TY - CONF A1 - Schilling, O. A1 - Müller, Lars A1 - Ballheimer, Viktor A1 - Komann, Steffen A1 - Wille, Frank T1 - ANALYTICAL APPROACHES WITHIN THE ASSESSMENT STRATEGY OF NUMERICAL ANALYSES OF COMPONENTS OF RAM PACKAGES T2 - PATRAM 2013 T2 - PATRAM 2013 CY - San Francisco, CA, USA DA - 2014-08-18 PY - 2014 AN - OPUS4-31563 LA - deu AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Müller, Lars A1 - Schilling, O. A1 - Ballheimer, Viktor A1 - Wille, Frank A1 - Komann, Steffen T1 - Assessment strategy of numerical analyses of RAM package components - 14619 T2 - WM2014 Conference (Proceedings) N2 - In Germany current package design safety cases include more and more advanced numerical methods, e. g. finite element analysis (FEA), often in combination with local concepts of strength evaluation of the structure. This approach requires extensive modeling and verification procedures. As a consequence the efforts of authority assessment of design safety analysis increase as well. Only the check of pre- and post-data of numerical calculations is often not sufficient for the safety assessment. On the other hand own analyses of the mechanical problem by performing an Independent numerical modeling and analyzing is not always realizable. Therefore it is necessary to look for optimized procedures of the assessment, without loss of safety. This paper shows possibilities for the assessment strategy of numerical analyses with focus on simple analytical approaches as comparative calculations. Such approaches can be helpful to support evaluation of numerical calculations in the whole assessment procedure. Three examples are considered to Show which possibilities and limits exist to support the assessment of numerical analyses using analytical comparative calculations. Two examples of bolt and lid analysis show the influence of component and boundary stiffness on the results. Thickness to length/width ratios are partially exceeded and only fixed or free boundary conditions can be analyzed analytical. Nevertheless These analytical approaches can help to evaluate the numerical results for the assessment. The example of a trunnion demonstrates the limits of analytical approaches. The trunnion shows a complex deformation behavior and local stresses. A single basic theory isn’t matching and a construct of several approaches is not useable for calculations of local stresses. Therefore numerical calculations during assessment are necessary. Analytical approaches are not always purposeful but often effective to reduce the effort of assessment for numerical analysis of complex and safety relevant components of RAM packages. T2 - WM2014 Conference CY - Phoenix, Arizona, USA DA - 02.03.2014 PY - 2014 SN - 978-0-9836186-3-8 SP - Paper 14619, 1 EP - 14 AN - OPUS4-31047 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Schilling, O. A1 - Müller, Lars A1 - Ballheimer, Viktor A1 - Komann, Steffen A1 - Wille, Frank T1 - Analytical approaches within the assessment strategy of numerical analyses of components of RAM packages T2 - PATRAM 2013 - 17th International symposium on the packaging and transportation of radioactive materials (Proceedings) N2 - Load attachment points, consisting of the lifting component and corresponding bolt connections, and lid systems, consisting of a lid, gaskets and bolt connections, are usually analyzed numerically using the Finite Element Method. Reasons for applying the FEM are complex geometry, specific load distribution and the violation of application criteria for analytical approaches. For example the elementary beam theory is not suitable for the calculation of compact trunnions and the Kirchhoff plate theory is not suitable for the calculation of lids with a large thickness to diameter ratio because the Bernoulli-hypothesis is violated. In addition for structural integrity assessments often local stress and for the evaluation of lid systems tightness local contact opening are needed, which can be obtained only through accurately discretized numerical models. Independent comparative calculations are essential for complex calculations. Simplified but appropriate analytical approaches are an efficient way of examination. Is it possible to provide conservative analytical estimates of such kind of analysis problems? Are analytical calculations an appropriate approach in today's authority assessment business? Using the example of bolted trunnion and lid systems of a heavy package the possibilities and limits of analytical comparative calculations are shown. T2 - PATRAM 2013 - 17th International symposium on the packaging and transportation of radioactive materials CY - San Francisco, CA, USA DA - 18.08.2013 PY - 2013 SP - Paper 217, 1 EP - 9 PB - Omnipress AN - OPUS4-31048 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Neumann, Martin A1 - Schilling, O. A1 - Kuschke, Christian A1 - Darnstädt, A. A1 - Schubert, Sven A1 - Günther, U. A1 - Wille, Frank T1 - Requirements for management systems for manufacturing of transport packages: the new revision of BAM-GGR 011 guideline T2 - Proceedings of the 19th International Symposium on the Packaging and Transportation of Radioactive Materials PATRAM 2019 N2 - In accordance with IAEA SSR-6 para 306 a management system shall be established and implemented to ensure compliance with the relevant provisions of the IAEA regulations. BAM has issued an update of the guideline: the BAM-GGR 011. The new revision describes necessary quality assurance measures for design, manufacture, testing, documentation, use, maintenance and inspection of packagings for package designs requiring competent authority approval for the transport of radioactive material. The measures can be categorised as system-related and design-related. They are independently approved and monitored by the German competent authority BAM and its authorised expert (BAM/T). The qualification of the organisation applying for the design approval certificate is reviewed in the context of the design approval procedure. The quality assurance measures for manufacture consist of three main steps. Pre-assessment of manufacturing documents such as quality plans, specifications etc., Manufacturing inspections according the pre-assessed documents and inspection before commissioning including documentation review. Periodic inspections during operation as well as relevant specifications for use and maintenance ensure that the properties specified in the approval certificate are preserved over the package life time. Special provisions for the return on experience regarding operational feedback for design, manufacture, use, maintenance and inspection are given. Special focus shall be given here to the rearranged and meanwhile established system of manufacturing inspections. This includes more transparent roles for a) the Producers authorised inspection 11282 representative, b) the independent inspection expert (S), acting on behalf of the manufacturer with acceptance of BAM, and c) BAM or its authorised expert (BAM/T). Additional attention shall be drawn to the management of deviations during manufacturing and provisions for maintenance and periodic inspections. T2 - 19th International Symposium on the Packaging and Transportation of Radioactive Materials PATRAM 2019 CY - New Orleans, LA, USA DA - 04.08.2019 KW - Quality assurance KW - Transport KW - Manufacturing KW - Surveillance KW - Radioactive material PY - 2019 SP - Paper 1128, 1 AN - OPUS4-49059 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Schilling, O. A1 - Neumann, Martin A1 - Wolff, Dietmar A1 - Wille, Frank A1 - Darnstädt, A. T1 - System of Quality Assurance Measures in Manufacturing and Operation of Dual Purpose Casks for Spent Nuclear Fuel and High Level Waste in Germany N2 - German spent nuclear fuel and high level waste is stored in dry conditions in interim storage facilities until a final repository will be ready for operation in the future. Dual purpose casks are used for the packaging of the materials to ensure transportability at any time during long-term interim storage and fulfilling both requirements from interim storage as well as transport. Germany’s 2011 decision to phase out utilization of nuclear energy has led to a high demand for casks for decommissioning power plants as quickly as possible. Cask serial production will continue at a high level for the next few years. In the process, a system of quality assurance measures ensures that every cask reliably complies with design specification according the transport approval certificate and storage license. When the first casks were manufactured in Germany about 40 years ago, quality assurance was oriented towards pressure vessel and general nuclear manufacturing. The system was continuously adapted to the state of the art. In particular serial production, globalization of manufacturing and deep supplier chains had to be taken into account. The system of quality assurance measures applied today for cask manufacturing shall be presented here. The quality assurance measures can be categorized as system-related and design-related. With respect to transport regulations for example, they are independently approved and monitored by the competent authority BAM and its authorized inspection experts. The qualification of the applicant is reviewed first in the context of the design approval procedure and then periodically. The qualification of component and cask manufacturers is also checked at the start of manufacturing and then periodically. Before the start of manufacturing documents such as quality plans are pre-assessed. Manufacturing and inspection are then performed according to the pre-assessed documents. Cask manufacturing is completed by a final inspection before commissioning. Periodic inspections during operation ensure preservation of the properties specified in the approval certificate over package life time. The type and the time interval of periodic inspections depend on the use of the package. For transport after interim storage a system of specific tests and inspections is prescribed. T2 - 20th International Symposium on the Packaging and Transportation of Radioactive Materials (PATRAM 22) CY - Juan-les-Pins, France DA - 11.06.2023 KW - Radioactive material KW - Quality Assurance Measures KW - Dual Purpose Casks KW - Independent Surveillance PY - 2023 AN - OPUS4-57705 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER -