de/volltexte/2014/768/pdf/BASt_B_99_ELBA_PDF.pdf SN - 978-3-95606-078-6 SN - 0943-9293 IS - B 99 SP - 1 EP - 111 PB - Fachverlag NW in der Carl Schünemann Verlag GmbH CY - Bremen AN - OPUS4-31300 LA - deu AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Rohrmann, Rolf A1 - Rücker, Werner A1 - Thöns, Sebastian A1 - Said, Samir T1 - Design and operation of integrated monitoring systems for offshore wind turbines N2 - To ensure a high operational reliability of future generations of offshore wind conversion systems (OWEC) with economically acceptable repair and maintenance efforts, comprehensive diagnosis and supervision concepts are required. Automatic monitoring systems will be an essential part of such concepts. Because of the fact, that during operation there will be static and dynamic interaction between the components 'structure', 'machinery' and 'blades' it is necessary to develop the monitoring techniques in an overall concept. These monitoring systems are supposed to be applied for the design and testing as well as for the operation and maintenance phases. The used methods are focused on the design requirements for the structure, which are stated in the respective standards and certification guidelines. For the validation of the design, methods are specified which would be also applicable for SHM in the operating condition, e.g. for the evaluation of the structural conditon possibly after the occurrence of damages or changes. The further task consists in the realization of condition monitoring for all components, aiming at early damage detection and the observation of the damage development and its evaluation. Here the task consists of determining with assessment procedures the optimum time for maintenance actions to be carried out. T2 - DEWEK 2008 - 9th German wind energy conference CY - Bremen, Germany DA - 2008-11-26 KW - Integrated monitoring system KW - Offshore wind turbines KW - Assessment KW - Damage identification KW - Load monitoring PY - 2008 SP - 1 EP - 4(?) AN - OPUS4-19872 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Rohrmann, Rolf A1 - Thöns, Sebastian A1 - Rücker, Werner A1 - Bicker, S. A1 - Said, Samir A1 - Schmid, Wolfgang T1 - Structural investigations and monitoring results on a prototype of offshore wind turbines of multibrid M5000 series N2 - The concept and technical details of the implementation of the developed integrated monitoring system within the IMO-WIND project are presented. The tasks of the components of the system and its requirements are described. Selected results from the continuous monitoring during operation of the plant M5000_2 regarding the task design verification and dynamic structural analysis are given. T2 - DEWEK 2010 - 10th German wind energy conference CY - Bremen, Germany DA - 2010-11-17 KW - Integrated monitoring system KW - Offshore wind turbines KW - Design verification KW - Structural assessment KW - Limit values KW - Load transfer KW - Data management KW - Dynamic analysis KW - Rotor blades KW - Embedded sensors PY - 2011 IS - S03 SP - 1 EP - 5 PB - DEWI GmbH AN - OPUS4-23712 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Thöns, Sebastian A1 - Faber, M.H. A1 - Rücker, Werner ED - Faber, M.H. ED - Köhler, J. ED - Nishijima, K. T1 - On the utilization of monitoring data in an ultimate limit state reliability analysis N2 - This paper describes a structural reliability analysis utilizing monitoring data in the ultimate limit state with consideration of the uncertainties of the monitoring procedure. For this purpose the uncertainties of the monitoring data are modeled utilizing a new framework for the determination of measurement uncertainties. The approach is based on a process equation and Statistical models of observations for the derivation of a posterior measurement uncertainty by Bayesian updating. This facilitates the quantification of a measurement uncertainty using all available data of the measurement process. For the reliability analysis in the ultimate limit state, monitoring data can be utilized as a loading model Information and as proof loading, i.e. resistance model Information. Both approaches are discussed with generic examples and it is shown that the modeling of monitoring data in a reliability analysis can result in a reduction of uncertainties and as a consequence in the reduction of the probability of failure. Furthermore, the proof loading concept is developed further to account for the uncertain characteristic of proof loading due to the measurement uncertainties which is consistent with the framework for the determination of measurement uncertainties. These approaches and findings can be utilized for the assessment of structures for life cycle extension and the design of monitoring Systems. T2 - ICASP 11 - 11th International conference on applications of statistics and probability in civil engineering CY - Zurich, Switzerland DA - 01.08.2011 PY - 2011 SN - 978-0-415-66986-3 SP - 1762 EP - 1769 PB - Taylor & Francis CY - London AN - OPUS4-24292 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER -